Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹52.0 LAccepted-Finance | L1 | Accepted-Finance Accept | |
| 2 | L2₹55.2 L+₹3.2 L (6.13%)Accepted-Finance | L2 | Accepted-Finance Accept |
Tender Value
₹49.9 L
EMD Value
₹99,750
Closing Date
4 May 2023, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, PWD, WD-II, Diu
Executive Engineer, PWD, WD-II, Fort Road, Diu
AMC for the VRF system at Education Hub and Jalandhar Circuit House in Diu District.
2023_DIUDT_2798_1
e-Tender Noitce No. 07/2023-2024
Open Tender
Civil Works - Others
Works
60 days
Diu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Executive Engineer, PWD, WD-II, Diu
₹99,750
11 May 2023
1 May 2023
4 May 2023
1 May 2023
4 May 2023
1 May 2023
Amount
Works
Non Comprehensive AMC - Includes 3 Dry service Only in a year: Material cost extra as per rates given below - For Govt Polytech College Building & IIIT)
Non Comprehensive AMC - Includes 3 Dry service Only in a year: Material cost extra as per rates given below - For Jhalandar Beach Curcit House
One time repair cost of Education HUB VRF System For Polytech College Building (Ground Floor + 1st Floor, Polytech College Library 1st Floor) ODU 1 – Model – VDV-670W/DRN1-I (c) – Cooling capacity, N2 testing required- 67 KW- Library Area Piping nor connected to indoor, Cable termination pending, System leakages, All Sensor missing, Piping modification Piping insulation replacement, Power terminal replacement, Compressor checking, Commissioning.
One time repair cost of Education HUB VRF System For Polytech College Building (Ground Floor + 1st Floor, Polytech College Library 1st Floor) ODU 2 – Model – VDV-615W/DRN1-I (c) – Cooling capacity -61.5 KW - Library Area 1 Nos condenser fan motor, N2 Testing, system leakages check, control and power pcb, piping modification, piping insulation replacement, power terminal, compressor 1 nos model E655DH-65D2YG, Commissioning.
One time repair cost of Education HUB VRF System For Polytech College Building (Computer Lab at Polytech College 1st Floor) ODU 1 – Model – VDV-670W/DRN1-I (c) – Cooling capacity -67 KW - Lab Staff Room N2 Testing, system leakages, piping modification, piping insulation, power terminal, compressor 1 nos. model E655DHD-65D2YG, commissioning.
One time repair cost of Education HUB VRF System For Polytech College Building (Computer Lab at Polytech College 1st Floor) ODU 4&6 – Model – VDV-615W/DRN1-I (c) – Cooling capacity -61.5 KW - Lab Staff Room Gas Top up, Commissioning, & Service.
One time repair cost of Education HUB VRF System For Polytech College Building (Computer Lab at Polytech College 1st Floor) ODU 5– Model – VDV-850W/DRN1-I (c) – Cooling capacity -85.5 KW - Lab Staff Room N2 Testing, system leakages, piping modification, PCB for both outdoor and indoor, 2 nos condenser, body damage repair, piping insulation, power terminal, compressor 1 nos. model E655DHD-65D2YG, commissioning.
SITC of Special VRF Hard /soft refrigerant copper piping between indoor & outdoor units. All piping inside the room shall be properly supported with hanger & cable tray.
SITC 13/19 mm Nitrile Rubber Insulation with Alu Foil.
SITC of Communication cable between indoor and outdoor units as required to be laid in proper PVC hard & flexible Conduit.
SITC OF Hard PVC Drain Piping with Nitrile rubber insulation Condensate drain Water piping. 20/25mm Dia and 32/40mm dia.
SITC of AC system along with topping-up of refrigerant Gas (environment friendly gas) in Outdoor unit, R410A.
SITC Power cabling from electrical panel to necessary equipment’s including all necessary accessories like rigid conduits, flexible conduits, lugs, cable tie, glands, angles for support etc.
Supply, Fabrication & Installation from Mild Steel stand, supports for piping with duly Painted.
Testing, commissioning & handing over the Projects with 72 hours trails runs with air balancing the system.
Supply and installation Comprssor - R410 gas - 5.5 TR in Outdoor unit.
Supply and installation Comprssor - R410 gas - 8.5 TR.
Supply and installation Comprssor - R410 gas - 11.0 TR.
AC Remote - Corded.
AC Remote IR.
4 TR Tower AC - Midea.
TIRUPATI SARJAN LIMITED
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .