Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.1 LAccepted-AOC NO 162 KARUMARIAMMAN KOIL STREET ATHIPATTU PUDU NAGAR CHENNAI 600 120 | THIRUVALLUR | TAMIL NADU | 600120 | ₹14.1 L Quoted ₹13.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹13.9 LRejected-AOC | ₹13.9 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | C. PARTHIBAN CONTRACTOR L1 | THIRUMURUGAN ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Chipping of concrete and roughening the surface and removal of debris 2km away from the site rate including cost of all materials, labour charges, lead, T&P, lift, etc, complete and as directed by Engineer incharge of the work | 98 | m2 | 158 ₹15,484 | 165 ₹16,170 |
| 2.00 | Dismantling of tiles and removal of debris 2 km away from the site, including cost of all materials, labour charges, lead, T&P, lift etc., complete and as directed by Engineer incharge at site. | 105 | M2 | 87 ₹9,135 | 91 ₹9,555 |
| 3.00 | Dismantling Brick work and removal of debris 2 km away from the site, including cost of all materials, labour charges, lead, T&P, lift etc., complete and as directed by Engineer incharge at site. | 0.8 | m3 | 435 ₹348 | 455 ₹364 |
| 4.00 | Dismantling of floor PCC and removal of debris 2km away from the site, including cost of all materials, labour charges, lejad, T&P, lift etc, complete and as directed by Engineer incharge at site | 6.1 | m3 | 602 ₹3,672.20 | 630 ₹3,843 |
| 5.00 | Dismantling the 100 and 80mm dia existing MS sewer line and devoluting the same to department store including cost of all labour for cutting, removing, transporting charges, all lead, lift etc., complete and as directed by site Engineer incharge of the work. | 4,176 | kg | 27 ₹1.1 L | 29 ₹1.2 L |
| 6.00 | Dismantling the brick jelly lime concrete in sunken portion of toilet including transporting and disposed 2 km away from the site including cost of all materials, labour, lead, lift, etc., complete as directed by the Engineer incharge of the work. | 30.2 | M3 | 505 ₹15,251 | 529 ₹15,975.80 |
| 7.00Plain cement concrete 1:2:4 using 20mm HBG stone for flooring concrete including cost of all materials, Conplast X 421 Chemical, Nito bond chemical lead, lift, labour charges, etc., complete and as directed by Engineer incharge at site. | |||||
| 7.01 | 36m Level | 1.1 | M3 | 10,035 ₹11,038.50 | 10,513 ₹11,564.30 |
| 7.02 | 27m Level | 1.6 | M3 | 9,843 ₹15,748.80 | 10,311 ₹16,497.60 |
| 7.03 | 17m Level | 1.3 | M3 | 9,630 ₹12,519 | 10,088 ₹13,114.40 |
Tender Value
Refer Docs
EMD Value
₹15,800
Closing Date
23 Aug 2023, 2:00 pmClosed
SE CM NCTPS II
Office of SE CM NCTPS II Chennai - 120
NCTPS II Civil Maintenance Circle Civil Maintenance Division Repair and maintenance works to the toilets in all floors of Power house Unit I at 0m 8.5m 17m 27m and 36m levels in NCTPS II
2023_EB_356957_1
SE/CM/NCTPS-II/EE/CM/ 46/2023-24
Open Tender
Civil Works
120 days
NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹15,800
Yes
3 Mar 2026
9 Aug 2023
24 Aug 2023
9 Aug 2023
23 Aug 2023
9 Aug 2023
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid