| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-Finance R O VILLAGE NALAG P O PAHAL SUB TEH SUNI DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | ₹4.5 L | L1 | Accepted-Finance Lowest |
| 2 | L2₹4.6 L+₹13,379.69 (3.00%)Rejected-Finance | ₹4.6 L+₹13,379.69 (3.00%) | L2 | Rejected-Finance 2nd Lowest |
Tender Value
Refer Docs
EMD Value
₹8,900
Closing Date
12 Aug 2026, 10:00 amClosed
Executive Engineer kasumpti Division HPPWD Shimla3
Executive Engineer kasumpti Division HPPWD Shimla3
C/O Parking Space with windsor cottage under Mehli Section
2026_PWD_140432_4
SD-I-CTR-Tender-13704 dated 01-08-2026
Open Tender
Civil Works
Percentage
30 days
Kasumpti
As per SBD
12 documents required · 12 mandatory
₹350
₹8,900
22 Aug 2026
4 Aug 2026
12 Aug 2026
4 Aug 2026
12 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting in Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm (Thirty centimetre) in depth, 1.5 m (One point five metre) in width as well as 10 sqm (ten Square Metre) on plan) including getting out and disposal of excavated earth all lead and lift as directed by Engineer-in-charge and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site (To be arranged by the contractor) as per satisfaction of Engineer- in -charge through all modes of transportation including head load ,animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour ( if required ) Any loss to the public and private propriety, human being, machinery during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. (i)All kinds of soil. | 1 | Per Cubic Metre | 400 | ₹399.6 |
| 2 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. Hard Roack blasting prohibited and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site, according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site (To be arranged by the contractor) including payment of prescribed charges of dumping to the owner of dumping site as per satisfaction of Engineer-in-Charge through all modes of transportation including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required).All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation the usefull stones as per the direction of the Engineer-in-Charge. Any loss to the public and private propriety during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | 1 | Per Cubic Metre | 450 | ₹449.55 |
| 3 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (i) 1:5:10 (One cement : five coarse sand) : ten graded stone aggregate 40 mm nominal size) | 1 | Per Cubic Metre | 4,600 | ₹4,595.4 |
| 3.1 | (ii) 1:3:6 (One cement : Three coarse sand) : Six graded stone aggregate 20 mm nominal size) | - | Per Cubic Metre | 5,800 | - |
| 4 | Providing weepholes in retaining / breast wall with 100 mm dia PVC pipe lead including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. | - | Per Running Metre | 200 | - |
| 5 | Backfilling behind retaining wall / breast wall, including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. | 1 | Per Cubic Metre | 1,300 | ₹1,298.7 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level including carriage of materials in all leads and lifts as per directions of the Engineer-in-charge. (i) Mild steel and Medium Tensile steel bars | - | Per Kilogram | 115 | - |
| 7 | Disposal of excavated earth work by debris material upto site on approved dumping siteapproved by M.C. including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. | - | Per Cubic Metre | 650 | - |
| 8 | Stone soling properly hand packed filling interstices with Kharanja stone and including watering and ramming consolidating with hand durmet complete under floor to the requisite gradient and camber including spreading watering and rolling of binding materials complete as per HP PWD specification 100mm spread thickness (finished work including materials and labour) including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. | 1 | Per Cubic Metre | 1,350 | ₹1,348.65 |
| 9 | Square masonry Random rubble masonry/polygonal rubble masonry(un-coursed/brought to courses) with hard stone of approved quality in foundation and plinth including leveling up with cement concrete 1:6:12 (One cement:Six sand:twelve graded stone aggregate 20mm (twenty milimetre)nominal size) in cement mortar 1:6 (One cement: Six sand) in breast wall and retaining walls including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. | - | Per Cubic Metre | 6,200 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
BOQ_208301.xls
BOQ • 0.32 MB
SBD445991.pdf
Tender Documents • 6.90 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .