| 1 | 1₹9.5 LAccepted-AOC | ₹9.5 L | 1 | Accepted-AOC Accept |
| 2 | 2₹9.7 LRejected-Finance A 51 SHALIMAR GARDEN EX 2 SAHIBABAD DISTRICT GHAZIABAD UTTAR PRADESH | SAHIBABAD | GHAZIABAD | UTTAR PRADESH | ₹9.7 L | 2 | Rejected-Finance 2 |
| 3 | 3₹9.8 LRejected-Finance | ₹9.8 L | 3 | Rejected-Finance 3 |
| 4 | 4₹9.9 LRejected-Finance | ₹9.9 L | 4 | Rejected-Finance 4 |
| 5 | 5₹10.0 LRejected-Finance | ₹10.0 L | 5 | Rejected-Finance 5 |
| Sl No | Description | Qty | Unit | M/s Virendra Singh Contractor L1 | ARTIST BRO L2 | M/S FAIR CONSTRUCTION L4 | Dhirendra Singh Sirohi L7 | M/S PRABHAT CONTRACTOR AND ENGINEERS L5 | M/S HARSH CONSTRUCTIONS L6 | M/S RINKU CONTRACTOR L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work for Excavation in Foundation in all type of soil including Dressing & back filling including all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 338 | Cum | 68 ₹22,984 | 60 ₹20,280 | 30 ₹10,140 | 40 ₹13,520 | 55 ₹18,590 | 71.8 ₹24,268.4 | 50 ₹16,900 |
| 2.00 | Cement Concrete 1:4:8 in Foundation with Cement, Course Sand, Crushed Stone Grit 22.5 to 45 mm with all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 39 | Cum | 3,900 ₹1,52,100 | 4,000 ₹1,56,000 | 3,850 ₹1,50,150 | 5,110 ₹1,99,290 | 3,900 ₹1,52,100 | 4,308 ₹1,68,012 | 5,000 ₹1,95,000 |
| 3.00 | Ist Class Brick Work M-100 in 1:4 C.M. with cement, Course Sand including all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 180 | Cum | 3,800 ₹6,84,000 | 4,000 ₹7,20,000 | 4,200 ₹7,56,000 | 5,250 ₹9,45,000 | 4,200 ₹7,56,000 | 4,092.6 ₹7,36,668 | 3,815 ₹6,86,700 |
| 4.00 | 12.5 mm Thick Cement Plaster in 1:4 C.M. in with all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 185 | Sqm | 130 ₹24,050 | 125 ₹23,125 | 90 ₹16,650 | 171 ₹31,635 | 145 ₹26,825 | 143.6 ₹26,566 | 100 ₹18,500 |
| 5.00 | C.C. 1:1.5:3 on R/Wall with cement, coarse sand,Crushed stone grit 10 to 25 mm including Cost of all Material Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. | 4 | Cum | 5,000 ₹20,000 | 5,500 ₹22,000 | 5,900 ₹23,600 | 6,752 ₹27,008 | 5,300 ₹21,200 | 5,313.2 ₹21,252.8 | 5,000 ₹20,000 |
| 6.00 | Earth Work in Back Filling including lead upto 200M & lift upto 1.5M including dressing, ramming by Manual Labour or Machine including all Cost of Material, Labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 425 | Cum | 107 ₹45,475 | 60 ₹25,500 | 80 ₹34,000 | 114 ₹48,450 | 50 ₹21,250 | 107.7 ₹45,772.5 | 100 ₹42,500 |
Tender Value
₹14 L
EMD Value
₹28,000
Closing Date
7 Jan 2026, 12:00 pmClosed
Executive Engineer
U.M.B.D.G.C.KHURJA
Construction of Retaining Wall
2025_UPIDC_1103145_8
13/EE/2025-26
Open Tender
Civil Works
60 days
U.M.B.D.G.C.KHURJA
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹28,000
21 Feb 2026
1 Jan 2026
7 Jan 2026
1 Jan 2026
7 Jan 2026
1 Jan 2026
Amount
Earth work for Excavation in Foundation in all type of soil including Dressing & back filling including all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
Cement Concrete 1:4:8 in Foundation with Cement, Course Sand, Crushed Stone Grit 22.5 to 45 mm with all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
Ist Class Brick Work M-100 in 1:4 C.M. with cement, Course Sand including all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
12.5 mm Thick Cement Plaster in 1:4 C.M. in with all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
C.C. 1:1.5:3 on R/Wall with cement, coarse sand,Crushed stone grit 10 to 25 mm including Cost of all Material Labour and T&P etc complete all as specified and as directed by Engineer-in-charge.
Earth Work in Back Filling including lead upto 200M & lift upto 1.5M including dressing, ramming by Manual Labour or Machine including all Cost of Material, Labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
ARTIST BRO (BID ID -5791305)
M/S RINKU CONTRACTOR (BID ID -5789818)
M/S FAIR CONSTRUCTION (BID ID -5791952)
M/S PRABHAT CONTRACTOR AND ENGINEERS (BID ID -5792119)
M/S HARSH CONSTRUCTIONS (BID ID -5792491)
Dhirendra Singh Sirohi (BID ID -5792490)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_2034312.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid