Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹60,000Accepted-Finance NOT AVAILABLE | L1 | Accepted-Finance Lowest | |
| 2 | L2₹62,500+₹2,500 (4.17%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | L3₹63,500+₹3,500 (5.83%)Accepted-Finance BHAGWATI NAGAR JAMMU | L3 | Accepted-Finance L3 |
Tender Value
₹63,800
Closing Date
14 Jul 2022, 12:00 pmClosed
Executive Engineer MICD Jammu
O/O Executive Engineer MICD Jammu
Upkeepment of pumping machinery along with allied works at Upper Malpur-II
2022_IFC_178125_1
eNIT NO MICD/J/37 OF 2022-23 DATED 7/07/2022
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
10 days
jammu
Please refer Tender documents.
8 documents required · 8 mandatory
₹200
Executive Engineer MICD Jammu
Exempted
25 Jul 2022
7 Jul 2022
14 Jul 2022
7 Jul 2022
14 Jul 2022
7 Jul 2022
Amount
a) Servicing of 7 cusec x 21m head horizontal casing pump set , 2no.s done by way of, de-coupling from the motor and suction delivery lines. P/F of new gland packing, nut bolts, rubber sealings after cleaning the gland bushes and gland plate sets, applying sufficient amount of grease including gland packing to avoid excessive wear and tear, P/f of 2 no. new bearings for unit no.I by extracting the rusted bearings from the bearing housing. Complete assembling of pumps and its refitting back to its position at site for installation. Repairs/rewinding of 2 HP mono block unit by way of dismantling it from the suction and delivery lines. carriage to the workshop for repairs and rewinding by extraction of burnt/damaged windings, cleaning of stator slots and complete rewinding of the motor with new copper wire of requisite gauge/specifications and of standard make. Providing & fitting of new insulation & packing material and varnishing with superior quality varnish and drying in oven at controlled temperature. Back carriage to the site of installation and reassembling the rotor and stator at site, testing the motor on no load and full load conditions. Complete job includes cost of material , labour charges with hire charges of tools and tackles including transportation charges. b) Dismantling/servicing of 250 KVA Electric transformer at LIS Upper Malpur-II, by welding the transformer tank at leaked portions then toppin it with 70 lites of T-oil . P/f of link set in place of damaged link set. The job also includes P/f of new HT and LT bush rod assembly for all three phases including insulators, rubber seals and closing of top cover and making connection on HT and Lt sides. The job includes cost of material and labour charges at the site inclusive of rebate on old parts. The Rebate on old damaged parts/scrap should be quoted in the rebate column provided in BOQ
VERMA ELECTRICAL AND MECHANICAL WORKS
M/S FASTTRACK ENGINEERS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .