Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.1 CrAdmitted-Finance 8TH FLOOR VASUNDHARA BUILDING 2 7 SARAT BOSE ROAD KOLKATA 700020 WEST BENGAL | KOLKATA | KOLKATA | WEST BENGAL | 700020 | ₹38.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹40.3 CrAdmitted-Finance A 204 NYAYKHAND 1 INDIRAPURAM GHAZIABAD GHAZIABAD UTTAR PRADESH 201014 UDYAM UP 29 0001910 09ACHFS4793D1ZR R M | GHAZIABAD | UTTAR PRADESH | 201014 | ₹40.3 Cr | L2 | Admitted-Finance |
| 3 | L3₹42.0 CrAdmitted-Finance | ₹42.0 Cr | L3 | Admitted-Finance |
| 4 | L4₹43.2 CrAdmitted-Finance | ₹43.2 Cr | L4 | Admitted-Finance |
| 5 | L5₹64.7 CrAdmitted-Finance NO 68 D BLOCK 2ND FLOOR S 1 FRONTIER HOMES ALIPH MAJITH NAGAR KELAMBAKKAM CHENGALPATTU DIST CHENNAI 603 103 | CHENGALPATTU | TAMIL NADU | 603103 | ₹64.7 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Phoenix Solutions L3 | Renga Engineering Works (India) Pvt Ltd L5 | Star O and M Group L2 | M/s Veenus Engineering L4 | LCPL ENERGY SOLUTIONS PRIVATE LIMITED L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Section- A ( CHP 2x210 MW +2x250MW) Round the clock Mechanical routine maintenance and upkeeping of Wagon Tipller 3&4,SAC 1A&1B, Vibrofeeders 1A,1B,1C, &2A,2B,2C,Vibrofeeders 3A,3B,3C,3D, Truflo Feeders (Screen) 1A,1B,1C,1D, Crusher 1A,1B,1C,1D,NERH 1&2 including vibrofeeders (4A,B,C&D), Stacker/Reclaimer, Conveyor NC1A,1B, 2A,2B,RBC 1A,1B, RC 1A,1B, RYC-1,3A,3B,5A,5B, 6A,6B, 7A,7B & 8A,8B ( 2X250MW), (Conveyor Belts repairing through patches, Feeding trippers, Rollers, Stinzers, Chutes, Gear Boxes, Geared Couplings, Scoop couplings, Fluid Couplings, DE & DS system etc.). | 2,190 | Job | 28,775 ₹6.3 Cr | 44,440 ₹9.7 Cr | 27,500 ₹6.0 Cr | 29,571.85 ₹6.5 Cr | 26,218.5 ₹5.7 Cr |
| 2.00 | Preventive maintenance (Mechanical) of Wagon Tipller 3&4,SAC 1A&1B, Vibrofeeders 1A,1B,1C, &2A,2B,2C,Vibrofeeders 3A,3B,3C,3D, Truflo Feeders (Screen) 1A,1B,1C,1D, Crusher 1A,1B,1C,1D,NERH 1&2 including vibrofeeders (4A,B,C&D) ,Stacker/Reclaimer, Conveyor NC1A,1B, 2A,2B,RBC 1A,1B, RC 1A,1B, RYC-1,3A,3B,5A,5B,6A,6B,7A,7B & 8A,8B ( 2X250MW) (Conveyor Belts Conveyor Belts repairing through patches, Feeding trippers, Rollers, Stinzers, Chutes, Gear Boxes, Geared Couplings, Scoop couplings, Fluid Couplings etc.) systems. | 730 | Job | 11,685 ₹85.3 L | 18,045 ₹1.3 Cr | 11,152 ₹81.4 L | 12,000 ₹87.6 L | 10,646.3 ₹77.7 L |
| 3.00Mechanical Break down maintenance : | ||||||||
| 4.00 | Replacement of different size conveyor pulleys. | 60 | Job | 907 ₹54,420 | 2,000 ₹1.2 L | 865.5 ₹51,930 | 930 ₹55,800 | 826.28 ₹49,576.80 |
| 5.00 | Replacement of conveyor's pulleys bearing. | 200 | Job | 910 ₹1.8 L | 2,000 ₹4 L | 865.5 ₹1.7 L | 930 ₹1.9 L | 826.28 ₹1.7 L |
| 6.00 | Replacement of different size gear coupling, flange coupling & fixed speed fluid coupling. | 40 | Job | 1,134 ₹45,360 | 2,000 ₹80,000 | 1,081.9 ₹43,276 | 1,165 ₹46,600 | 1,032.85 ₹41,314 |
| 7.00 | Fabrication & fitting of rubber scrapper on return side of conveyor at coal discharge hopper, take up pulleys & tail end pulley. | 50 | Job | 600 ₹30,000 | 1,000 ₹50,000 | 541 ₹27,050 | 610 ₹30,500 | 516.43 ₹25,821.50 |
| 8.00 | Replacement of repaired/new scoop controlled fluid coupling, gear box of conveyor system/Wagon tippler & Stacker re-claimer. | 20 | Job | 2,040 ₹40,800 | 3,200 ₹64,000 | 1,947.4 ₹38,948 | 2,096 ₹41,920 | 1,859.13 ₹37,182.60 |
| 9.00 | Repairing of various punctured hose pipes of hydraulic systems installed in 2x210MW units. | 20 | Job | 567 ₹11,340 | 1,000 ₹20,000 | 541 ₹10,820 | 585 ₹11,700 | 516.43 ₹10,328.60 |
| 10.00 | Shifting of heavy equipment. | 50 | Job | 1,130 ₹56,500 | 1,750.68 ₹87,534 | 1,082 ₹54,100 | 1,165 ₹58,250 | 1,032.85 ₹51,642.50 |
Tender Value
₹32.4 Cr
EMD Value
₹32 L
Closing Date
15 Mar 2025, 5:00 pmClosed
SE OMC- V PTPP Parichha
Office of Superintending Engineer Operation and Maintenance Circle-V, C-TPS Parichha Thermal Power Station Parichha, Jhansi, U.P
Round the clock work of complete operation and maintenance of Coal Handling Plant of PTPP, Parichha for coal unloading and feeding to 2x210 MW and 2x250 MW Units
2025_RVUNL_1005864_1
N-PAR/C/OMC5/CHD4/6000006591
Open Tender
Miscellaneous Works
730 days
PTPP Parichha
TC, EMD, PQC
2 documents required · 2 mandatory
₹29,500
Dy. CAO, CFA and BO, PTPP, Parichha
₹32 L
Office of SE OMC-V, PTPP Parichha
29 Jul 2025
17 Feb 2025
17 Mar 2025
17 Feb 2025
15 Mar 2025
17 Feb 2025
17 Feb 2025 - 15 Mar 2025
24 Feb 2025
Amount
Section- A ( CHP 2x210 MW +2x250MW) Round the clock Mechanical routine maintenance and upkeeping of Wagon Tipller 3&4,SAC 1A&1B, Vibrofeeders 1A,1B,1C, &2A,2B,2C,Vibrofeeders 3A,3B,3C,3D, Truflo Feeders (Screen) 1A,1B,1C,1D, Crusher 1A,1B,1C,1D,NERH 1&2 including vibrofeeders (4A,B,C&D), Stacker/Reclaimer, Conveyor NC1A,1B, 2A,2B,RBC 1A,1B, RC 1A,1B, RYC-1,3A,3B,5A,5B, 6A,6B, 7A,7B & 8A,8B ( 2X250MW), (Conveyor Belts repairing through patches, Feeding trippers, Rollers, Stinzers, Chutes, Gear Boxes, Geared Couplings, Scoop couplings, Fluid Couplings, DE & DS system etc.).
Preventive maintenance (Mechanical) of Wagon Tipller 3&4,SAC 1A&1B, Vibrofeeders 1A,1B,1C, &2A,2B,2C,Vibrofeeders 3A,3B,3C,3D, Truflo Feeders (Screen) 1A,1B,1C,1D, Crusher 1A,1B,1C,1D,NERH 1&2 including vibrofeeders (4A,B,C&D) ,Stacker/Reclaimer, Conveyor NC1A,1B, 2A,2B,RBC 1A,1B, RC 1A,1B, RYC-1,3A,3B,5A,5B,6A,6B,7A,7B & 8A,8B ( 2X250MW) (Conveyor Belts Conveyor Belts repairing through patches, Feeding trippers, Rollers, Stinzers, Chutes, Gear Boxes, Geared Couplings, Scoop couplings, Fluid Couplings etc.) systems.
Mechanical Break down maintenance :
Replacement of different size conveyor pulleys.
Replacement of conveyor's pulleys bearing.
Replacement of different size gear coupling, flange coupling & fixed speed fluid coupling.
Fabrication & fitting of rubber scrapper on return side of conveyor at coal discharge hopper, take up pulleys & tail end pulley.
Replacement of repaired/new scoop controlled fluid coupling, gear box of conveyor system/Wagon tippler & Stacker re-claimer.
Repairing of various punctured hose pipes of hydraulic systems installed in 2x210MW units.
Shifting of heavy equipment.
Removal of old & worn hammers.
Fitting of new hammers.
Fitting of old and used balanced set of hammer by reversal of direction of complete hammer set.
Taking out of damaged rotor assembly.
Replacement of rear side gratings/upper kicks of plates/lower kick of plate.
Replacement of front side grating.
Fitting of repaired/new rotor assembly.
Removal of new/usable rotor bearing.
Fitting of new/usable rotor bearing.
Removal of coupling of crusher rotor.
Removal of coupling of motor rotor.
Fitting of coupling of crusher rotor.
Fitting of coupling of motor rotor.
Static balancing of crusher rotor.
Alignment of crusher with motor rotor.
Repairing of crusher hood/body etc.
Replacement of vibrating assembly.
Assembling (internals & shieve pulley), de-assembling and installation of the truflo feeders.
Servicing of fluid couplings (fixed speed and scope controlled), gear boxes and linear actuators of flap gates it includes de-assembling, assembling and installation of the same.
Conveyor laying and jointing by adopting cold vulcanizing process it includes removal of old damaged belt, shifting of belt de-tensioning and tensioning and other required associated works etc.
Conveyor laying.
Number of joints.
Expertise services for hydraulic systems of wagon tipplers 3&4, side arm charger 1&2 and of stacker/reclaimer.
Complete cleaning, housekeeping, removal of choking in CHP systems, shifting of accumulated/spilled coal from various transfer towers and stones under overhead conveyor structures.
Shift cleaning & choking.
General cleaning.
Operation & Electrical Maintenance of CHP 2x210 MW & 2X250 MW.
Round the clock complete operation of CHP through PLC system system of 2x210 MW CHP PTPP Parichha for coal feeding into unit#3,4,5&6.
Round the clock routine electrical maintenance and upkeeping, wiping & cleaning of ER-1, ER-2, ER-3 S/G Rooms, S/R machine MCC room & Crusher House MCC room i.e. PLC system, HT/LT breaker, module, SFU, scoop actuator, all tripper at bunker floor, All hoist, belt scale, Metal Detector, SM/ILMS, Ventilation system, all VFD & S/R machines drives, SAC-3 &4, WT control system, Flap gate, DS system, battery charger at ER-1 & ER-3, UPS & PC at control S/R machine & lighting system.
Preventive Maintenance & Repairing / servicing of entire lighting system, HT/LT Breaker, Bus bar of switch gear rooms & MCC rooms, HT/LT Motor, Battery charger, Module, SFU, Control panel, MD, ILMS/SM, Belt scale, PLC system, control desk, Tripper CRD, PCCRD/ CCRD of S/R Machines, hoist, UPS, HT/LT cable laying, LT cable jointing including dismantling, end termination, Lugging, ferruling of cables etc. in CHP 2X210MW & 2X250 MW.
General Cleaning, removing of accumulated coal surrounding Power transformer at ER-3 S/G room, Cable trench, Cable gallery, near Crusher house MCC room, junction boxes, Electrical control panel in CHP area 2X210MW & 2X250 MW.
Deputation of service Engineer (PLC Expert) from OEM/Authorised by OEM for PLC system (2 Engineers 2 day 1 job) in CHP 2X210MW & 2X250 MW.
Deputation of experts for Maintenance of VFD Drives(Allen Bradley), Slew drive & LT Drive of S/R Machine (Yaskawa make) and Motor protection relays of HT/LT Breaker (Areva & ABB make), Metal Detector, Belt scale in CHP 2X210MW.
Deputation of expert services for SMS, ILMS, Metal Detector, Electromag
Shifting/ Inter shifting of HT/LT motors (Site to Store/Rewinding workshop/Central Store to site store) in CHP 2X210MW & 2X250 MW.
500 KW HT Motor of Crusher house
200 KW to 270 KW HT motor of NC-1A/B, 2A/B, 3A/B & 6A/B
110 KW to 145 KW LT motor of Conveyor & WT.
75 KW to 90 KW LT motor.
5.5KW to 55 KW LT Motor.
0.1 KW to 5.0 KW LT motor.
Servicing & Overhauling of HT/LT breaker & Bus bar of different S/G and MCC rooms
HT/LT breakers
Bus bar A & B of HT and LT switch gear rooms and MCC rooms in CHP 2X210 MW.
SFU & Module in LT switch gear rooms and MCC rooms in CHP 2X210 MW.
OPERATION & MAINTENANCE OF LOCOMOTIVES, 2x110MW,2X210MW & 2X250MW
Round the clock unloading through wagon tippler 1, 2, 3 & 4 and shifting of accumulated stones from wagon tippler area.
Management, round the clock operation and shunting works
Schedule maintenance of diesel locomotive (WDS-6 & 04 No BHEL Make 700 &1400 HP)
Daily preventive/routine/repairing and breakdown maintenance work of locomotives as per the recommendation of manufacturer/RDSO
Monthly schedule maintenance of LOCOS
Half yearly schedule maintenance of LOCOS
Deputation of experts for monthly schedule maintenance of LOCOS
Deputation of experts for half yearly schedule maintenance of LOCOS
Round the clock operation of in-motion weigh bridges for weighment of coal wagon (Loaded & Empty) passing through in-motion weigh bridges installed at PTPP, Parichha.
Round the clock operation of in-motion weigh bridges for weighment of coal wagon (Loaded & Empty) passing through in-motion weigh bridges installed at PTPP, Parichha.
Deputation of expert services of in-motion weigh bridges installed at PTPP, Parichha
Round the clock Complete Mechanical Maintenance of Wagon Tippler#1&2 and Beetle Charger Systems of Inhaul & Outhaul sides of Coal Handling Plant of 2x110MW
Round the Clock Mechanical Routine/Running Maintenance and Up keeping of Wagon Tippler#1&2 and Beetle Charger Systems of Inhaul and Outhaul sides of CHP2X110MW Units.
Daily Preventive Maintenance (Mechanical) of Wagon Tippler#1&2 and Beetle Charger Systems of Inhaul and Outhaul sides of CHP2X110MW Units.
Mechanical Breakdown maintenance:
Replacement of New/Repaired Gear Box of Wagon Tippler and Beetle Charger systems of Inhaul and Outhaul sides.
Replacement of supporting arrangement (Pivot Shaft) Bearing.
Replacement of different size Gear Coupling and Flange Coupling.
Shifting of Heavy Equipment /Spares.
Overhauling/Servicing of Gear Boxes.
Section-B (CHP 2x110MW)
Operation of Unloading Plant of CHP 2x110 MW and Sprinkler System at Richhaura Village Boundary
Round the clock complete operation of Unloading Plant (from conveyor 1A/1B to Conveyor 5A) through PLC system of 2x110 MW CHP and Round the clock operation of complete Sprinkler System at Richhaura Village Boundary of 2x110 MW CHP
Complete Mechanical Maintenance and Cleaning with Housekeeping Work of unloading plant of Coal Handling Plant of 2X110MW
Round the clock Routine Maintenance and up keeping of the unloading plant i.e. conv.1A/1B, 2A/2B, flap gates, All crusher house, 3A/3B, 4A, 5A and JTs in CHP as per scope of work.
Preventive Maintenance of unloading plant i.e. conv.1A/1B, 2A/2B, flap gates, All crusher house, 3A/3B, 4A, 5A, and JTs in CHP as per scope of work.
Mechanical Breakdown Maintenance of all type of auxiliaries of 2x110MW CHP
Replacement of conveyor pulleys whenever required.
Replacement of geared coupling
Replacement of flange coupling /fluid coupling.
Making of key way & bore as per required size of different type of coupling.
Fabrication of conveyor motor & gear boxes foundation.
Replacement of hold back device of conveyor.
Replacement of Old damaged bearings/sleeves/ Chucknut/washers/bearing housing/dust seal etc. all conveyor one side
Major repairing & fabrication of VGT Structure.
Replacement of flap gates.
Major repairing of RPG.
Overhauling of VFDs and Fabrication of VFD Tray.
Laying/ Replacement of conveyor belt size 1400mm/ 1200mm/ 1000mm with Hot/ cold joint of conveyor belt.
Positioning of broken and fallen conveyor belt.
Alignment of gearbox with motor, pulley of conveyor including coupling/decoupling.
Replacement of MS plate upto 1.5mtr.x0.5mtr.
Replacement of crusher shaft with alignment
Replacement of Cage breaker plate/upper kick off plates/lower kick off plates
Replacement & balancing of crusher hammer set
Shifting of heavy equipment such as gearboxes pulley crusher/screen shaft etc
Replacement of Centre Pipe
Re-fixing/replacement of helical spring of vibrating screen.
Fabrication & fixing of screen bearing housing base plate etc.
Replacement of Crusher /Screen Bearing one side
Repairing of flap gate, Replacement of deflector plate in conveyor Belt Chutes , Fabrication and replacement of guide plate
Repairing of worn-out duct plate /skirt board .
Minor Repairing of different pulley.
Replacement/fitment of vibrating screen shaft pulley
Minor Repairing of screen grating.
Replacement of AMR Coupling.
Fixing of MS liner in crusher No. 1, 2 & 3 chute.
General welding work in running mtr.
Cutting and removal of hanging SS liners from chute/hopper
Repairing/Replacement of crusher hood.
Shifting of different size pulleys from 0 meter to required floors/sites or vice versa
Replacement of screen grating.
Repairing of dewatering pumps.
Sprinkler system maintenance work near Richhaura boundary.
Repairing/ Overhauling of vertical centrifuge pump.
Replacement/Removing of chocking in sprinkler nozzle
Complete cleaning of unloading plant i.e. conv.1A/1B, 2A/2B, flap gates, All crusher house, 3A/3B, 4A, 5A, JT-1 Floor, JT-2 Floor in General shift
Complete cleaning and removal choking of unloading plant i.e. conv.1A/1B, 2A/2B, flap gates, All crusher house, 3A/3B, 4A, 5A, conv.6A, 11A , JT-1 Floor, JT-2 Floor in round the clock shift
Shifting of accumulated /spilled coal and stone (One Month=1Job)
Overhauling of gear boxes and replacement of damaged parts of different gear boxes of various conveyors.
Overhauling of gear boxes of Conv.1A/B, 2A/B, 3A/B, 4A
Overhauling of gear box of Conv.5A and 10A
Repairing and reconditioning of gear wheel /pinion teeth of conveyor gear boxes and hold back devices
Repairing of damaged Ist stage pinion teeth.
Repairing of damaged IInd stage wheel teeth.
Repairing of damaged IInd stage pinion teeth.
Repairing of damaged IIIrd stage pinion teeth.
Repairing of damaged final stage wheel teeth.
Repairing of hold back devices of conveyor 1A/B, 2A/B, 3A/B, 4A,
Replacement of oil seal
Replacement of oil seal of first stage pinion of various gear boxes
Replacement of oil seal of Last stage pinion of various gear boxes
ELECTRICAL SYSTEM ULOADING PLANT OF CHP 2X110MW
Round the clock routine and preventive maintenance of all 0.4KV electrical system of coal handling plant including lighting system of 2X110MW and FO/LDO system of 2x110mw, 2x210mw units” for Unloading plant of CHP 2x110 MW
Round the clock routine and preventive maintenance work of complete 6.6 KV CHP switch gear with their panels of CHP 2x110 MW MCC room (Total 13 Nos. Panels).
Breakdown maintenance of 0.4 kV LT switchgear and electrical system
Breakdown maintenance of 0.4 kV L.T. Module
Breakdown maintenance of 0.4 kV L.T. SFU
Breakdown maintenance of 0.4 kV L.T. control panel
Breakdown maintenance of 0.4 kV LT breaker
Breakdown maintenance of 0.4 KV of Bus bar of Main MCC room
Breakdown maintenance of 6.6 kV HT switchgear
Breakdown maintenance of 6.6 KV HT breaker
Breakdown maintenance of 6.6 KV/110 V PT Pannels
Breakdown maintenance of 6.6 KV Bus bar of Main MCC room
Shifting of LT motors from motor platform to site stores and vice-versa
147 KW motor of conveyors-2A/B
111 KW motor of conveyors- 4A
97 KW motor of conveyors-3A/B
34 KW motor of conveyors-1A/B
55 KW motor of out haul-1&2
30 KW motor of conveyors-5A & FO Unloading Pump
26 KW motor of LDO Unloading Pump
22 KW motor of Vibrating Screen / FO Transfer Pump/ DE of Bunker floor/ PF/Shifting of VFD Motor
77 KW motor of Inhaul
75 KW motor of Wagon Tippler
13 KW motor of conveyors-10A
11 KW motor of mono tail hoist/ LDO Transfer Pump /DE JT-1,2,3
15 KW motor of sump Pump 1 &2
15 KW motor of sump Pump 5 & 6/ Tube well/ 11KW Sump pump
Inter Shifting of LT Motors
147 KW motor of conveyors-2A/B
97 KW motor of conveyors-3A/B
34 KW motor of conveyors-1A/B
55 KW motor of out haul-1&2
30 KW motor of conveyors-5A & FO Unloading Pump
26 KW motor of LDO Unloading Pump
22 KW motor of Vibrating Screen / FO Transfer Pump/ DE of Bunker floor/ PF
77 KW motor of Inhaul
75 KW motor of Wagon Tippler
11 KW motor of mono tail hoist/ LDO Transfer Pump /DE JT-1,2,3
15 KW motor of sump Pump 1 &2
Shifting of VFD Motor
Star O and M Group (BID ID -5046502)
Phoenix Solutions (BID ID -5025847)
M/s Veenus Engineering (BID ID -5046794)
Renga Engineering Works (India) Pvt Ltd (BID ID -5037271)
Bidder Name
M/s Veenus Engineering
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
TS.pdf
Tender Documents • 1.69 MB
BOQ_1800588.xls
BOQ • 0.41 MB
Tenderdocument.pdf
Tender Documents • 1.69 MB
BOQ.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid