Tender Value
₹10.2 L
EMD Value
₹13,000
Closing Date
15 Oct 2020, 6:00 pmClosed
Superintending Engineer O and MC II BTPS Anpara
Office of Superintending Engineer O and MC II BTPS Anpara
In situ condition repairing of the critical spares of Furnace Bottom Ash Disposal system in unit no 4 and 5 2x500 MW BTPS Anpara
2020_RVUNL_508806_1
T-30/BMD-I/BTPS/2020-21
Open Tender
Miscellaneous Works
Fixed-rate
365 days
Anpara Thermal Power Plant Anpara
As per PQC of the tender
3 documents required · 3 mandatory
₹590
Dy CAO CFA and BO BTPS Anpara
₹13,000
9 Nov 2020
7 Sept 2020
22 Oct 2020
7 Sept 2020
15 Oct 2020
7 Sept 2020
7 Sept 2020 - 14 Oct 2020
Amount
Servicing of furnace bottom ash hopper gate with roller assembly.
Servicing of spur gear of clinker grinder & its successful trial run.
Complete overhauling of clinker grinder.
Provide scaffolding inside the complete bottom ash hopper for different works in FBAD system.
Removal of clinker grinder with complete hydraulic motor assly. from its position for maintenance works and replacing the same on its position after completion of work.
Removal of SSC complete assy. from its position for maintenance. Works & replacing the same on its original position there after servicing of travelling wheels of the SSC body.
Fabrication and erection of steel structures to facilitate the various maintenance works of furnace bottom ash disposal system.
Fabrication and erection of chute and body of clinker grinder of FBAD System.
Fabrication and erection of furnace bottom ash hopper (inner & outer) Chute and refitting in same position.
Repairing of Drive and Driven shaft of clinker grinder.
Replacement of new/repaired furnace bottom ash hopper gate of FBAD System.
Repairing of old & used worn-out teeth and collar of clinker grinder teeth segment of clinker grinder of 2X500MW, BTPS, Anpara.
Dismantling, Servicing, Fabrication/Repairing of damaged parts, assembling of Hydraulically operated Bottom Ash Hopper Discharge gate of 2x500MW, BTPS, Anpara.
Reclamation/Repairing of various critical old and used ,worn out shafts i. e. Head End Shaft, Tail End Shaft and Snub/Idler shafts(with key and key way also) of Submerged Scrapper Conveyor of Furnace Bottom Ash Disposal System of 2x500MW, BTPS
(A)Head End Shaft
(B)Tail End Shaft
(C)Snub / Idler Shaft
Reclamation/Repairing of old, used and worn out chain drive sprockets of Submerged Scrapper Conveyor of Furnace Bottom Ash Disposal System of 2x500MW, BTPS, Anpara.
A.K. ENTERPRISES
M/S SHALIMAR DECORATOR
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .