| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹44.0 LAccepted-AOC | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹45.0 L+₹71,405 (1.61%)Rejected-Finance MCF 890 F BLOCK MCF 890 SANJAY COLONY SANJAY COLONY SECTOR 23 VILLAGE TOWN FARIDABAD CITY FARIDABAD FARIDABAD HARYANA 121005 INDIA | FARIDABAD | HARYANA | 121005 | L-2 | Rejected-Finance L-2 | |
| 3 | L-3₹48.0 L+₹3.8 L (8.53%)Rejected-Finance B 26 9 3RD FLOOR DELHI OKHLA VIHAR DELHI VILLAGE TOWN JAMIA NAGAR CITY DELHI SOUTH DELHI 110025 INDIA | SOUTH EAST DELHI | DELHI | 110025 | L-3 | Rejected-Finance L-3 | |
| 4 | Rejected-Technical | - | Rejected-Technical PQC not fulfilled |
Tender Value
₹45.5 L
EMD Value
₹91,086
Closing Date
24 Nov 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE OMC-II DTPS Kasimpur Aligarh
Office of the SE OMC-II DTPS Kasimpur Aligarh
Routine preventive and breakdown maintenance of Bowl Mills
2020_RVUNL_522911_1
ET-30/OMC-II/BMD-II/DTPS/20-21
Open Tender
Miscellaneous Works
Fixed-rate
365 days
HTPS KASIMPUR
As per Tender Documents
4 documents required · 4 mandatory
₹5,375
SAO EPAD HTPS KASIMPUR ALIGARH
₹91,086
12 Feb 2021
21 Oct 2020
26 Nov 2020
21 Oct 2020
24 Nov 2020
21 Oct 2020
21 Oct 2020 - 24 Nov 2020
120 days
Amount
Round the clock routine and preventive maintenance of Bowl mills & feeder system of Unit No:-8 and 9 (3shift x 365 days =1095 shifts for each unit for both units total job will be 2190 shifts.{Round the clock job( 1095 shift for each unit)}
Round the clock operation PLC (Auto) room / Manually from mill site and compressor for coal mill reject system and routine /preventive/ break-down maintenance of pneumatic coal mill reject handling system & compressor with air receiver tank and air pipe lines etc. along-with the house-keeping of reject system and nearby area ( like Reject hoppers, Gear Box, Mill motor coupling etc.) of Unit No:- 8 & 9, HTPS, Kasimpur, Aligarh.( Round the clock Job)
Breakdown Maintenance works of Bowl mills (XRP- 903) of Unit no-8 or 9-2X250 MW, HTPS, Kasimpur, Aligarh.
Replacement of Roller Journal assembly(One RJ assembly makes one job) ( Completion time: 08 Hrs.)
Changing trunnion position of RJ assembly. (One trunnion of one mill makes one Job)( Completion time: 04 Hrs.)
Replacement of worn out grinding roll with new/healthy one, including servicing of RJ assembly.( Completion time: 24Hrs.)
Overhauling of pressure spring assembly (One spring assembly of any mill shall be considered as one quantity.)( Completion time: 08 Hrs.)
Servicing/ repairing of spring support cover by machining/ tapping etc.( Completion time: 08 Hrs.)
Replacement / Servicing of journal stop bolt.( Completion time: 04 Hrs.)
Attending dust leakage from Journal opening cover.( Completion time: 04 Hrs.)
Replacement of bull ring segment assembly when replacement of RJ assembly has been given as separate job ( Separate job for removing and fixing of all three RJ assembly shall be given).( Completion time: 16 Hrs.)
Replacement of bull ring segment assembly while at least one RJ assembly is inside the bowl mill.( Completion time: 24 Hrs.)
Refitting of dislocated clamping ring/bull ring segment when replacement of RJ assembly has been given as separate job( Separate job for removing and fixing of all three RJ assembly shall be given).( Completion time:16 Hrs.)
Refitting of dislocated clamping ring/bull ring segment while at-least one RJ assembly is inside the bowl mill.( Completion time: 24 Hrs.)
Replacement of airport ring assembly, when replacement of RJ assembly has been given as separate Job. Complete one set (one set consist of 06 pieces).( Completion time: 48 Hrs.)
Repairing of airport ring assembly in installed condition when replacement of RJ assembly has been given as separate job (Separate Job for removing and fixing of all three RJ assembly shall be given).( Completion time: 12 Hrs.)
Repairing of airport ring assembly in installed condition while at-least one RJ assembly is inside the bowl mill.( Completion time: 12 Hrs.)
Repairing/Replacement of bowl extension ring segment, when replacement of RJ assembly has been given as a separate Job.( Completion time: 12 Hrs.)
Repairing/Replacement of venturi, while replacement of MPO & MDV are awarded as separate Job.( Completion time: 12 Hrs.)
Repairing/Replacement of venturi, while MPO & MDV are in their installed condition.( Completion time: 24 Hrs.)
Repairing of venturi outlet in installed condition.( Completion time: 08 Hrs.)
Replacement of MPO.( Completion time: 48 Hrs.)
Replacement of MDV.( Completion time: 24 Hrs.)
Replacement of (leaking) Victaulic coupling rubber gasket of MPO/ MDV/ transition piece.( Completion time: 04 Hrs.)
Replacement of classifier inner cone, when replacements of RJ assemblies have been given as separate Jobs.( Completion time: 48 Hrs.)
Fabrication and fixing of air duct vanes.( Completion time: 08 Hrs.)
Repairing of 'O' collar assembly.( Completion time: 06 Hrs.)
Repairing eroded portion of classifier inner cone.( Completion time: 04 Hrs.)
Replacement/refitting/Servicing of classifier blade.( Completion time: 04 Hrs.)
Adjustment of classifier blade operating linkage mechanism.( Completion time: 08 Hrs.)
Replacement /Repairing of scrapper guard assembly.( Completion time: 04 Hrs.)
Replacement of mill side liner, when replacement of RJ assembly has been given as a separate Job.( Completion time: 24 Hrs.)
Repairing of Mill side liners by patching/welding (MS plate of thickness-10/12 mm for patching may be arranged from scrap).( Completion time: 04 Hrs.)
Repairing/Replacement of mill side bottom liner.( Completion time: 04 Hrs.)
Replacement of bottom insulation cover plate (complete set).( Completion time: 24 Hrs.)
Repairing of bottom insulation cover plate.( Completion time: 12 Hrs.)
Checking and inspection / Replacement of Labyrinth seal inside the mill liner body of mill.( Completion time: 12 Hrs.)
Checking and inspection / Replacement of Labyrinth seal outside the mill liner body of mill.( Completion time: 12 Hrs.)
Refitting/replacement of dislocated lower/upper skirt assembly.( Completion time: 24 Hrs.)
Decoupling, performing alignment of mill-motor complete coupling and final coupling.( Completion time: 12 Hrs.)
Replacement of damaged geared coupling of input shaft and distance piece with new-one (Healthy-one) and perform alignment.( Completion time: 24 Hrs.)
Repairing of separator body, when replacement of RJ assemblies have been given as separate Jobs.( Completion time: 24 Hrs.)
Replacement of bowl hub cover, when replacement of RJ assemblies has been given as separate Job.( Completion time: 08 Hrs.)
Making threaded hole of any diameter on any surface of bowl mill by drilling and tapping.( Completion time: 12 Hrs.)
Servicing of oil coolers of mills in installed condition (one cooler of one mill make one Job).( Completion time: 24 Hrs.)
Replacement/Refitting of braided hose of lube oil pipe line.( Completion time: 04 Hrs.)
Servicing of seal air valve on seal air header of mills.( Completion time: 06 Hrs.)
Hard facing of bowl mill spares by 2" chequering pattern using sequence welding technique in installed condition.( Completion time: 08 Hrs.)
Complete dense hard facing of cap of airport ring assembly & Bowl extension ring with hard facing electrode.( Completion time: 20 Hrs.)
Fabrication and Replacement of RCF Hopper chute to center pipe of mill.( Completion time: 24 Hrs.)
Fabrication & Fitting of Guard/covering/shroud of RJ assembly housing by 8/10/ 12mm thick MS/Sailma plate.( Completion time: 12 Hrs.)
Complete Overhauling of RJ assembly.( Completion time:16 Hrs.)
Servicing of Hot air gate.( Completion time: 10Hrs.)
Servicing of Hot air damper.( Completion time: 10 Hrs.)
Servicing of Cold air gate.( Completion time: 08 Hrs.)
Servicing of Cold air damper.( Completion time: 08 Hrs.)
Attending coal/coal dust leakage from centre feed pipe/coal pipe {one patch (min size-200X200mm) make one Job)}.( Completion time: 04 Hrs.)
Servicing of lube oil system of mills (one mill make one Job).( Completion time: 16 Hrs.)
Servicing of oil coolers of mill lub. oil system by taking out the cooler from the lube oil system. (One cooler of one mill make one Job).( Completion time: 48 Hrs.)
Servicing of lube oil pump of Bowl mills.( Completion time: 08 Hrs.)
Replacement of lube oil pump of bowl mill with new /overhauled/serviced pump.( Completion time: 04 Hrs.)
Metalizing & hard facing of clamping rings of bull ring segment (All 4 rings make one job). Metalizing welding electrode is in firm scope. Hard facing to be done with L&T 670/700 welding electrode which shall be provided by Nigam.( Completion time: 24 Hrs.)
Repairing / Welding work in Cold air Duct/ Hot air duct.( Completion time: 06 Hrs.)
Changing worn out coal pipe (full length or piece) / bend with new one (One pipe/bend make one Job).( Completion time: 24 Hrs.)
Changing of worn out /damaged centre feed pipe of milling system.( Completion time: 24 Hrs.)
Cleaning, Greasing, Servicing of electrically operated hoist (One job of one unit for fifteen days).( Completion time: 16 Hrs.)
Servicing of all electrically operated hoist of mill site.(one unit make one job of 7+ 1 under hung crane + hoist ).( Completion time: 40 Hrs.)
Taking out one no. complete RJ assembly from any bowl mill while taking-out journal opening cover.( Completion time: 08 Hrs.)
Fixing of one no RJ assembly in any bowl mill when Journal opening cover is already opened.( Completion time: 08 Hrs.)
Checking and inspection/Replacement of (If found damaged) bearings with new one of input shaft of planetary Gearbox of Bowl Mill.( Completion time: 48 Hrs.)
Replacement of broken bolt of mill body to separator top and bottom liner.( Completion time: 24 Hrs.)
Shifting of healthy RJ assembly from mill floor (3.5 mtr.) of unit no:- 8 to unit no:- 9 mill floor ( 3.5 mtr.) and vice versa.( Completion time: 04 Hrs.)
Repairing and reconditioning of eroded portion of bowl (erosion due to worn-out of bull ring segment) in installed condition by metalizing, hard facing of bowl surface with bull ring segments erosion size up-to or less than 4" X4" of 1 Segment.( Completion time: 48 Hrs.)
Repairing and reconditioning of eroded portion of bowl (erosion due to worn-out of bull ring segment) in installed condition by metalizing, hard facing of bowl surface with bull ring segments erosion size more than 4" x 4" of 1 Segment erosion size more than 4" x 4" and up-to 6" x 5" of 1 Segment.( Completion time: 72 Hrs.)
Repairing and reconditioning of eroded portion of bowl (erosion due to worn-out of bull ring segment) in installed condition by metalizing, hard facing of bowl surface with bull ring segments erosion size more than 4" x 4" of 1 Segment erosion size more than 6" x 5" of 1 Segment.( Completion time: 96 Hrs.)
Breakdown & Maintenance / Overhauling work of Gravimetric Coal Feeders
Replacement of COC Gear Box with new/serviced gear box.( Completion time: 08 Hrs.)
Servicing / Rectification of defects of clean out conveyor of GCF.( Completion time: 08 Hrs.)
Servicing/repairing of span/ weigh span roller.( Completion time: 12 Hrs.)
Repairing of end door.( Completion time: 10 Hrs.)
Servicing/repairing of air operated feeder outlet gate.( Completion time: 10 Hrs.)
Servicing /repairing of manual Feeder inlet gate/bunker outlet gate.( Completion time: 06 Hrs.)
Servicing of seal air valve of GCF.( Completion time: 24 Hrs.)
Servicing of defective COC Drive (Quadruple Helix-worm unit).( Completion time: 06 Hrs.)
Replacement /Repairing of belt scrapper.( Completion time: 50 Hrs.)
Attending dust leakage from GCF body by welding/patching etc.( Completion time: 12 Hrs.)
Servicing/Overhauling of Gravimetric Coal Feeder Main gear box.( Completion time: 12 Hrs.)
Replacement / Servicing of Gravimetric Coal Feeder Head Pulley/power pulley/take-up pulley.( Completion time: 08 Hrs.)
Servicing of Gravimetric Coal Feeder.( Completion time: 08 Hrs.)
Servicing of clutch assembly.( Completion time: 12 Hrs.)
Replacement of damaged feeder belt with new one of Gravimetric Coal Feeder.( Completion time: 14 Hrs.)
Replacement of Main Gear Box of GC Feeder with new/serviced gear box.( Completion time: 08 Hrs.)
Replacement of clutch assembly of GC Feeder with new/serviced.( Completion time: 08 Hrs.)
Repairing/Replacement of grating of various sizes.( Completion time: 04 Hrs./m²)
RM TRIPATHI PRIVATE LIMITED
F A CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .