| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-Finance | L1 | Accepted-Finance Rate quoted is lowest | |
| 2 | L2₹2.0 L+₹12,757 (6.90%)Accepted-Finance | L2 | Accepted-Finance Rate quoted is second lowest | |
| 3 | L3₹2.0 L+₹13,246 (7.16%)Accepted-Finance | L3 | Accepted-Finance Rate quoted is third lowest | |
| 4 | L4₹2.0 L+₹16,858 (9.12%)Accepted-Finance 123 716 GADARIAN PURWA KANPUR NAGAR UTTAR PRADESH 208023 | KANPUR NAGAR | UTTAR PRADESH | 208023 | L4 | Accepted-Finance Rate quoted is highest |
Tender Value
₹2.0 L
EMD Value
₹2,000
Closing Date
25 Feb 2021, 4:00 pmClosed
Superintending Engineer
SE ETC Sultanpur 400KV S/S Campus Payagipur Sultanpur
REPLACEMENT OF COMPRESSOR, REPAIR, MAINTENANCE AND OVERHAULING OF 8.5 TON CENTERLISED AND 2.0 TON CAPACITY SPLIT AIR CONDITIONERS INSTALLED AT 220KV S/s NEW TANDA AND 132KV S/s AALAPUR AND JALALPUR UNDER E.T.D., AYODHYA
2021_UPTCL_550376_1
T. NO. 117/ETCS/2020-21
Open Tender
Electrical Works
Item Wise
60 days
Sultanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹236
SE ETC Sultanpur
₹2,000
27 Feb 2021
1 Feb 2021
26 Feb 2021
1 Feb 2021
25 Feb 2021
1 Feb 2021
1 Feb 2021 - 24 Feb 2021
Amount
Following works are to be carried out for Replacement of defective compressor, Repairing, Maintenance, Servicing & Overhauling of 8.5 ton Centralised 2.0 Ton Split Air Conditioners at 220 KV S/S New Tanda (Hitachi make) and 132 KV S/S Jalalpur (Hitachi make) & Aalapur (Hitachi make) under E.T.D. Ayodhya alongwith all associated works with all cost of men, material, misc. consumables, T & P etc. required for satisfactory completion of work including cost of transportation of materials as needed :-
Replacement of defective compressor & filling of Refrigerant Gas after checking, attending leakage by necessary pre testing, brazing, testing by pressurising with N2 Gas including necessary dismantaling and reassembling etc. in 8.0 Ton Centralised AC. (1 Job per AC)
Complete filling of Refrigerant Gas after checking, attending leakage by necessary pre testing, brazing, testing by pressurising with N2 Gas including necessary dismantaling and reassembling etc. in 2.0 Ton Split ACs. (1 Job per AC)
Topping up of Refrigerant Gas.(1 Job per AC)
Servicing and Overhauling of 2.0 Ton Split ACs by cleaning of filter & cooling coil, pressure cleaning by air/ water, brazing of coils and general cleaning.(Once in a quarter for each no. off AC in July 2019 & October 2019)
Repairing of 5 KVA capacity Stabilizer (Marc make) for 2.0 Ton Split AC with due Servicing and Testing including replacement of parts.
Providing and Fixing of Metal AC Supply Box with 01 No. MCB and Plug Top. (Any reputed make)
Replacement of damaged PCB with display board in 2.0 Ton Split ACs.
Replacement of Fan Blade of Outdoor Unit in 2.0 Ton Split ACs.
Replacement of Starting/ Running / Motor Capacitors in 2.0 Ton Split ACs.
Replacement of Indoor / Outdoor Fan Motor in 2.0 Ton Split ACs.
M/S SHUCHI ENTERPRISES
DEEP ELECTRICALS
M/S SUPER TRADING COMPANY
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .