Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-AOC | ₹9.2 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹10.0 L+₹78,660.59 (8.55%)Rejected-Finance | ₹10.0 L+₹78,660.59 (8.55%) | L2 | Rejected-Finance 2nd lowest bid |
| 3 | L3₹10.0 L+₹81,469.90 (8.85%)Rejected-Finance FLAT NO 1 234 E 16 AHIANA BUILDING XELPEM DULER MAPUSA GOA | ₹10.0 L+₹81,469.90 (8.85%) | L3 | Rejected-Finance 3rd lowest bid |
| 4 | L4₹10.6 L+₹1.4 L (15.3%)Rejected-Finance | ₹10.6 L+₹1.4 L (15.3%) | L4 | Rejected-Finance 4th lowest bid |
Tender Value
₹10.4 L
EMD Value
₹20,810
Closing Date
23 Jan 2026, 5:00 pmClosed
Executive Engineer
Executive Engineer, Works Division-X (Stores), PWD, Vidyanagar-Aquem, Margao-Goa
SITC of New Fire Alarm System and Comprehensive Maintenance Contract of 4 Years for Existing Fire Protection System and 3 Years for New Fire Alarm System for Court Of The Civil Judge Jr Division and JMFC Valpoi Sattari Goa
2026_PWD_27108_1
No.21/25-26/PWD/WD.X/TN-10
Open Tender
Job Works
Percentage
1460 days
Sattari
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
₹20,810
4 Sept 2026
9 Jan 2026
27 Jan 2026
9 Jan 2026
23 Jan 2026
10 Jan 2026
Supplying and fixing priming tank HDPE 1000 litres capacity, mounting with all pipework and valves etc.as required complete.
Supply, Fabrication, Erection, Testing, and commissioning of the following sizes of G.I. ERW C class pipes (conforming to IS -1239), Erection Above Ground (including proper iron supports and anchor fasteners), and Laying Underground with all fittings (standard MS fitting with welded joint shall be used on the pipes) including tees, elbows, reducers, union, flanges, rubber gaskets, GI nuts bolts, Washer, tie bolt, supports, clamps, etc, with one coat of red oxide primer and one coat of synthetic enamel paint. 50mm
Supply, Installation, Testing, and Commissioning of the following size cast iron double flange Butterfly Valve with matching flange, nut bolts & gasket. 50mm
Supply, Installation, Testing, and Commissioning of the following size cast iron double flange Butterfly Valve with matching flange, mut bolts & gasket. 100mm
Supply, Installation, Each 10000.0이 10000 Testing, and Commissioning of the following size cast iron double flange Non-Return Valve with matching flange, nut bolts & gasket. 50 mmm
Supply, Installation, Testing, and Each Commissioning of the following size cast iron double flange Non-Return Valve with matching flange, nut bolts & gasket. 100 mm
Supply, Installation, Testing, and Commissioning of pressure gauge of 100 mm Ø., 0- 300 PSI or 0-14 kg per cm square fitted with 12/15 mm Ø. pad cock valve, and G.I. pipe, elbow etc.
Supply, Installation, Testing, and Commissioning of pressure switch with 12/15 mm Ø isolation valve, G.I. nipple, elbow etc.
Painting of Hydrant Ring Main with two coats of red oxide primer and one coats of synthetic enamel paint
Removal of the Existing of 15 Hp Pump Motor Set
Supply, Installation, perfect aligning and proper leveling and testing, and Commissioning of centrifugal pump set, electrically driven complete with all1 accessories suitable for pumping water with 900 Each coupled with 11.19 KW of electric motor AC 3 phase, 50Hz including supply and fixing the items, such as necessary connection from starter to the motor terminal using proper size of copper cable including, the connection of suction pipe from pump to foot valve, delivery pipe connected to the raising mains of the overhead reservoir by means of suitable joints painting the suction and delivery pipe with super enamel paint over a coat of primer as per standard code of colour including MS base plate complete complete all as specified and directed. (Main pump Hydrant))
Supply of 3 core armoured PVC/XLPE insulated PVС sheathed copper conductor cable of 1.1 KV grade with ISI mark conforming to IS: 1554(Part I) IS:7098(Part I) with latest amendments of following size.;3 Core 6 sq.mm
Supply of 4 core armoured PVC/XLPE insulated PVC sheathed copper conductor cable of 1.1 KV grade with ISI mark conforming to IS: 1554(Part I) IS:7098(Part I) with latest amendments of following size.;4 Core 10 sq.mm
Supplying and making cable end terminations with brass compression gland and copper lugs for folowing sizes of 3 Core PVC insulated PVC sheathed/XLPE aluminium conductor cable of 1.1 KV grade complete as required.;(3) 3 x 6 Sq. mm.
Supplying and making cable end terminations with brass compression gland and copper lugs for folowing sizes of 4 Core PVC insulated PVC sheathed/XLPE aluminiumconductor cable of 1.1 KV grade complete as required.; (4) 4 x 10 Sq. mm.
Laying of one number PVC insulated and PVC sheathed/XLPE power cable of 1.1 KV grade of size not exceeding 25 sq. mm on surface etc. complete as required
Supplying and laying 25 mm x 5 mm GI strip at 0.5 m below ground as strip earth electrode including soldering etc. as required
Earthing with GI earth plate 600 mm x 600 mm x 6 mm thick including accessories and providing masonry enclosure with CI /RCC cover having locking /Lifting arrangement and watering pipe etc. (but without charcoal or coke and salt) as required as per the Earthing Drawing provided by the EngineerIncha rge.The scope of work includes the following: a) Excavation of pit of size 1.0x1.0x 3.0 mtrs(min) and disposal of excavated soil. c)Watering GI pipe 20mm Class B with funnel as per specs. d) Charcoal/salt as per specs (paid seperately). e) Refilling the pit of size 1.0x1.0x 3.0 mtrs (min) with soft black agriculture soil of minimum resistivity i/c transportation. e)Masonary chamber with proper foundation cover plate and locking arrangement. f) Testing of earth value with earth megger and certifications of its value. Aluminium tag with embossed earthing value to be attached to the pipe.g) watering arrangement(pl Set 2 8989.00 17978 umbing will be paid seperately ).;(a) In soily strata
Extra for using salt and charcoal for GI or copper plate carth electrode ns required( 96 Kgs of Charcoal and 5 Kgs of Salt)
Supplying and installation of autoglow Exit signage board
Supplying and installation of autoglow Fire Extinguisher Signage
Supplying and installation of auto glow Hose Reel Hose Signage
Supplying and installation of auto glow Assembly Point Signage
Supplying and installation of auto glow Arrow Tape (Line of Escape) Signage (40mm X 10mtr)
Supply, installation, testing, and commissioning of conventional type Manual Call Point with back bох.
Supplying, installing, testing and commissioning of conventional type Sounder with strobe light
Supply, installation, testing and commissioning of conventional type Smoke detector with base
Supplying, installing, testing and commissioning of Conventional Type Heat detector with base
Supply, Installation, Testing & Commissioning of 2 Zone Micro processer based Fire Alarm Control panel with battery charger, 48 hours battery back-up and related accessories
Supply of 2 core armoured PVC/XLPE insulated PVC sheathed copper conductor cable of 1,1 KV grade with IS1 mark conforming to IS: 1554(Part 1) IS:7098(Part 1) with latest amendments of following size.;2 Core 1.5 sq.mm
Refilling of Fire Extinguisher ABC - 5 kg range ofjet 6 mtrs, fire rating 4A 55B, working pressure 15 KGF/cm2, Hydrant pressure 35 KGF /cm2, Bursting Pressure 55 KGF/cm2, complete with installation. 1st year
Refilling of Fire Extinguisher ABC -5 kg range ofjet 6 mtrs, fire rating 4A 55B, working pressure 15 KGF/cm2, Hydrant pressure 35 KGF /cm2, Bursting Pressure 55 KGF/cm2, complete with installation. 2nd year
Refilling of Fire Extinguisher ABC -5 kg range of jet 6 mtrs, fire rating 4A 55B, working pressure 15 KGF/cm2, Hydrant pressure 35 KGF /cm2, Bursting Pressure 55 KGF/cm2, complete with installation. 3rd year
Refilling of Fire Extinguisher ABC - 5 kg range ofjet 6 mtrs, fire rating 4A 55B, working pressure 15 KGF/cm2, Hydrant pressure 35 KGF /cm2, Bursting Pressure 55 KGF/cm2, complete with installation. 4th year
Refilling of Fire Extinguisher ABC - 6 kg range of jet 6 mtrs, fire rating 4A 55B, working pressure 15 KGF/cm2, Hvdrant nressure 35 KGE /cm2, Bursting Pressure 55 KGF/cm2, Full weight-9.3 kg complete installation. Approved rates ISI Mark. 1st Year
Refilling of Fire Extinguisher ABC - 6 kg range of jet 6 mtrs, fire rating 4A 55B, working pressure 15 KGF/cm2, Hydrant pressure 35 KGF /cm2, Bursting Pressure 55 KGF/cm2, Full weight-9.3 kg complete installation. Approved rates ISI Mark. 2nd Year
Refilling of Fire Extinguisher ABC -6 kg range ofjet 6 mtrs, fire rating 4A 55B, working pressure 15 KGF/cm2, Hydrant pressure 35 KGF /cm2, Bursting Pressure 55 KGF/cm2, Full weight-9.3 kg complete installation. Approved rates ISI Mark. 3rd Year
Refilling of Fire Extinguisher ABC - 6 kg range ofjet 6 mtrs, fire rating 4A 55B, working pressure 15 KGF/cm2, Hydrant pressure 35 KGF /cm2, Bursting Pressure 55 KGF/cm2, complete with installation. 4th year
Refilling of Fire Extinguisher CO2 - 2 kg range of jet 2 mtrs, fire rating 13B, working pressure 60 KGF /cm2, Hydrant pressure 250 KGF /cm2, Bursting Pressure 600KGF/cm2, complete with installation. 1st year
Refilling of Fire Extinguisher CO2 - 2 kg range ofjet 2 mtrs, fire rating 13B, working pressure 60 KGF /cm2, Hydrant pressure 250 KGF /cm2, Bursting Pressure 600KGF/cm2, complele with installation. 2nd year
Refilling of Fire Extinguisher CO2 - 2 kg range of jet 2 mtrs, fire rating 13B, working pressure 60 KGF /cm2, Hydrant pressure 250 KGF /cm2, Bursting Pressure 600KGF/cm2, complete with installation. 3rd yea
Refilling of Fire Extinguisher CO2 - 2 kg range of jet 2 mtrs, fire rating 13B, working pressure 60 KGF /cm2, Hydrant pressure 250 KGF /cm2, Bursting Pressure 600KGF/cm2, complete with installation. 4th year
Refilling of Fire Extinguisher CO2 - 4.5 kg range of jet 2 mtrs, fire rating 13B, working pressure 60 KGF /cm2, Hydrant pressure 250 KGF /cm2, Bursting Pressure 600KGF/cm2, complete with installation. 1st Year
Refilling of Fire Extinguisher CO2- 4.5 kg range of jet 2 mtrs, fire rating 13B, working pressure 60 KGF /cm2, Hydrant pressure 250 KGF /cm2, Bursting Pressure 600KGF/cm2, complete with installation. 2nd Year
Refilling of Fire Extinguisher CO2- 4.5 kg range of jet 2 mtrs, fire rating 13B, working pressure 60 KGF /cm2, Hydrant pressure 250 KGF /cm2, Bursting Pressure 600KGF/cm2, complete with installation. 3rd Year
Refilling of Fire Extinguisher CO2 - 4.5 kg range of jet 2 mtrs, fire rating 13B, working pressure 60 KGF /cm2, Hydrant pressure 250 KGF /cm2, Bursting Pressure 600KGF/cm2, complete with installation. 4th Year
Refilling of Fire Extinguisher C/Agent FM200 Modular Type - 5 kg capacity complete with i nstallation. 1s Nos 2 7500.00 15000 t Year
Refilling of Fire Extinguisher C/Agent FM200 Modular Type - 5 kg capacity. complete with installation. Nos 2 7500.00 15000 2nd Year
Refilling of Fire Extinguisher C/Agent FM200 Modular Tуре - 5 kg capacity complete with installation. 3rd Year
Refilling of Fire Extinguisher C/Agent FM200 Modular Type - 5 kg capacity complete with installation. 4th Year
Hydraulic pressure testing up to 35 kg/Sq cm as per IS 2190 (ABC). (At the end of 4th Year)
Hydraulic pressure testing up to 250 kg/Sq cm as per IS 2190 (CO2 2Kg And 4.5 Kg Cylinder) (At the end of 4th Year)
Hydraulic pressure testing up to 35 kg/Sq cm as per IS 2190 (Modular Type Clean Agent). (At the end of the 4th year
Press control level for ABC for 6kg
Press gauge for ABC 6kg.
Syphon for ABC 6kg.
Discharge hose pipe for ABC 6kg DCP
Discharge hose for CО2 with horn (3kg)
Regulator valve for CO2 4.5 Kg
CO2 band horn for 4.5 Kg
Periodic and preventive maintenance (one servicing per Quarter) including repairs and replacement of wear and tear of components that come under a comprehensive maintenance contract. Any breakdown should be attended within 24 hours of the call. Servicing of Pumps, including oiling, greasing of all moving parts, replacement of worn out or damaged parts such as couplers, bearings, shafts, impellers, etc as well as calibration of all pressure gauges and Pump Panel Maintenance. In case the pump has to be taken for repairs at the workshop. The agency will have to provide a stand-by pump on site till the pump gets r epaired. Single Stage Pump at 44 m Head Centrifugal Typе, 15 HP, 3 Phase, 415 Volt, 50Hz (Main Pump - 1 No.) 1st Year
eriodic and preventive maintenance (one servicing per Quarter) including repairs and replacement of wear and tear of components that come under a comprehensive maintenance contract. Any breakdown should be attended within 24 hours of the call. Servicing of Pumps, including oiling, greasing of all moving parts, replacement of worn out or damaged parts such as couplers, bearings, shafts, impellers, etc as well as calibration of all pressure gauges. In case the pump has to be taken for repairs at the workshop. The agency will have to provide a stand-by pump on site till the pump gets r epaired. Nos 50000.0 50000 0 Single Stage Pump at 44 m Head Centrifugal Type, 15 HP, 3 Phase, 415 Volt, 50Hz (Main Pump - 1 No.) 2nd Year
Periodic and preventive maintenance (one servicing per Quarter) including repairs and replacement of 0 wear and tear of components that come under a comprehensive maintenance contract. Any breakdown should be attended within 24 hours of the call. Servicing of Pumps, including oiling, greasing of all moving parts, replacement of worn out or damaged parts such as couplers, bearings, shafts, impellers, etc as well as calibration of all pressure gauges. In case the pump has to be taken for repairs at the workshop. The agency will have to provide a stand-by pump on site till the pump gets r epaired. Single Stage Pump at 44 mHead Centrifugal HP, 3 Phase, Tурс, 15 50Hz 415 Volt, (Main Pump-1 3rd Yenr
Testing the system every quarter and carrying mock out drills of the system and also in case of emergency. Also submitting quarterly reports of the test carried out on the performance of all Fire Fighting Equipment like Hydrant valves, Hose Reel Drum Assemblies, Hose Boxes, Hoses, Branch pipes with nozzles, Fire Brigade Inlets, etc., and other similar items. 1st Year
Testing the system every quarter and carrying out mock drills of the system and also in case of emergency. Also submitting quarterly reports of the test carried out on the performance of all Fire Fighting Equipment like Hydrant valves, Hose Reel Drum Assemblies, Hose Boxes, Hoses, Branch pipes with nozzles, Fire Brigade Inlets, etc., and other similar items. 2nd Year
Testing the system every quarter and carrying out mock drills of the system and also in case of emergency. Also submitting quarterly reports of the test carried out on the performance of all Fire Fighting Equipment like Hydrant valves, Hose Reel Drum Assemblies, Hose Boxes, Hoses, Branch pipes with nozzles, Fire Brigade Inlets, etc., and other similar items 3rd Year
Testing the system every quarter and carrying out mock drills of the system and also in case of emergency. Also submitting quarterly reports of the test carricd out on the performance of all Fire Fighting Equipment like Hydrant valves, Hose Reel Drum Assemblies, Hose Boxes, Hoses, Branch pipes with nozzles, Fire Brigade Inlets, etc., and other similar items. 4th Year
Annual Comprehensive Maintenance for the Fire Alarm system is as follows Monthly preventive maintenance of all types of detectors, beam detectors, etc. including cleaning of dust from the detectors as and when requir ed Quarterly preventive maintenance of all type of detectors, manual call points, hooters, etc. including cleaning of dust from the detectors whenever required Six Monthly preventive maintenance of Fire Alarm Panel including cleaning of the panel, tightening of the wires and checking of the battery voltage (Must also provide a copy of the history log) 1st Year
Annual Comprehensive Maintenance for the Fire Alarm system is as follows Monthly preventive maintenance of all types of detectors, beam detectors, etc. including cleaning of dust from the detectors as and when requir ed Quarterly preventive maintenance of all types of detectors, manual call points, hooters, etc. including cleaning of dust from the detectors whenever required Six Monthly preventive maintenance of the Fire Alarm Panel including cleaning of the panel, tightening of the wires and checking of the battery voltage (Must also provide a copy of the history log) 2nd Year
Annual Comprehensive Maintenance for the Fire Alarm system is as follows Monthly preventive maintenance of all types of detectors, beam detectors, etc. including cleaning of dust from the detectors as and when requir ed Quarterly preventive maintenance of all types of detectors, manual call points, hooters, etc. including cleaning of dust from the detectors whenever required Six Monthly preventive maintenance of the Fire Alarm Panel including cleaning of the panel, tightening of the wires and checking of the battery voltage (Must also provide a copy of the history log) 3rd Yea
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
Tendernotice_2.pdf
PDF • 0.56 MB
Tendernotice_3.pdf
PDF • 0.21 MB
BOQ_27551.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .