Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.8 LAccepted-AOC | ₹10.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.9 L+₹10,866.40 (1.01%)Rejected-Finance | ₹10.9 L+₹10,866.40 (1.01%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | P VADIVEL L2 | NATARAJAN.R L1 |
|---|---|---|---|---|---|
| 1.00Name of work: Providing Cement Concerete Pavement with drainage at CKK Nagar Thiruvazuvar Nagar Raman street H/O Perumugai | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 82.07 | cum | 270 ₹22,158.9 | 263.75 ₹21,645.96 Lowest |
| 3.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for cutting and levelling the surface | 26.86 | Cum | 140 ₹3,760.4 | 131.8 ₹3,540.15 Lowest |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. | 40.49 | Cum | 5,900 ₹2,38,891 | 5,835.4 ₹2,36,275.35 Lowest |
| 5.00 | Supply and Erection of steel centering using steel shutter for side wall including all etc complete. | 273.48 | sqm | 550 ₹1,50,414 | 547.5 ₹1,49,730.3 Lowest |
| 6.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.. | 38.21 | Cum | 6,700 ₹2,56,007 | 6,623 ₹2,53,064.83 Lowest |
| 7.00 | Supply and Fabrication of steel for RCC work including cost and conveyance of all materials to site and all labour charges etc complete. | 0.26 | MT | 92,000 ₹23,920 | 91,932.1 ₹23,902.35 Lowest |
| 8.00 | Reinforced Cement Concerete 1:1.5:3 mix using 20 mm metal including cost and conveyance of all materials to site and all labour charges etc complete. | 2.62 | Cum | 9,800 ₹25,676 | 9,738.92 ₹25,515.97 Lowest |
| 9.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. | 23.63 | cum | 7,300 ₹1,72,499 | 7,236 ₹1,70,986.68 Lowest |
| 10.00 | Plastering in cm 1:4 mix with 20 mm including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. | 45.38 | sqm | 600 ₹27,228 | 589 ₹26,728.82 Lowest |
Tender Value
₹10.9 L
EMD Value
₹10,950
Closing Date
7 Oct 2025, 3:00 pmClosed
Block Development Officer BP, T.N.Palayam
Block Development Office, T.N.Palayam
Providing Cement concrete pavement with drainage at CKK Nagar, Thiruvalluvar Nagar Raman street H/O.Perumugai
2025_RDTN_608255_1
2895/2025/A2 DT 22.09.25
Open Tender
Civil Works - Roads
Item Rate
120 days
Block Development Office, T.N.Palayam
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹10,950
9 Oct 2025
24 Sept 2025
7 Oct 2025
24 Sept 2025
7 Oct 2025
24 Sept 2025
Amount
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for cutting and levelling the surface
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Supply and Erection of steel centering using steel shutter for side wall including all etc complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete..
Supply and Fabrication of steel for RCC work including cost and conveyance of all materials to site and all labour charges etc complete.
Reinforced Cement Concerete 1:1.5:3 mix using 20 mm metal including cost and conveyance of all materials to site and all labour charges etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Plastering in cm 1:4 mix with 20 mm including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Supply and Fixing of Tar pad
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction) above this row in column "BB" for all works in this package}
P VADIVEL (BID ID -1476434)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_726933.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .