| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹21.2 L+₹59,006.03 (2.87%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹20.9 L
EMD Value
₹21,000
Closing Date
12 Mar 2024, 3:00 pmClosed
Project Director
DRDA, Tirunelveli
Permanent Restoration by Constructing road and culvert in palayamkottai Block
2024_RDTN_442245_12
A4/819/tender/2024 flood
Open Tender
Civil Works
Item Rate
120 days
Tirunelveli
As per technical bid document
4 documents required · 4 mandatory
₹0
₹21,000
DRDA, Tirunelveli
28 Jun 2024
6 Mar 2024
12 Mar 2024
6 Mar 2024
12 Mar 2024
7 Mar 2024
7 Mar 2024
Amount
1) Permanent Restoration by Constructing 3 m span R.C.C culvert at Pottal Nagar in Seevalapperi panchayat in Palayamkottai Block
Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for foundation etc., complete.
Cement concrete 1:4:8 mix using 40m ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Centering charges for all concrete works including all cost and conveyance of all materials and all labour charges etc., complete.
For Shuttering - Below Sill Level
For Shuttering - Above Sill Level
For Deck Slab Centering
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete.
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete.
Supplying, Fabricating and placing in position of MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with standard specification.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete.
Supplying and filling with excavated earth inclduding all cost and conveyance and all labour charges for watering, ramming etc. complet
Providing weepholes in brick masonry stone masonry plain/reinforced concrete abutment wing wall, return wall with 75mm dia pvc pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
Providing and fixing 6mm Bitmen felt for expansion joint between dirtwall deck slab
2) Permanent Restoration by Strengthening Poolankudiyiruppu Road km 0/0- 0/200 in Kunnathur panchayat in Palayamkottai Block
Clearing andGrubbing road landing uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm,removal of the stumps such trees cut earlier and disposal of unserviceable materials and stacking of servicable materialsto be used or auctioned,upto lead of 1000m including and disposal of top organic soil not exceeding 150mm thicknes as per Technical specification Claus 201,(i) (A) -Scrub Jungle Clearance
Scrafying the existing bituminous road surface to a depth of 150 mm and displosal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical specification clause 301.4
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte. SS 20 A
Providing and Laying gritty Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying 75mm compacted thick wbm grade II using 1 cum of 75mm to 22.4mm IRC HBG and 0.24 cum of gravel for blindage for 10 sqm of 75mm compacted thick ( the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds, watering with all leads for good water slurrying rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc. complete
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion ncluding cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Tack coat over WMM surface (treated with primer) using 2.50 Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat by bitumen sprayer Km 0/0-0/550
Providing and laying Bituminious concrete to specified thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of specified thick with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 Km 0/0-2/800
Provision of Rumble strips with premix Bituminous carpet Providing Rumble strips covered with premix Bituminous carpet 20mm hgh at center 250mm vide placed at 1m center to center at approved locations to control speed market with white strips of road marking paintKm 0/0-2/0
Provision of Hectametre Stone
Provision for village name board
i) Construction of Retaining wall
Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for foundation etc., complete.
Cement concrete 1:4:8 mix using 40m ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Centering charges for all concrete works including all cost and conveyance of all materials and all labour charges etc., complete.
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M MOHAMMED HAKKIM
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_526746.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .