Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H4₹84.5 L−₹29.2 L (25.7%)Accepted-AOC | H4 | Accepted-AOC Accepted | |
| 2 | H1₹1.1 CrRejected-AOC | H1 | Rejected-AOC Rejected | |
| 3 | H2₹97.3 L−₹16.5 L (14.5%)Rejected-AOC | H2 | Rejected-AOC Rejected | |
| 4 | H3₹95.7 L−₹18.0 L (15.8%)Rejected-AOC | H3 | Rejected-AOC Rejected |
Tender Value
₹98.6 L
EMD Value
₹2 L
Closing Date
5 Mar 2019, 11:00 amClosed
Executive Engineer
Electricity Distribution Division Sambhal
Replacing LT Over Head bare conductor by LT AB Cable and shifting the consumer meters outside the consumer premises on turnkey basis
2019_PVVNL_325048_1
12/2018-19/EDD SAMBHAL
Open Tender
Electrical Works
Lump-sum
60 days
11 KV Feeder Aley Shah Aarea
Refer Tender Document
2 documents required · 2 mandatory
₹5,900
Executive Engineer
₹2 L
6 Mar 2019
27 Feb 2019
5 Mar 2019
27 Feb 2019
5 Mar 2019
27 Feb 2019
27 Feb 2019 - 27 Feb 2019
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .