| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹66.1 LAdmitted-Finance | -11.10% | ₹66.1 L | L1 | Admitted-Finance |
| 2 | L2₹72.1 LAdmitted-Finance | -3.00% | ₹72.1 L | L2 | Admitted-Finance |
| 3 | L3₹72.7 LAdmitted-Finance | -2.20% | ₹72.7 L | L3 | Admitted-Finance |
| 4 | L4₹78.9 LAdmitted-Finance | +6.10% | ₹78.9 L | L4 | Admitted-Finance |
Tender Value
₹74.4 L
EMD Value
₹1.5 L
Closing Date
1 Jun 2026, 3:00 pmClosed
Chief Engineer
Chief Engineer VOCPA
Construction of Canteen, Rest Room and Toilet Facilities at Marshalling Yard in VOCPA.
2026_VOCPT_277083_1
01CE/HMD/2025-26
Open Tender
Civil Works
Percentage
270 days
VOC Port
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.5 L
15 Jul 2026
11 May 2026
2 Jun 2026
11 May 2026
1 Jun 2026
11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation in trenches for foundation in sand and other loose soils not exceeding 1.50m in width and including dressing of sides and ramming of bottom lift upto 1.50m including getting out of the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m and lift of 1.50m, cost including shuttering, strutting, bailing out seepage of water wherever necessary etc., complete complying with AISS and as directed by the departmental officers. | 130 | CUM | 299.6 | ₹38,948 |
| 2 | Providing and laying Plain Cement Concrete 1:4:8 (One part of cement, 4 parts of Coarse sand & 8 Parts of 40 mm nominal size metal ) for foundation using 40 mm nominal size graded metal including mixing, laying, levelling, consolidation, finishing and curing etc., complete complying with AISS and as directed by the departmental officers. | 52 | CUM | 5,036.66 | ₹2,61,906.32 |
| 3 | Providing Form work including centring, shuttering, (shuttering Planks shall not less than 38 mm thick) so as to give a rough finish shuttering and propping etc., in all floors upto full height of the building and removal of the same for in situ RCC work such as beam, slabs, lintels, sunshade etc., complete complying with AISS and as directed by the departmental officers. | 736 | SQM | 624.75 | ₹4,59,816 |
| 4 | Providing and laying Reinforced Cement Concrete 1:1.5:3 (One part of cement, One and a half parts of Coarse sand & Three Parts of graded stone aggregate (i.e.) 2 parts of 20mm nominal size graded metal & 1 part of 10mm nominal size graded metal) using 20 mm nominal size graded metal including mixing, laying, levelling, consolidation, finishing and curing etc., and excluding the cost of form work and reinforcement grills for all RCC works in all floors upto full height of the building etc., complete complying with AISS and as directed by the departmental officers. | 105 | CUM | 7,541.47 | ₹7,91,854.35 |
| 5 | Fabricating and placing in position of M.S / Tor steel grills for R.C.C works in all floors including cost of Steel, cutting, bending, binding with 16 Gauge GI Binding wire and placing in position etc., complete complying with AISS and as directed by the departmental officers. | 16 | MT | 87,737.14 | ₹14,03,794.24 |
| 6 | Providing and laying Plain Cement Concrete 1:2:4 (One part of cement, 2 parts of Coarse M. Sand (Crushed Stone Sand) & 4 Parts of 40 mm nominal size metal ) for foundation using 40 mm nominal size graded metal including mixing, laying, levelling, consolidation, finishing and curing etc., complete complying with AISS and as directed by the departmental officers. | 10 | CUM | 6,698.66 | ₹66,986.6 |
| 7 | Filling basement with available excavated earth in trenches, plinth, sides of foundation etc., in layers not exceeding 20cm in depth, consolidating and watering etc., complete complying with AISS and as directed by the departmental officers. | 26 | CUM | 189.32 | ₹4,922.32 |
| 8 | Filling in basement with M. Sand (Crushed Stone Sand) to the required thickness in layers including watering, ramming, consolidating and dressing etc., complete complying with AISS and as directed by the departmental officers. | 116 | CUM | 2,291.22 | ₹2,65,781.52 |
| 9 | Filling the low lying area using dredging material / available approved material by cutting, loading, transporting by deploying required equipments like excavator, tipper, with all lifts and leads to site with an average lead of 1 Km., spreading in uniform thickness, watering, compacting by deploying required equipments like grader, roller etc., The rate inclusive of conveyance, tools & plants, hire charges for machinery, fuel charges, all labour etc., complete and as directed by the departmental officers. | 51 | CUM | 96 | ₹4,896 |
| 10 | Supplying and fixing in position of best Indian make heavy duty Gun Metal Wheel Valve at 32mm dia. of approved quality including all materials, labour etc., complete complying with AISS and as directed by the departmental officers. | 20 | NO | 661.3 | ₹13,226 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
technicalbid.pdf
Tender Documents • 1.57 MB
BOQ_323611.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].