| Sl No | Description | Qty | Unit | Sri Balaji Builders L1 | JEEVE CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00Strengthening of M.Panagudi to S.Panagudi Goburajapuram Road km 0/0-2/800 at Panagadi in Thirumarugal Block | |||||
| 2.00Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | |||||
| 3.00 | in Km 0/0-2/800 | 3,939.12 | Sq.Mtr | 6 ₹23,634.72 Lowest | 6 ₹23,634.72 Lowest |
| 4.00Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305. | |||||
| 5.00 | in Km 0/0-2/800 | 656.17 | cum | 140 ₹91,863.8 Lowest | 142 ₹93,176.14 |
| 6.00Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | |||||
| 7.00 | in Km 0/0-2/800 | 2,788.4 | Sq.Mtr | 23 ₹64,133.2 Lowest | 24 ₹66,921.6 |
| 8.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | - | - | - | - |
| 9.00 | in Km 0/0-1/0 | 299.13 | Cum | 3,946 ₹11,80,366.98 Lowest | 3,986 ₹11,92,332.18 |
| 10.00 | in Km 1/0-2/0 | 296.41 | Cum | 3,946 ₹11,69,633.86 Lowest | 3,986 ₹11,81,490.26 |
Tender Value
₹1.7 Cr
EMD Value
₹1.7 L
Closing Date
11 Sept 2025, 3:00 pmClosed
Project Director, DRDA, Nagapattinam
DRDA, Collectorate Campus, Nagapattinam
01. Strengthening of M.Panagudi to S.Panagudi Goburajapuram Road km 0/0-2/800 at Panagadi in Thirumarugal Block
2025_RDTN_594514_1
Nagapattinam Dt/MGSMT-Ph-III/4437/2025-06
Open Tender
Civil Works - Roads
Item Rate
180 days
DRDA office, Collectorate campus Nagapattinam
As per Tender Documents
8 documents required · 8 mandatory
₹0
₹1.7 L
DRDA Integrated Complex, Collectorate Campus, Naga
11 Oct 2025
19 Aug 2025
11 Sept 2025
19 Aug 2025
11 Sept 2025
19 Aug 2025
25 Aug 2025
Amount
Strengthening of M.Panagudi to S.Panagudi Goburajapuram Road km 0/0-2/800 at Panagadi in Thirumarugal Block
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over BT surface using 2.5Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
Providing and laying Bituminous Mecadam to 50 mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II)-Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Provision for Hectametre Stones Size 0.90m x 0.15m x 0.15m
Provision for Kilometre Stones Size 1.65m x 0.45m x 0.15m
Provision for Sign Board
Construction of Retaining Wall
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete. complete.
Provision for Weephole Pipes etc Complete
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
JEEVE CONSTRUCTION (BID ID -1445175)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .