Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹3.9 L
EMD Value
₹7,876
Closing Date
19 Sept 2026, 5:00 pmClosed
Executive Officer
G.T. road Nagar Palika Parishad Fatehpur
Beautification work at Verma Tiraha.
2026_DOLBU_1185694_1
3749/2627/NPPF (2026-27) DATE-10.09.2026
Open Tender
Civil Works
Fixed-rate
30 days
Fatehpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
Executive Officer Nagar Palika Parishad
₹7,876
19 Sept 2026
14 Sept 2026
19 Sept 2026
14 Sept 2026
19 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (Loam clay, or sand ) including lift upto 1.5 m & lead up to 30.0 Mtr & including filling,watering and ramming ofexcavated earth in to the trenches or in to the space between the building and the sides of foundataion trenches or in to the plinth and removal & disposal of surplus earth as directed by the Engineer- In-Charge up to a distance of 30.0 Mtr from the foundation trenches .as per S.I no 251 | 10.75 | Cum | 160 | ₹1,720 |
| 2 | Cement concrete with 40mm gauge approved stone ballast, coarse sand and cement in proportions of 1:4:8 including supply of all materials, labour, tools & plant etc required for proper completion of the work. S.I. No-281 | 2.1 | Cum | 5,800 | ₹12,180 |
| 3 | R.C.C. work with cement approved coarse sand of 2.5 F.M. and 2cm (3/4'') Gauge approved stone grit in propottions of 1:2:4 on lintels of door and windows excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour, T&P etc required for proper completion of the work including cost of binding wire. (S.I. No-283) | 1.3 | Cum | 7,500 | ₹9,750 |
| 4 | Reinforced Cement Concrete work with cement,approved coarse sand of 2.5 F.M and 2 cm(3/4") gauge approved stone grit in proportion of 1:2:4 in lintel of door&windows excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I.binding wire and including necessary centering and shuttering etc.and supply of all materials, labour and T&P etc. required for proper completion of the work.including cost of Binding wire as per S.I no 283 For Main gate COLUMN | 3.85 | Cum | 8,100 | ₹31,185 |
| 5 | Reinforced Cement Concrete work with cement,approved coarse sand of 2.5 F.M and 2 cm(3/4") gauge approved stone grit in proportion of 1:2:4 in lintel of door&windows excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I.binding wire and including necessary centering and shuttering etc.and supply of all materials, labour and T&P etc. required for proper completion of the work.including cost of Binding wire as per S.I no 283 For Slab | 2.3 | Cum | 8,400 | ₹19,320 |
| 6 | Mild Steel or iron in plain work such as RCC or R.B. work wrought to required shape as necessary including bending for proper competition of work and including supply of all steel & wastage and over lapping and hooks. (S.I. No-504) | 7.3 | Qtl | 6,150 | ₹44,895 |
| 7 | First class/class-150 Brick work in 1:4 cement and fine sand of 1.25 F.M. modulous mortar in foundation and plinth including supply of all materials, labour & tools & plants etc. requied for proper completion of the work. | 1.9 | Cum | 5,410 | ₹10,279 |
| 8 | First class/class-150 Brick work in 1:4 cement and fine sand of 1.25 F.M. modulous mortar in foundation and plinth including supply of all materials, labour & tools & plants etc. requied for proper completion of the work. | 2.7 | Cum | 5,738 | ₹15,492.6 |
| 9 | 12 mm thick plaster with Cement course sand including supply of all materials-labour and Tools and Plants etc required for completion of the work. | 12.45 | Sqm | 131 | ₹1,630.95 |
| 10 | S/f of stainless steel grill of grade -304 including all labour material T&P | 170.8 | Kg | 619.4 | ₹1,05,793.52 |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_2231479.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .