Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹5.7 L+₹25,071 (4.59%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹6.4 L+₹90,411.78 (16.5%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹6.6 L+₹1.1 L (20.3%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.2 L
EMD Value
₹24,660
Closing Date
24 Aug 2026, 4:00 pmClosed
EX ENGINEER REW KULGAM
EX ENGINEER REW KULGAM
PF BUND ZERO TO NADIWA 329
2026_RDPR_319815_5
e- NIT No. 55 OF REWK/PRI/2026-27 Dated 06-08-2026
Open Tender
Civil Works
Percentage
60 days
KULGAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
EX ENGINEER REW KULGAM
₹24,660
4 Sept 2026
6 Aug 2026
25 Aug 2026
6 Aug 2026
24 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas
(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including
disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by
Engineer-in-Charge.
2.7.1 All kinds of soil | 31.51 | cum | - | - |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas
(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including
disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by
Engineer-in-Charge.
Ordinary Rock. | 73.53 | cum | - | - |
| 3 | P / L dry stone solling hand packed | 3.93 | cum | 1 | ₹3.93 |
| 4 | P/L cement concrete of specified grade excluding cost of centring and shuttering all works up to plinth level.(1:4:8)mix.1cement 4coarse sand 8 stone aggregates. | 2.59 | cum | 1 | ₹2.59 |
| 5 | P/L cement concrete of specified grade excluding cost of centring and shuttering all works up to plinth level.(1:1.5:3)mix.1cement 1.5coarse sand 3 stone aggregates. | 9.36 | cum | 1 | ₹9.35 |
| 6 | P/L cement concrete of specified grade excluding cost of centring and shuttering all works up to plinth level.(1:1.5:3)mix.1cement 1.5coarse sand 3 stone aggregates. | 19.43 | cum | - | - |
| 7 | P/L cement concrete of specified grade excluding cost of centring and shuttering all works up to plinth level.(1:1.5:3)mix.1cement 1.5coarse sand 3 stone aggregates. | 6.17 | cum | - | - |
| 8 | Reinforcement work including cutting, bending, binding and placing in position all complete.Fe 500D or More. | 23.9 | Qtl | - | - |
| 9 | centering and shuttering including removal of formwork. | 6.15 | sqm | - | - |
| 10 | centering and shuttering including removal of formwork. | 86.18 | sqm | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
BOQ_1060672.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .