Tender Value
₹17.5 Cr
EMD Value
₹23.8 L
Closing Date
1 Jun 2026, 3:00 pmClosed
PRABHAT KUMAR
Executive Engineer
P.H Division Gopalganj Near Minz Stadium Pani Tanki
DAYASHANKAR PRASAD
CHIEF ENGINEER (DESIGN)
Comprehensive operation and maintenance, routine repairs and Special repairs of a. Rural Piped Water Supply Scheme (PWS), b. Ward level Piped Water Supply Schemes in non quality affected wards (WLS_Non Quality) based on item rates; constructed by the Public Health Engineering Department including payment to the pump operators, electricity bills for five years.
130344
NIT-01/2026-27/O&M-PHED/PWS/WLS GOPALGANJ
Open Tender
CIVIL
Gopalganj
• Registration Certificate of appropriate Class of Govt. of Bihar
• GST REGISTRATION NUMBER
• PAN
• Valid Mobile no and Email Id
• Character certificate
• Affidavit
• Accept all terms and condition as per Nit/Tender Documents
• Any Other Documents required as per NIT/ Standerd Bidding Documents
CIVIL
PERCENTAGE
L1
1
23 documents required · 23 mandatory
₹10,000
Processing Fee: 5900
₹23.8 L
Yes
P.H Division Gopalghanj Near Minz Stadium Gopalganj
25 Aug 2026
1 May 2026
1 Jun 2026
1 May 2026
1 Jun 2026
1 May 2026
4 May 2026
NIT No – 01/2026-27/O&M-PHED/PWS/WLS/Gopalganj
NAME OF WORK- Part I: Fixed Operation of i.) Rural Piped Water Supply Scheme (PWS), ii.) Ward level Piped Water Supply Schemes in non quality affected wards (WLS_Non Quality) by deploying pump operators and payment of electricity charges and Part II: Variable Comprehensive Operation & Maintenance of i.) Rural Piped Water Supply Scheme (PWS), ii.) Ward level Piped Water Supply Schemes in non quality affected wards (WLS_Non Quality) , i.e. the cost of chemicals and cleaning of ESR and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in districbuition line, repair and provision of new FHTCs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of Engineer-in-charge. in Blocks:- 12 No. of schemes: 96 WLS(Non Quality): 77 PWS (Non Quality): 19
Date of Tender :- 16.04.2026
Estimated Cost :- 1754.829 Lakh
Earnest Money :- 23.78 Lakh
Duration of Maintenance Period 60 Months
Cost of BOQ :- 1754.829 Lakh
SI. NO. PARTICULARS No. of Scheme AMOUNT (IN LAKH)
1 I. Operation of ward level piped water supply schemes (NQ affected) by deploying pump operators and payment of electricity charges. II. Comprehensive maintenance of Ward level water supply schemes (NQ affected) i/c the cost of chemicals, cleaning of ESR and campus, maintenance viz. claning painting of pump house, boundary wall, repair of leakages in districbuition line, repair and provision of new FHTCs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of Engineer-in-charge. PWS:- 19 Nos. WLS :-77 Nos. (Non Quality) 1754.829
Total Amount = 1759.281
Rupees Seventeen Crore Fifty nine Lakh Twenty Eight Thousand and One Hundred Only
1 Estimated cost In Rs. 175,482,900.00 (A)
2 Cost of Govt. Material :- NIL NIL (B)
3 Name of the Contractor :-
4 Address of the Contractor :-
5 I/we offer in Figures……. in words………………… % (Percentage) High on the rate for the fixed cost (Part I) for operation of the schemes. IN FIG.
6 I/we offer in Figures……. in words………………… % (Percentage) High / Less on the rate for the variable cost (Part-II) for maintenance of the schemes. IN FIG.
7 Average rate quoted by the bidder ………………… % (Percentage) {(25% of Fixed Cost + 75% of Variable Cost)/2}
8 Amount as per Average rate quoted by the bidder in Cloumn (7)……...(in Rs.) IN FIG.
Note :- 1.) Bidders has to quote rate in Percentage High/Less only.
Note :- 2.) Items/ Quantity of Work will be decided by the department on day to day / priority basis during period of maintenance.
Note :- 3.) The quoted rate for the operation part I (fixed cost) i.e. the payment to the operators and the electricity bills, the quote shall not be negative.
Note :- 4.) The electricity bills shall be paid as per actual.
Note :- 5.) The entry in row 7 shall be considered for decision of financially lowest bid.
Executive Engineer, P.H.Division, Gopalganj
NIT No – 01/2026-27/O&M-PHED/PWS/WLS/GOPALGANJ
TECHNICAL BID SHEET
Name of Work Comprehensive operation and maintenance, routine repairs and Special repairs of a. Rural Piped Water Supply Scheme (PWS), b. Ward level Piped Water Supply Schemes in non quality affected wards (WLS_Non Quality) based on item rates; constructed by the Public Health Engineering Department including payment to the pump operators, electricity bills for five years. Cost of Work as per BOQ(Rs in Lakhs) 1754.829 Time of Completion in months 60 ALL COLOURED CELL TO BE FILLED ACCORDINGLY
Sanctioned Amount (in Lakh) 1754.829 As per Technical Approval Date of Tender 16.04.2026
Sl No. Items Requirement Requirement Cl. No.
Name of the Contractor
Address of the Contractor
1 Bid Validity Bids shall remain valid for a period not less than 180 days after the deadline date. A Bid valid for a shorter period shall be rejected by the Employer as non-responsive 180 Days 15.1 Page/17 Bid validity periods In days
2 Bid Security Unconditional bank guarantee from any scheduled Indian bank issued within the state in the format given (If issued from any bank outside state will be converted to any bank within the state before executing the agreement, duly pledged in favour of the Executive Engineer, P.H. Division, Gopalganj 16.1 Page-17 Amount To be entered (Rs in Lakhs)
Bid Security Amount - (Rs. In Lakhs) 23.78 Bid Security Amount - Rs. 0.00
3 (i) Legal Status of Bidder. 4.3(a) Page-12
(ii) Place of Registration.
(iii) Principal place of Business
(iv) Power of attorney of signatory Bid Attached or Not 4.2(iv) Page-11
4 Total value of civil engineering construction work performed in last five years. attached shall have valid Unique Document Identification Number (UDIN Achieved in any one year a minimum annual financial turnover (in all classes of civil engineering construction works only) volume of construction work of at least the amount equal to the 50% (fifty percent) estimated cost of works for which bid has been invited. The turnover will be indexed at the rate of 8% for a year. The certificates attached in support of turnover). 877.415 4.5A (a) Page-12
2020-21 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.47 0.00000
2021-22 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.36 0.00000
2022-23 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.26 0.00000
2023-24 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.17 0.00000
2024-25 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.08 0.00000 0.00000
5 Work Experience of Similar nature Satisfactorily completed as a prime contractor (or as a nominated sub contractor, where the sub contract involved execution of all main items of work described in the bid document, provided further that all other qualification criterion are satisfied) at least one similar work of value not less than the amount indicated in the appendix (Not less than 10% (Ten percent) estimated value of contract. 175.4829 4.5A (b) Page -12-13 Amount To be entered (Rs in Lakhs)
6 Minimum Quantities of work done of similar nature during last five years. Executed the minimum quantities of the following item of work as indicated in the appendix:
Items Unit Quantity 4.5A(c) Page-12-13
High Yielding Tube well Nos. Value to be entered in unit Nos
Pump/ Motor Nos. Value to be entered in unit Nos
Distribution Main meter Value to be entered in unit Meter
House Connection Nos. Value to be entered in unit Nos
RCC/Steel Staging Nos. Value to be entered in unit Nos
7 Bidding Capacity: Should be more than Available Bid capacity = (A x N x 3 - B)= Rs. _____, Where A= Maximum Value of work executed in any one year during last 5 yrs. , N = Number of years prescribed for completion of the works (Design Build Period) for which bids are invited, B= Value (updated to the price level of the year indicated in Appendix) of existing commitments and on-going works to be completed during the period of completion of the works for which bids are invited. 1754.829 4.7 Page-20 Amount To be entered (Rs in Lakhs)
8 (a) Existing commitments and ongoing works Page - 20 Amount To be entered (Rs in Lakhs)
(b) Work for which Bid already submitted Page - 20 Amount To be entered (Rs in Lakhs)
9 Availability of key items of Contractor's Equipment Type of Equipment/Maximum age No. Required Nos. Max. Age 4.5(B) (b) Page-26 Annexure-I Nos./ Max. Age
Concrete Mixer 2 5
Rotary Drilling / Reverse Rotary / DTH Rig Machine 2 10
Truck/Tractor with trailer 2 5
Hydraulic Excavator 1 5
10 Key Personnel Rs. 30 –50 Crores 4.5(B) (b) Page-34 Annexure-II Name of the Personnel and Experience in years
Project Manager B.E. Civil + 10Years Exp. (5 years as Manager in PHED works) or retired E.E. & above of PHED 1
Site Engineer B.E. Civil + 07Years Exp. (3 years as Manager in PHED works) or retired A.E. & above of PHED 2
Site Supervisor B.E. Mech./Civil + 05 Years Exp. Or Dip. Mech./Civil + 07 years Exp. Or or retired J.E. & above of PHED 10
Surveyor .B E. Civil + 03 Years Exp. orDip. Civil + 05 years Exp. 1
11 Evidence of accesses to Financial Resources Evidence of access to or availability of credit facilities (10% of estimated cost), certified by bankers (Not more than 3 months old). (Rs in Lakhs). 175.4829 Page 15 4.3 (g) Amount To be entered (Rs in Lakhs)
12 Proposed methodology and programme of construction. Justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion as per milestones. (Attached or not) Page 15 4.3 (l)
13 Litigation History Information regarding any litigation, current or during the last five years, in which the Bidder is involved, the parties concerned, and disputed amount. (Attached or not) Page 15 4.3 (j)
14 Affidavit Regarding statements made in the required attachments are true and correct. Page 23 12.1 (iv)
15 Undertaking Able to invest a minimum of cost upto 25% of contract value of work. During implementation of contract. 25 % of B.O.Q.Amount 438.707 Page 12 4.3 (h)
18 Character Certificate
19 No Dues Certificate The bidders are required to submit a duly “Notarized affidavit” stating that there are no outstanding electricity dues pending for payment against all electric consumer numbers in their completed or ongoing operation & maintenance contracts till 31.03.26. The affidavit shall be duly supported/ substantiated by a “no due certificate” that there are no outstanding electricity dues pending for payment against all electric consumer numbers in their completed or ongoing operation & maintenance contracts till 31.03.2026 duly issued by the concerned Executive Engineer(s). NIT Clause (31)
20 Time of Completion 60 Months To be entered in months
Executive Engineer,
P.H. Division, Gopalganj
QUALIFICATION INFORMATION
The information to be filled in by the Bidder in the following pages will be used for purposes of post qualification as provided for in Clause 4 of the Instructions to Bidders. This information will not be incorporated in the Contract.
NAME OF THE CONTRACTOR
1 For Individual Bidders
1.1 Constitution or legal status of Bidder (Attach copy)
Place of registration :
Principal place of business :
Power of attorney of signatory of Bid (Attach)
1.2 Total value of Civil Engineering construction work performed in the last five years** (in Rs. Million)
1.3.1 Work performed as prime contractor, work performed in the past as a nominated sub- contractor will also be considered provided the sub-contract involved execution of all main items of work described in the bid document, provided further that all oth
NAME OF THE CONTRACTOR
Project Name Name of the Employer* Description of work Contract No. Value of Contract (Rs. In Crore) Date of issue of work order Stipulated period of completion Actual date of completion* Remarks explaining reasons for delay & work completed)
* Attach certificate(s) from the Engineer(s)-in-Charge
** Immediately preceding the financial year in which bids are received.
Attach certificate from Chartered Accountant.
1.3.2 Quantities of work executed as prime contractor, work performed in the past as a nominated sub-contractor will also be considered provided the sub-contract involved execution of all main items of work described in the bid document, provided further that all other qualification criteria are satisfied (in the same name and style) in the last five years.
NAME OF THE CONTRACTOR
Year Name of the work Name of the Employer* Quantity of work performed
Remarks* (indicate contract Ref)
1.4 Information on Bid Capacity (works for which bids have been submitted and works which are yet to be completed) as on the date of this bid.
(A) Existing commitments and on-going works:
NAME OF THE CONTRACTOR
Description of works Place & State Contract No. Name & Address of Employer Value of Contract (Rs Cr) Stipulated Period of Completion Value of works* remaining to be completed (Rs Cr) Anticipated date of completion
* Attach certificate(s) from the Engineer(s)-in-Charge
The item of work for which data is requested should tally with that specified in ITB clause 4.5A ©
** Immediately preceding the financial year in which bids are received.
# Delete, if prequalification has been carried out.
(B) Works for which bids already submitted :
Description of works Place & State Name & Address of Employer Estimated value of works (Rs Cr) Stipulated period of completion Date when decision is expected Remarks, if any
1.5 Availability of key items of Contractor’s Equipment essential for carrying out the Works [Ref. Clause 4.5(B)(a)]. The Bidder should list all the information requested below. Refer also to Sub Clause 4.3 (d) of the Instruction to Bidders.
NAME OF THE CONTRACTOR
Description of works Requirement Availability proposals Remarks (from whom to be purchased)
No. Capacity Owned/Leased to be procured Nos./Capacity Age/ Condition
1.6 Qualifications and experience of key personnel required for administration and execution of the Contract [Ref. Clause 4.5(B)(b)]. Attach biographical data. Refer also to Sub Clause 4.3 (e) of instructions to Bidders and Sub Clause 9.1 of the Condition
NAME OF THE CONTRACTOR
Position Name Qualification Year of Experience (General) Years of experience in the proposed position
1.7 Proposed sub-contracts and firms involved. [Refer ITB Clause 4.3(k)]
NAME OF THE CONTRACTOR
Sanction of the works Value of Sub-contract Sub-contractor (Name & Address) Experience in similar work
Attach copies of certificates on possession of valid license for executing water supply/ sanitary work/ building electrification works [Reference Clause 4.5(d) & Clause 4.5(e)]
*1.8 Financial reports for the last five years: balance sheets, profit and loss statements, auditors' reports (in case of companies/corporation), etc. List them below and attach copies.
1.9 Evidence of access to financial resources to meet the qualification requirements: cash in hand, lines of credit, etc. List them below and attach copies of support documents.
1.10 Name, address and telephone, telex and fax numbers of the Bidders' bankers who may provide references if contacted by the Employer.
1.11Information on litigation history in which the Bidder is involved.
NAME OF THE CONTRACTOR
Other Party(ies) Employer Cause of Dispute Amount involved Remarks showing Present Status
1.12 Statement of compliance under the requirements of Sub Clause 3.2 of the instructions to Bidders. (Name of Consultant engaged for project preparation is ** ........................ …………….............................)
Proposed work method and schedule. The Bidder should attach descriptions, drawings and charts as necessary to comply with the requirements of the Bidding documents. [Refer ITB Clause 4.1 & 4.3(1)]
1.15 Quality Assurance Programme
2 Additional Requirements
2.1 Bidders should provide any additional information required to fulfill the requirements of Clause 4 of the Instructions to the Bidders, if applicable.
(ii) Undertaking
*** (iii) Update of original prequalification application
*** (iv) Copy of original prequalification application
*** (v) Copy of prequalification letter
* Delete, if prequalification has been carried out.
** Fill the Name of Consultant.
*** Delete, if prequalification has not been carried out.
Check List for Submission Of Tender
Evaluation will be done as per the information provided in the document attached with tender. Bidder may disqualified, if documents are not attached properly.
Name of the Bidder
Sl. No. Checklist Items (Attach Documents in Edit Attachment Folder) Document attached
1 BIDSECURITY PHOTO COPY
2 LAST 5 YEARS ANNUAL TURN OVER
3 EXPERIENCE Of SIMILAR NATURE Of W0RKS
4 QUANTITY OF WORK OF SIMILAR NATURE EXECUTED DURING LAST 5 YEARS)
5 BALANCE VALUE OF ON GOING WORKS
6 EXISTING COMMITMENTS
7 BANKER'S CERTIFICATE FOR ACCESS OF FINACIAL RESOURCES
10 LITIGATION HISTORY
11 PLANT and MACHINARIES
12 KEY PERSONNEL
13 Registration
14 Power of Attoney
15 Legal Status Of Bidder
16 PROGRAMME Of CONSTRUCTION
17 NOC FOR DEBAR
18 LABOUR LICENCE
20 GST CERTIFICATE
21 Character Certificate
22 Any other Documens required as per NIT/ Standard Bidding Documents Required
IF YOU HAVE NOT BEEN DEBARED WRITE "NOT APPLICABLE" IN YOUR LETTER HEAD SCAN AND UPLOAD IN THE IN NOC FOR DEBAR LINK
Note:-Attachment should be self attested and should be attached as per above instruction, otherwise it may be rejected.
I, the undersigned, do hereby certify that all the statements made in the required attachments are true and correct.
Signature & Seal of the Bidder
NIT No – 01/2026-27/O&M-PHED/PWS/WLS/Gopalganj
NAME OF WORK- Part I: Fixed Operation of i.) Rural Piped Water Supply Scheme (PWS), ii.) Ward level Piped Water Supply Schemes in non quality affected wards (WLS_Non Quality) by deploying pump operators and payment of electricity charges and Part II: Variable Comprehensive Operation & Maintenance of i.) Rural Piped Water Supply Scheme (PWS), ii.) Ward level Piped Water Supply Schemes in non quality affected wards (WLS_Non Quality) , i.e. the cost of chemicals and cleaning of ESR and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in districbuition line, repair and provision of new FHTCs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of Engineer-in-charge. in Blocks:- 12 No. of schemes: 96 WLS(Non Quality): 77 PWS (Non Quality): 19
Date of Tender :- 16.04.2026
Estimated Cost :- 1754.829 Lakh
Earnest Money :- 23.78 Lakh
Duration of Maintenance Period 60 Months
Cost of BOQ :- 1754.829 Lakh
SI. NO. PARTICULARS No. of Scheme AMOUNT (IN LAKH)
1 I. Operation of ward level piped water supply schemes (NQ affected) by deploying pump operators and payment of electricity charges. II. Comprehensive maintenance of Ward level water supply schemes (NQ affected) i/c the cost of chemicals, cleaning of ESR and campus, maintenance viz. claning painting of pump house, boundary wall, repair of leakages in districbuition line, repair and provision of new FHTCs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of Engineer-in-charge. PWS:- 19 Nos. WLS :-77 Nos. (Non Quality) 1754.829
Total Amount = 1759.281
Rupees Seventeen Crore Fifty nine Lakh Twenty Eight Thousand and One Hundred Only
1 Estimated cost In Rs. 175,482,900.00 (A)
2 Cost of Govt. Material :- NIL NIL (B)
3 Name of the Contractor :-
4 Address of the Contractor :-
5 I/we offer in Figures……. in words………………… % (Percentage) High on the rate for the fixed cost (Part I) for operation of the schemes. IN FIG.
6 I/we offer in Figures……. in words………………… % (Percentage) High / Less on the rate for the variable cost (Part-II) for maintenance of the schemes. IN FIG.
7 Average rate quoted by the bidder ………………… % (Percentage) {(25% of Fixed Cost + 75% of Variable Cost)/2}
8 Amount as per Average rate quoted by the bidder in Cloumn (7)……...(in Rs.) IN FIG.
Note :- 1.) Bidders has to quote rate in Percentage High/Less only.
Note :- 2.) Items/ Quantity of Work will be decided by the department on day to day / priority basis during period of maintenance.
Note :- 3.) The quoted rate for the operation part I (fixed cost) i.e. the payment to the operators and the electricity bills, the quote shall not be negative.
Note :- 4.) The electricity bills shall be paid as per actual.
Note :- 5.) The entry in row 7 shall be considered for decision of financially lowest bid.
Executive Engineer, P.H.Division, Gopalganj
aoc.json
Purchase Order
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Nit_01_2026-27.pdf
NIT • 1.50 MB
Notes_To_tender_PHED_PWS_WLS.doc
NIT • 0.98 MB
Financial_Nit_01.xlsx
NIT • 0.22 MB
Nit_01_2026-27.pdf
NIT • 1.50 MB
Nit_01_Paper_cutting.pdf
NIT • 1.05 MB
Technical_Bid_Nit_01.xlsx
NIT • 0.09 MB
Financial_Nit_01.xlsx
NIT • 0.22 MB
C2 Corrigendum-II (1).pdf
Corrigendum • 0.35 MB
C1 corrigendum.pdf
Corrigendum • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .