Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.9 L
EMD Value
₹7,722
Closing Date
18 Dec 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Consultant Engineer-I(Civil),RIMS.
Regional Institutes of Medical Sciences, Imphal - 795001.
Construction of a new main gate including provision of a glow sign board for Department of Psychiatry , RIMS, Imphal.
2023_RIMS_784594_1
196/2023-24/RIMS/Imphal
Open Tender
Civil Works
Works
60 days
As Per Tender Document
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
Director, RIMS.
₹7,722
19 Dec 2023
8 Dec 2023
19 Dec 2023
8 Dec 2023
18 Dec 2023
8 Dec 2023
Amount
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable materialwithin 50 metres lead as per direction of Engineer-in-charge.
In Cement mortar
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead.
E/W in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width pr 10sqm on plan) i/c dressing of sides & ramming of bottoms, lift upto 1.5m, i/c getting out excavated soil and disposal of surplus excavated soil as directed within a lead of 50m.
a) All kinds of soil
Filling available excavated earth (excluding rock) in trenches, plinth sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering lead upto 50 metres lift upto 1.5 metre.
Dry rubble Flooring
Providing and laying in position cement concreteof specified grade excluding the cost of centering and shuttering
All works upto plinth level
1:4:8 (1 cem :4 c/sand : 8 graded stone aggregate 20 mm nom size)
1:2:4 (1 cem :2 c/sand : 4 graded stone aggregate 20 mm nom size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement-All work upto plinth level :
1:1.5:3 ( 1 cem : 1.5 c/sand : 3 graded stone aggregate 20 mm nom size )
Reinforced cement concrete work in walls (any thickness), including attached pilasters, butresses,plinth and string courses,fillets, columns, pillars, piers, abutments, posts and struts etc upto floor two level excluding the cost of centering, shuttering, finishing and reinforcement.
1:1.5:3 ( 1 cem : 1.5 c/sand : 3 graded stone aggregate 20 mm nom size )
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15 degree landings, balconies, shelves, chajjas, lintels, bands,plain window sills, staircases and spiral staircases upto floor two level excluding the cost of centering, shuttering, finishing and re-inforcement.
1:1.5:3 ( 1 cem : 1.5 c/sand : 3 graded stone aggregate 20 mm nom size )
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Upto & above plinth level
(b) Tor Steel Bars.
Centering and shuttering including strutting, proppong etc. and removal form for
a) Foundations, footings, bases of columns etc. and mass concrete
b) Columns, Pillars, Piers, Abutments, Posts and Struts.
c) Lintels, beams, plinth beams, girders, bressumers and cantilevers, with water proof ply 12mm thick.
Brick work with Ist class common burnt clay F.P.S.(non modular) bricks in superstructure above plinth level upto floor V level in all shapes and sizes in :Brick work with Ist class common burnt clay F.P.S.(non modular) bricks in superstructure above plinth level upto floor V level in all shapes and sizes in :
Cement mortar 1:4 (1 cement: 4 coarse sand)
Half brick masonry with Ist class common burnt clay F.P.S. (non modular) bricks in superstructure above plinth level upto floor V level in
Cement mortar 1 : 3 (1 cement : 3 coarse sand)
Steel work welded in built up sections, framed work in cutting, hoisting, fitting in position & priming coat of red lead paint .
In gratings, framed guard bars, ladders, railings, brackets and similar works.
12 mm cement plaster of mix:
1:4 (1 cement : 4 fine sand)
Providing and applying white cement based putty of average thickness 1mm,of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.
Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound ) content. With water thinnable cement primer on wall surface having VOC content less than 50 grams/litre
Finishing walls with Acrylic Smooth exterior paint of required shade: — New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including base coat of water proofing cement paint applied @ 2.20 kg/ 10 sqm).
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade: Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture.
Providing and installation of Glow Sign board.
M/S THOUNAOJAM SANA SINGH
Y.DEVENDRO SINGH
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .