Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical SHANKAR MARKET SARSAWAHA RAJA JAYANT PO JAYANT DIST SINGRAULI M P 486890 | JAYANT | SINGRAULI | MADHYA PRADESH | 486890 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical ADARSH NAGAR AURIMORE ANPARA DIST SONEBHADRA UP 231225 | SONBHADRA | UTTAR PRADESH | 231225 | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical LAXMI MARKET JAYANT PO JAYANT DIST SINGRAULI M P 486890 | 486890 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical 0 BELCHAURA MAUNATH BHANJAN MAU MAU UTTAR PRADESH 275101 | MAU | UTTAR PRADESH | 275101 | Admitted-Fee/PreQual/Technical |
Tender Value
₹50.3 L
EMD Value
₹63,000
Closing Date
12 Aug 2026, 11:00 amClosed
Staff Officer Civil
GM Office, Jayant Project, NCL, Singrauli
Making 300 Nos boundary pillars for demarcation and pillaring of mine acquired land for Jayant Project
2026_NCL_362544_1
JNT/CED/26-27/10 25.07.2026
Open Tender
Civil Works - Others
Percentage
60 days
Jayant Project
Please refer Tender documents
5 documents required · 5 mandatory
₹63,000
13 Aug 2026
25 Jul 2026
13 Aug 2026
25 Jul 2026
12 Aug 2026
27 Jul 2026
27 Jul 2026 - 6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | Item Description/ Heading | - | - | - | - |
| 1 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 22,500 | Sqm | 4.9 | ₹1,10,250 |
| 2 | Earth work in excavation in all kind of soil/ silt by mechanical means (hydraulic excavaror)/ manual means including dozering, trasnportation, unloading at designated place, levelling and dressing of dump sites all inclusive as per instructions of EIC. with all lifts (for all project of NCL) Lead up to 50 mtr. | 5,250 | CuM | 29.17 | ₹1,53,142.5 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 120 | CuM | 152.2 | ₹18,264 |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 30 | CuM | 1,634.25 | ₹49,027.5 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 318 | CuM | 6,510.25 | ₹20,70,259.5 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for all heights: Columns, Pillars, Piers, Abutments, Posts and Struts. | 1,224 | Sqm | 554.6 | ₹6,78,830.4 |
| 7 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand) | 1,225 | Sqm | 229.35 | ₹2,80,953.75 |
| 8 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work. | 1,225 | Sqm | 95.7 | ₹1,17,232.5 |
| 9 | Lettering with black Japan paint of approved brand and manufacture | 2,25,000 | per letter per cm height | 3.5 | ₹7,87,500 |
stage.html
html • 0.03 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.07 MB
Tendernotice_1.pdf
PDF • 1.70 MB
BOQ_375453.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .