Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAccepted-AOC ERODE | TAMIL NADU | 638451 | ₹5.4 L | L1 | Accepted-AOC L1 BIDDER |
| 2 | L2₹5.5 L+₹3,504 (0.65%)Rejected-AOC KOLLAM | KERALA | 689694 | ₹5.5 L+₹3,504 (0.65%) | L2 | Rejected-AOC L2 BIDDER |
| Sl No | Description | Qty | Unit | SRI KRISHNA | SRI BANNARI AMMAN TRADERS |
|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF PASSENGER SHELTER AT DONNINGTON IN KOTAGIRI MUNICIPALITY. | |||||
| 1.01 | Earthwork excavation for foundation in all classes of soil except hard rock and depositing on Bank within initial lead of 10mt and lift of 2mt of all soil except rock etc., complete complying with standard specification. | 30 | m3 | 10,500 ₹10,500 | 10,350 ₹10,350 Lowest |
| 1.02 | P.C.C.1:4:8 mix using 40mm metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification. | 3.5 | m3 | 23,782.5 ₹23,782.5 | 23,772 ₹23,772 Lowest |
| 1.03 | Supplying, fabricating and placing in position of steel rods (M.S or RTS) including cost of binding wire and the rate including cost and conveyance of all materials and labour charges etc. complete complying with standard specification. | 1,120 | Kg | 1,17,600 ₹1,17,600 | 1,15,360 ₹1,15,360 Lowest |
| 1.04 | Supplying and erecting steel centering for the sides and soffits of RCC slab or plane surfaces excluding strutting and the rate including cost and conveyance of all materials and labour charges etc. Complete complying with standard specification.--For 1meter heght | 18 | m2 | 12,150 ₹12,150 | 12,078 ₹12,078 Lowest |
| 1.05 | For building | 68 | m2 | 93,976 ₹93,976 | 93,704 ₹93,704 Lowest |
| 1.06 | Reinforced cement concrete 1:11/2:3 mix using 20 mm size I.S.S. HBG metal mixing, laying and the rate including cost and conveyance of al materials and labour charges etc. Complete complying with standard specification. | 15 | m3 | 1,56,225 ₹1,56,225 | 1,56,165 ₹1,56,165 Lowest |
| 1.07 | Brick work in cement Mortar – 1:5 mix using best country Bricks and the rate including cost and conveyance of all materials and labour charges etc. Complete complying with standard specification. | 5.5 | m3 | 51,782.5 ₹51,782.5 | 51,766 ₹51,766 Lowest |
| 1.08 | Plastering in cm 1:3 mix to 10mm thick and the rate including cost and conveyance of all material and labour charges etc. Complete complying with standard specifications. | 20 | m2 | 8,500 ₹8,500 | 8,400 ₹8,400 Lowest |
| 1.09 | Plastering in cm 1:5 mix to 12mm thick and the rate including cost and conveyance of all material and labour charges etc. Complete complying with standard specifications. | 63 | m2 | 23,184 ₹23,184 | 22,932 ₹22,932 Lowest |
Tender Value
₹5.4 L
EMD Value
₹7,000
Closing Date
28 Aug 2025, 3:00 pmClosed
COMMISSIONER
MUNICIPAL OFFICE KOTAGIRI
CONSTRUCTION OF PASSENGER SHELTER AT DONNINGTON IN KOTAGIRI MUNICIPALITY.
2025_MAWS_593839_1
473-1/2025/A1
Open Tender
Civil Works - Others
Works
KOTAGIRI
REGISTERED CONTRACTOR IN GOVT SECTOR
1 document required · 1 mandatory
₹3,540
Yes
₹7,000
17 Nov 2025
19 Aug 2025
28 Aug 2025
19 Aug 2025
28 Aug 2025
19 Aug 2025
19 Aug 2025 - 28 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .