Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAccepted-Finance VILL BELIABATHAN P O BIDHANBAG DIST PASCHIM BARDHAMAN PIN 713337 | BIDHANBAG | PASCHIM BARDHAMAN | WEST BENGAL | 713337 | L1 | Accepted-Finance Quoting Lowest rate | |
| 2 | L2₹6.8 L+₹33,456 (5.15%)Rejected-Finance | L2 | Rejected-Finance Quoting Higher rate | |
| 3 | L3₹7.7 L+₹1.2 L (18.4%)Rejected-Finance | L3 | Rejected-Finance Quoting Higher rate |
| Sl No | Description | Qty | Unit | REFRICON L3 | JASODA REFRIGERATOR SERVICING CENTRE L2 | ARATI ENTERPRISE L1 |
|---|---|---|---|---|---|---|
| 1.00 | Annual Comprehensive maintenance of 1.1/1.5/2/2.2 Ton capacity window /split type AC machine with necessary accessories & materials (158 Nos x12 Months =1896 Nos) | 1,896 | Nos | 349 ₹6,61,704 | 312 ₹5,91,552 | 289 ₹5,47,944 Lowest |
| 1.01 | Annual Comprehensive maintenance of 4/5.5 Ton capacity Tower/Doctable type AC machine with necessary accessories & materials . (9Nos. AC machine X 12 Month = 108 nos ) | 108 | Nos | 998 ₹1,07,784 | 850 ₹91,800 Lowest | 944 ₹1,01,952 |
| 2.00TERMS & CONDITIONS :- 1.Objective : The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of Comprehensive preventive and corrective maintenance is: To prevent fire hazards arising from RAC installations To ensure safety of occupants and the general public To minimize breakdowns and associated downtime and to ensure performance at desired efficiency. Any incident due to poor maintenance, especially fire hazards, shall be viewed seriously and the contractor shall be held fully responsible. | ||||||
| 2.01A. Scope of Work: The scope includes routine, preventive, corrective and Breakdown maintenance of the all Window, Split, Concealed Split, cassette, ductable, Tower & Package type AC machines, starting from Power supply point (Timer/Starter) to complete AC unit, within the premises, including but not limited to Supply, repair, and replacement of all spare parts and components. | ||||||
| 2.02A.1. General Requirements. 1.1 Spare Parts & Components and activities Covered The contract includes repair/replacement of: Compressor Blower motor / fan motor Condenser & evaporator coils P.C.B. and Power Supply Card, wherever applicable. Copper tubing and piping Capacitors (mandatory P2/S2 type, IEC 60252-1 compliant) Relays, thermostats, contactors Remotes Air filters Electrical wiring and controls related to A.C. machines Sheet metal body parts Nitrile Rubber Insulation of different sizes Minor Duct repair including G.I. Sheet, Thermal and Acoustic Insulation, mason covering for outside ducts etc. Refrigerant gas Drain Pump All replaced materials must be: New and OEM approved quality Approved by Engineer-in-Charge (EIC) prior to installation | ||||||
| 2.03The agency shall: 1.2 Materials & Consumables Provide all consumables required for maintenance, including: Cotton waste, insulation tape, Ferrules and lugs, Lubricants &grease, cleaning agents, Soaps etc. Fasteners, nuts& bolts, Drain pipe fittings, Copper pipe insulation, Contact cleaner spray Belts for AHU / ductable blowers, Refrigerant All Logbooks and/ or Register as mentioned in this document | ||||||
| 2.041.3 Tools & Instruments Provide and maintain calibrated tools and instruments, including: Digital multimeter, Digital Clamp-on ammeter Insulation resistance tester, Thermal Imaging Scanner Pressure gauges, Infrared thermometer and Digital Psychrometers Decibel Meter or SPL (Sound Pressure Level) Meter Air velocity meter / anemometer Coil cleaning chemical sprayer Fin comb for condenser/evaporator fins Vacuum cleaner / blower for cleaning indoor and outdoor units High-pressure Water jet pump for condenser coil cleaning Vacuum pump and Refrigerant charging hose set Nitrogen cylinder with regulator for pressure testing Brazing set with gas cylinder Drain line flushing pump Complete set of screwdrivers, Line Tester, Pliers & Stripper, spanners, Allen keys, adjustable wrenches, Hackshaw & Hammer, Electric Drill machine. Insulated ladder Chain pulley block (for heavy equipment where required)etc | ||||||
| 2.051.4 Uniform and Safety Gear (Applicable only when dedicated manpower is included in BOQ) Ensure all staff use proper uniforms. Provide at least two sets of uniforms and safety gear (helmet, Umbrella, raincoat, gumboots, etc.) to each staff member. The color end embossing should be as per direction of EIC. 1.5 Attendance & Monitoring (Applicable only when dedicated manpower is included in BOQ) Provide biometric attendance system for agency deployed staff if dedicated manpower is considered in BOQ. Maintain and monitor attendance records Maintain Registers and logbooks 1.6 Security Ensure watch and ward of all installations | ||||||
| 2.06A.2 Preventive Maintenance The agency shall carry out the following preventive maintenance activities with minimum frequency indicated against each activity: A.2.1 Monthly Activities Checking of Grill Temperature and Room Temperature Measuring Supply Voltage and current drawn by the machine Checking of Blower and Swing Motor, wherever applicable. Checking of Thermostat for proper functioning Cleaning of filters, coils, blowers Checking refrigerant levels/ pressures and leakage of gas Checking of all power and signal terminations Checking wiring between indoor and outdoor units Cleaning of cooling and condensing coils Checking condition of Capacitor Checking of Sound Level Performance testing Checking of any unwanted leakage current at the Indoor and outdoor units Checking the set point of Air-condition machines and if any abnormal temperature setting is noticed, that should be reset and specifically be noted in the log book. | ||||||
| 2.07A.2.2Half yearly Activities Tightening electrical connections A.2.3Annual Activities Thorough overhauling Painting of sheet metal/ support/ wooden frame of RAC/SRC at site A service report shall be submitted after each above activities, duly signed by the maintenance personnel and countersigned by the Agency/ Supervisor of the agency. Each and every activity and measurement value must also be entered in Log book in detail mentioning machine number, location, date & time. | ||||||
Tender Value
Refer Docs
EMD Value
₹13,029
Closing Date
27 Jul 2026, 11:00 amClosed
Sr.Superintending Engineer
Office of the Sr. Superintending Engineer, Western Electrical Circle , PWD, Purta Bhavan, 1st floor, Burdwan-713103
Annual Maintenance of 1.1 /1.5/1.6/2 Ton capacity window and Split type and 4/5.5 Ton capacity Floor standing/Ductable/cassette type AC machines installed at different places of Suri Electrical Section - III, under Birbhum Electrical Division ,PWD.
2026_WBPWD_5017017_1
WBPWD/SSEWEC /BRED /NIQ-24 /2026-27
Open Tender
ELECTRICAL WORKS ORG
Item Rate
365 days
Birbhum
Please refer Tender documents.
5 documents required · 5 mandatory
₹13,029
Office of the Sr. Superintending Engineer, Western
29 Jul 2026
20 Jul 2026
29 Jul 2026
20 Jul 2026
27 Jul 2026
21 Jul 2026
20 Jul 2026 - 21 Jul 2026
21 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Annual Comprehensive maintenance of 1.1/1.5/2/2.2 Ton capacity window /split type AC machine with necessary accessories & materials (158 Nos x12 Months =1896 Nos) | 1,896 | Nos | - | - |
| 1.01 | Annual Comprehensive maintenance of 4/5.5 Ton capacity Tower/Doctable type AC machine with necessary accessories & materials . (9Nos. AC machine X 12 Month = 108 nos ) | 108 | Nos | - | - |
| 2TERMS & CONDITIONS :- 1.Objective : The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of Comprehensive preventive and corrective maintenance is: To prevent fire hazards arising from RAC installations To ensure safety of occupants and the general public To minimize breakdowns and associated downtime and to ensure performance at desired efficiency. Any incident due to poor maintenance, especially fire hazards, shall be viewed seriously and the contractor shall be held fully responsible. | |||||
| 2.01 | A. Scope of Work:
The scope includes routine, preventive, corrective and Breakdown maintenance of the all Window, Split,
Concealed Split, cassette, ductable, Tower & Package type AC machines, starting from Power supply point
(Timer/Starter) to complete AC unit, within the premises, including but not limited to Supply, repair, and
replacement of all spare parts and components. | - | - | - | - |
| 2.02 | A.1. General Requirements.
1.1 Spare Parts & Components and activities Covered
The contract includes repair/replacement of:
Compressor
Blower motor / fan motor
Condenser & evaporator coils
P.C.B. and Power Supply Card, wherever applicable.
Copper tubing and piping
Capacitors (mandatory P2/S2 type, IEC 60252-1 compliant)
Relays, thermostats, contactors
Remotes
Air filters
Electrical wiring and controls related to A.C. machines
Sheet metal body parts
Nitrile Rubber Insulation of different sizes
Minor Duct repair including G.I. Sheet, Thermal and Acoustic Insulation, mason covering for
outside ducts etc.
Refrigerant gas
Drain Pump
All replaced materials must be:
New and OEM approved quality
Approved by Engineer-in-Charge (EIC) prior to installation | - | - | - | - |
| 2.03 | The agency shall:
1.2 Materials & Consumables
Provide all consumables required for maintenance, including:
Cotton waste, insulation tape, Ferrules and lugs, Lubricants &grease, cleaning agents, Soaps
etc.
Fasteners, nuts& bolts, Drain pipe fittings, Copper pipe insulation, Contact cleaner spray
Belts for AHU / ductable blowers, Refrigerant
All Logbooks and/ or Register as mentioned in this document | - | - | - | - |
| 2.04 | 1.3 Tools & Instruments
Provide and maintain calibrated tools and instruments, including:
Digital multimeter, Digital Clamp-on ammeter
Insulation resistance tester, Thermal Imaging Scanner
Pressure gauges, Infrared thermometer and Digital Psychrometers
Decibel Meter or SPL (Sound Pressure Level) Meter
Air velocity meter / anemometer
Coil cleaning chemical sprayer
Fin comb for condenser/evaporator fins
Vacuum cleaner / blower for cleaning indoor and outdoor units
High-pressure Water jet pump for condenser coil cleaning
Vacuum pump and Refrigerant charging hose set
Nitrogen cylinder with regulator for pressure testing
Brazing set with gas cylinder
Drain line flushing pump
Complete set of screwdrivers, Line Tester, Pliers & Stripper, spanners, Allen keys, adjustable
wrenches, Hackshaw & Hammer, Electric Drill machine.
Insulated ladder
Chain pulley block (for heavy equipment where required)etc | - | - | - | - |
| 2.05 | 1.4 Uniform and Safety Gear (Applicable only when dedicated manpower is included in BOQ)
Ensure all staff use proper uniforms. Provide at least two sets of uniforms and safety gear (helmet,
Umbrella, raincoat, gumboots, etc.) to each staff member. The color end embossing should be as per
direction of EIC.
1.5 Attendance & Monitoring (Applicable only when dedicated manpower is included in BOQ)
Provide biometric attendance system for agency deployed staff if dedicated manpower is
considered in BOQ.
Maintain and monitor attendance records
Maintain Registers and logbooks
1.6 Security
Ensure watch and ward of all installations | - | - | - | - |
| 2.06 | A.2 Preventive Maintenance
The agency shall carry out the following preventive maintenance activities with minimum frequency indicated
against each activity:
A.2.1 Monthly Activities
Checking of Grill Temperature and Room Temperature
Measuring Supply Voltage and current drawn by the machine
Checking of Blower and Swing Motor, wherever applicable.
Checking of Thermostat for proper functioning
Cleaning of filters, coils, blowers
Checking refrigerant levels/ pressures and leakage of gas
Checking of all power and signal terminations
Checking wiring between indoor and outdoor units
Cleaning of cooling and condensing coils
Checking condition of Capacitor
Checking of Sound Level
Performance testing
Checking of any unwanted leakage current at the Indoor and outdoor units
Checking the set point of Air-condition machines and if any abnormal temperature setting is
noticed, that should be reset and specifically be noted in the log book. | - | - | - | - |
| 2.07 | A.2.2Half yearly Activities
Tightening electrical connections
A.2.3Annual Activities
Thorough overhauling
Painting of sheet metal/ support/ wooden frame of RAC/SRC at site
A service report shall be submitted after each above activities, duly signed by the maintenance personnel and
countersigned by the Agency/ Supervisor of the agency. Each and every activity and measurement value must
also be entered in Log book in detail mentioning machine number, location, date & time. | - | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 17.49 MB
new2911.pdf
Tender Documents • 0.51 MB
BOQ_5086942.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .