Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-Finance C 5 2ND FLOOR R K TOWER PLOT NO 21 22 SECTOR 04 VAISHALI GHAZIABAD 201012 MOB 8377811395 | ₹2.0 Cr | L1 | Accepted-Finance 1st lowest |
| 2 | L2₹3.9 Cr+₹2.0 Cr (98.9%)Rejected-Finance | ₹3.9 Cr+₹2.0 Cr (98.9%) | L2 | Rejected-Finance 2nd lowest |
| Sl No | Description | Qty | Unit | Chaitanya Projects Consultancy Private Limited L1 | Technogem Consultants Private Limited L2 |
|---|---|---|---|---|---|
| 1.00I. REMUNERATION FOR LOCAL PROFESSIONAL STAFF A.Key Personnel | |||||
| 1.10 | Team leader cum Senior Bridge Construction Engineer
29 Man-month in Construction period
1 Man-month in Maintenance period | 30 | Man-month | 1,00,000 ₹30,00,000 Lowest | 3,00,000 ₹90,00,000 |
| 1.11 | Sr. Bridge Design Engineer
5 Man-month in Construction period
0 Man-month in Maintenance period | 5 | Man-month | 30,000 ₹1,50,000 Lowest | 50,000 ₹2,50,000 |
| 1.12 | Resident Bridge Engineer
29 Man-month in Construction period
1 Man-month in Maintenance period | 30 | Man-month | 1,00,000 ₹30,00,000 Lowest | 2,00,000 ₹60,00,000 |
| 1.13 | Sr. Quality-cum-Material Engineer
8 Man-month in Construction period
0 Man-month in Maintenance period | 8 | Man-month | 60,000 ₹4,80,000 Lowest | 1,62,500 ₹13,00,000 |
| 1.14 | Senior Geotechnical Engineer
7 Man-month in Construction period
0 Man-month in Maintenance period | 7 | Man-month | 50,000 ₹3,50,000 Lowest | 1,55,250 ₹10,86,750 |
| 1.15 | Sr. Contract Specialist
5 Man-month in Construction period
1 Man-month in Maintenance period | 6 | Man-month | 40,000 ₹2,40,000 Lowest | 50,000 ₹3,00,000 |
| 2.00B.Sub- Professional staff | |||||
| 2.10 | Assistant Resident Engineer (Bridges)
29 Man-month in Construction period
12 Man-month in Maintenance period | 41 | Man-month | 45,000 ₹18,45,000 Lowest | 62,500 ₹25,62,500 |
| 2.11 | Assistant Resident Engineer (Qualtiy)
29 Man-month in Construction period
0 Man-month in Maintenance period | 29 | Man-month | 35,000 ₹10,15,000 Lowest | 93,750 ₹27,18,750 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
6 Feb 2025, 5:00 pmClosed
Chief Engineer, Bridges, Odisha
Nirman Soudha, O/o EIC (Civil), Odisha, Bhubaneswar
Construction of Second H. L. Bridge over river MAHANADI connecting Baunsuni of Boudh District Biramaharajpur in Sonepur District under NABARD Assistance RIDF-XXX
2025_EICCL_109483_1
CE-BRIDGES-15/2024-25
National Competitive Bid
Civil Works - Others
Item Rate
1230 days
In the District of Boudh
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹50,000
Yes
Nirman Soudha, O/o EIC (Civil), Odisha, Bhubaneswa
21 Dec 2025
17 Jan 2025
7 Feb 2025
17 Jan 2025
6 Feb 2025
22 Jan 2025
17 Jan 2025 - 1 Feb 2025
22 Jan 2025
Amount
I. REMUNERATION FOR LOCAL PROFESSIONAL STAFF A.Key Personnel
Team leader cum Senior Bridge Construction Engineer 29 Man-month in Construction period 1 Man-month in Maintenance period
Sr. Bridge Design Engineer 5 Man-month in Construction period 0 Man-month in Maintenance period
Resident Bridge Engineer 29 Man-month in Construction period 1 Man-month in Maintenance period
Sr. Quality-cum-Material Engineer 8 Man-month in Construction period 0 Man-month in Maintenance period
Senior Geotechnical Engineer 7 Man-month in Construction period 0 Man-month in Maintenance period
Sr. Contract Specialist 5 Man-month in Construction period 1 Man-month in Maintenance period
B.Sub- Professional staff
Assistant Resident Engineer (Bridges) 29 Man-month in Construction period 12 Man-month in Maintenance period
Assistant Resident Engineer (Qualtiy) 29 Man-month in Construction period 0 Man-month in Maintenance period
Asst. Highway Engineer 10 Man-month in Construction period 0 Man-month in Maintenance period
Quantity Surveyor 29 Man-month in Construction period 3 Man-month in Maintenance period
Survey Engineer 10 Man-month in Construction period 0 Man-month in Maintenance period
CADD Engineer 29 Man-month in Construction period 3 Man-month in Maintenance period
Lab Technician 29 Man-month in Construction period 0 Man-month in Maintenance period
II. Support Staff
Office Manager-cum-Accountant
Computer Operator
Guard
Office Boy
III. Transportation (Fixed rate on rental basis)
Innova /Scorpio or equivalent (not more than 2 years old) During Construction period (30) During Maintenance period (5)
Bolero (A/C) or equivalent (not more than 2 years old) During Construction period (30) During Maintenance period (5)
IV. Office Rent (Fixed Costs)– Minimum 200 sqm carpet area of office shall be rented
The rent cost includes electricity and water charges, maintenance, Cleaning, repairs, etc. complete
Main Office (1 No) During Construction period (23 month)
Main Office (1 No) During Maintenance period (12 month)
V. Office Supplies, Utilities and Communication (Fixed Costs)
Office Supplies - During Construction
Office Supplies - During Maintenance
Drafting Supplies - During Construction
Drafting Supplies - During Maintenance
Computer Running Cost - During Construction
Computer Running Cost - During Maintennace
Communications - During Construction
Communications - During Maintenance
VI.Office Furniture and Equipment (Rental/ Hire)
Executive Table
Executive Chairs
Table (size not less than 4' x 2')
Ordinary Chairs
Steel Shelving Cabinet
Facsimile (MFP)
Computer PC
Ink Jet Printers
VII. Reports and Document Printing
Monthly Reports (Design and Construction)
Quarterly cum third monthly Reports
Quarterly Reports (During maintenance period)
Technogem Consultants Private Limited (BID ID -2797112)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .