| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.9 LAccepted-AOC FLAT NO 4 VIRGINIA CO OP HOUSING SOCIETY AIR PORT ROAD CHICALIM VASCO DA GAMA GOA 403 711 | SOUTH GOA | GOA | 403711 | ₹37.9 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹39.6 L+₹1.6 L (4.34%)Rejected-AOC | ₹39.6 L+₹1.6 L (4.34%) | L2 | Rejected-AOC Rejected |
| 3 | L3₹42.2 L+₹4.3 L (11.2%)Rejected-AOC FLAT NO B 205 S NO 296 2 DIVINE HOMES PORWAL ROAD LOHEGAON PUNE 411047 | PUNE | MAHARASHTRA | 411047 | ₹42.2 L+₹4.3 L (11.2%) | L3 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | M/S jvsr constructions L1 | BSK Construction L3 | CLASSIC ENGINEERS L2 |
|---|---|---|---|---|---|---|
| 1.00 | Civil Works
Earth work in excavation in ordinary rock by mechanical means (Hydraulic excavator) means over areas exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan including getting out and disposal of excavated material lead upto 50m and lift upto 1.5m all specified and as directed by Engineer-in-charge. | 400 | CUBIC METRE | 360 ₹1,44,000 | 300 ₹1,20,000 Lowest | 386.59 ₹1,54,636 |
| 2.00 | Surface excavation not exceeding 30 cm deep and averaging 15cm deep and getting out in soft/disintegrated rock all as specified and as directed. | 600 | SQUARE METRE | 45 ₹27,000 Lowest | 50 ₹30,000 | 150 ₹90,000 |
| 3.00 | Excavation in trenches not exceeding 1.5m wide & not exceeding 1.5m in depth and getting out in soft/ disintegrated rock as in foundation and like etc complete all as specified and as directed. | 30.1 | CUBIC METRE | 450 ₹13,545 | 400 ₹12,040 Lowest | 750 ₹22,575 |
| 4.00 | Material and labour for sand filling under floors to receive paver block or in foundations including watering and consolidation complete all as specified and as directed | 71.4 | CUBIC METRE | 2,700 ₹1,92,780 | 1,500 ₹1,07,100 Lowest | 1,650 ₹1,17,810 |
| 5.00 | Material and labour for plain cement concrete 1:4:8, type D2 using 40mm graded stone aggregate as in 100 mm thick sub base/ flooring etc complete all as specified and as directed. | 1,250 | SQUARE METRE | 360 ₹4,50,000 | 350 ₹4,37,500 Lowest | 425 ₹5,31,250 |
| 6.00 | Material and labour for machine pressed precast concrete interlocking paver block any shape and size confirming to IS 15658-2006 of 60mm thickness M-35 Grade with grey cement and pigment complete all as specified and as directed | 1,250 | SQUARE METRE | 810 ₹10,12,500 | 800 ₹10,00,000 | 735 ₹9,18,750 Lowest |
| 7.00 | Material and labour for providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required complete all as specified and as directed. | 7.5 | CUBIC METRE | 10,800 ₹81,000 | 8,000 ₹60,000 Lowest | 8,514 ₹63,855 |
| 8.00 | Material and labour for precast reinforced cement concrete 1:2:4, type B1 with using 20mm graded granite/ trap stone aggregate as in factory made cover slabs set in cement mortar 1:4 including form work etc complete all as specified and as directed.
Note: Reinforcement shall be measured and paid separately | 12.3 | CUBIC METRE | 9,000 ₹1,10,700 | 5,000 ₹61,500 Lowest | 5,500 ₹67,650 |
| 9.00 | Material and labour TMT Mild steel bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and as directed. | 1,650 | KILOGRAM | 99 ₹1,63,350 | 110 ₹1,81,500 | 82.6 ₹1,36,290 Lowest |
| 10.00 | Removing excavated material not exceeding 50m and depositing where directed at a level not exceeding 1.5m above the starting point complete all as specified and as directed. | 505.8 | CUBIC METRE | 180 ₹91,044 | 150 ₹75,870 Lowest | 250 ₹1,26,450 |
Tender Value
₹42.9 L
EMD Value
₹85,800
Closing Date
17 Apr 2026, 6:00 pmClosed
GE(I) CG Goa
Military Engineer Service, GE(I) CG Goa, HQ CG DHQ-11, Chicolna, PO Bogmalo, Goa-403 806
PROVISION OF WALKING PLAZA NEAR SHOPPING COMPLEX AT TRV CHICOLNA UNDER GE(I) CG GOA
2026_MES_758030_1
8636/GOA/E8
Open Tender
Civil Works
Item Rate
180 days
GE(I) CG Goa
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
Yes
GE(I) CG Goa
₹85,800
1 Jun 2026
27 Mar 2026
24 Apr 2026
27 Mar 2026
17 Apr 2026
10 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Works Earth work in excavation in ordinary rock by mechanical means (Hydraulic excavator) means over areas exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan including getting out and disposal of excavated material lead upto 50m and lift upto 1.5m all specified and as directed by Engineer-in-charge. | |||||
| 2Surface excavation not exceeding 30 cm deep and averaging 15cm deep and getting out in soft/disintegrated rock all as specified and as directed. | |||||
| 3Excavation in trenches not exceeding 1.5m wide & not exceeding 1.5m in depth and getting out in soft/ disintegrated rock as in foundation and like etc complete all as specified and as directed. | |||||
| 4Material and labour for sand filling under floors to receive paver block or in foundations including watering and consolidation complete all as specified and as directed | |||||
| 5Material and labour for plain cement concrete 1:4:8, type D2 using 40mm graded stone aggregate as in 100 mm thick sub base/ flooring etc complete all as specified and as directed. | |||||
| 6Material and labour for machine pressed precast concrete interlocking paver block any shape and size confirming to IS 15658-2006 of 60mm thickness M-35 Grade with grey cement and pigment complete all as specified and as directed | |||||
| 7Material and labour for providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required complete all as specified and as directed. | |||||
| 8Material and labour for precast reinforced cement concrete 1:2:4, type B1 with using 20mm graded granite/ trap stone aggregate as in factory made cover slabs set in cement mortar 1:4 including form work etc complete all as specified and as directed. Note: Reinforcement shall be measured and paid separately | |||||
| 9Material and labour TMT Mild steel bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and as directed. | |||||
| 10Removing excavated material not exceeding 50m and depositing where directed at a level not exceeding 1.5m above the starting point complete all as specified and as directed. | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
8636TENDERPAGES.pdf
Tender Documents • 0.85 MB
BOQ_849075.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .