Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 CrAdmitted-Finance | ₹4.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.1 CrAdmitted-Finance | ₹4.1 Cr | L2 | Admitted-Finance |
| 3 | L3₹4.1 CrAdmitted-Finance | ₹4.1 Cr | L3 | Admitted-Finance |
| 4 | Rejected-Technical 64 1 EXSERVICE MAN COLONY BHAVANISAGAR 638451 SATHYAMANGALAM TK ERODE DISTRICT TAMIL NADU | ERODE | TAMIL NADU | 638451 | - | - | Rejected-Technical Satisfied EMD and not satisfied BQR conditions |
| 5 | Rejected-Technical 3 238 VENKATESA LAYOUT S V MILLS POST UDUMALPET 642 128 | UDUMALPET | TIRUPPUR | TAMIL NADU | 642128 | - | - | Rejected-Technical Satisfied EMD and not satisfied BQR conditions |
| Sl No | Description | Qty | Unit | K.RAJAGOPALAN AND CO L1 | stanely hitech construction company private limited L2 | T.Narasimhan L3 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing scrub jungle with uprooting down stream side, upstream side & approach road side and disposing of the same as directed by the Engineer in charge of the works as per technical specification. | 20,000 | m2 | 10 ₹2,00,000 Lowest | 10 ₹2,00,000 Lowest | 11 ₹2,20,000 |
| 2.00 | Cutting and removal of vegetative debris on the approach to wier and disposed away from the site as per the directed by the Engineer in charge of the works as per technical specification including cost of labour, hire charges etc,. complete. | 2,500 | RM | 50 ₹1,25,000 Lowest | 56 ₹1,40,000 | 100 ₹2,50,000 |
| 3.00 | Clearing of chocked culverts across the existing road at different chainage including upstream side,barral portion, down stream side , cleaning , disposal of debris away from site ,all lead,lift etc complete. | 25 | Nos | 3,001 ₹75,025 | 3,367 ₹84,175 | 2,000 ₹50,000 Lowest |
| 4.00 | Earth work excavation in hard stiff clay, stiff black cotton, hard red earth, shale, murram gravel, stoney earth & earth mixed with small size boulders and hard gravelly soil and depositing the earth in the places shown by the Engineer with initial lead of 10 M and initial lift of 2 m etc., complete,for culvert and retaining wall at approach road complying with standard specifications. | 2,220 | m3 | 175 ₹3,88,500 Lowest | 214 ₹4,75,080 | 200 ₹4,44,000 |
| 5.00 | Refilling with earth including cost of all materials, labour, lead, lift etc., complete for building basement as per specification and as directed by the Engineer at site. | 125 | m3 | 70 ₹8,750 Lowest | 77 ₹9,625 | 100 ₹12,500 |
| 6.00 | Providing and placing in position M10 grade (one cement, three sand, and six part of aggregate ) for culvert , retaining wall on the approach road and up stream side pitching using broken hard granite coarse aggregate (well graded) of nominal maximum size of 40mm and down graded to I.S specified grading and mixing the ingredients in approved mixer including placing in layers and vibrating, curing, finishing the surface with all leads and lifts, labour etc., complete as per the direction of the Engineer and complying with standard specifications. | 115 | m3 | 8,400 ₹9,66,000 Lowest | 9,018 ₹10,37,070 | 9,500 ₹10,92,500 |
| 7.00 | Providing and placing in position M15 grade using broken hard granite coarse aggregate size of 20 mm and down graded for steps and name board post including, Shuttering Charges, placing in layers and vibrating, curing, finishing the surface with all leads and lifts, labour etc., complete as per the direction of the Engineer and complying with standard specifications. | 12 | m3 | 9,201 ₹1,10,412 Lowest | 10,032 ₹1,20,384 | 11,000 ₹1,32,000 |
| 8.00 | Providing and placing in position M15 grade using broken hard granite coarse aggregate (well graded) of nominal maximum size of 40mm & 20 mm and down graded to I.S specified grading and mixing the ingredients in approved mixer including shuttering charges,placing in layers and vibrating, curing, finishing the surface with all leads and lifts, labour etc.,complete for protection wall on the approach road as per the direction of the Engineer and complying with standard specifications. | 435 | m3 | 9,800 ₹42,63,000 Lowest | 11,557 ₹50,27,295 | 12,000 ₹52,20,000 |
| 9.00 | Filling the HBG 10mm to 40mm machine crushed metal for filling the filter material for Earth slip protection wall including cost of all materials transportation, consoliation, lead, lift, etc complete. | 310 | m3 | 5,000 ₹15,50,000 Lowest | 5,560 ₹17,23,600 | 5,000 ₹15,50,000 Lowest |
| 10.00 | Providing and placing in position M20 grade for Protection wall & Column, Plinth beam, Lintel, sunshade, Beam, Roof slab, Precast slab for Guard room and control room using broken hard granite coarse aggregate (well graded) of nominal maximum size of 20mm downgraded to I.S specified grading and mixing the ingredients in approved mixer including placing in layers and vibrating, curing, finishing the surface with all leads and lifts, labour etc., complete but excluding cost of steel reinforcement as per the direction of the Engineer and complying with standard specifications. | 1 | m3 | 11,500 ₹11,500 Lowest | 13,395 ₹13,395 | 14,500 ₹14,500 |
Tender Value
Refer Docs
EMD Value
₹7 L
Closing Date
8 Apr 2026, 2:00 pmClosed
The Chief Engineer/Civil/DRIP,TNGECL/HQ
The Chief Engineer/Civil/DRIP,TNGECL,III floor Eastern Wing, NPKRR Maaligai, 144, Anna Salai, Chennai 600002
TNGECL- DRIP-Dam Rehabilitation and Improvement Project works to Western Catchment Weir II in Kundah Generation Circle, Nilgiris District, Tamil Nadu under World Bank funded DRIP II
2026_EBMDB_669228_1
DRIP II/CE/C/DRIP/PD/SPMU/NCB No. 06 /2025-26
Open Tender
Civil Works - Others
Works
365 days
The Nilgiris
As per Specification
5 documents required · 5 mandatory
₹0
₹7 L
Yes
30 Jul 2026
3 Mar 2026
8 Apr 2026
3 Mar 2026
8 Apr 2026
4 Mar 2026
4 Mar 2026 - 13 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing scrub jungle with uprooting down stream side, upstream side & approach road side and disposing of the same as directed by the Engineer in charge of the works as per technical specification. | 20,000 | m2 | - | - |
| 2 | Cutting and removal of vegetative debris on the approach to wier and disposed away from the site as per the directed by the Engineer in charge of the works as per technical specification including cost of labour, hire charges etc,. complete. | 2,500 | RM | - | - |
| 3 | Clearing of chocked culverts across the existing road at different chainage including upstream side,barral portion, down stream side , cleaning , disposal of debris away from site ,all lead,lift etc complete. | 25 | Nos | - | - |
| 4 | Earth work excavation in hard stiff clay, stiff black cotton, hard red earth, shale, murram gravel, stoney earth & earth mixed with small size boulders and hard gravelly soil and depositing the earth in the places shown by the Engineer with initial lead of 10 M and initial lift of 2 m etc., complete,for culvert and retaining wall at approach road complying with standard specifications. | 2,220 | m3 | - | - |
| 5 | Refilling with earth including cost of all materials, labour, lead, lift etc., complete for building basement as per specification and as directed by the Engineer at site. | 125 | m3 | - | - |
| 6 | Providing and placing in position M10 grade (one cement, three sand, and six part of aggregate ) for culvert , retaining wall on the approach road and up stream side pitching using broken hard granite coarse aggregate (well graded) of nominal maximum size of 40mm and down graded to I.S specified grading and mixing the ingredients in approved mixer including placing in layers and vibrating, curing, finishing the surface with all leads and lifts, labour etc., complete as per the direction of the Engineer and complying with standard specifications. | 115 | m3 | - | - |
| 7 | Providing and placing in position M15 grade using broken hard granite coarse aggregate size of 20 mm and down graded for steps and name board post including, Shuttering Charges, placing in layers and vibrating, curing, finishing the surface with all leads and lifts, labour etc., complete as per the direction of the Engineer and complying with standard specifications. | 12 | m3 | - | - |
| 8 | Providing and placing in position M15 grade using broken hard granite coarse aggregate (well graded) of nominal maximum size of 40mm & 20 mm and down graded to I.S specified grading and mixing the ingredients in approved mixer including shuttering charges,placing in layers and vibrating, curing, finishing the surface with all leads and lifts, labour etc.,complete for protection wall on the approach road as per the direction of the Engineer and complying with standard specifications. | 435 | m3 | - | - |
| 9 | Filling the HBG 10mm to 40mm machine crushed metal for filling the filter material for Earth slip protection wall including cost of all materials transportation, consoliation, lead, lift, etc complete. | 310 | m3 | - | - |
| 10 | Providing and placing in position M20 grade for Protection wall & Column, Plinth beam, Lintel, sunshade, Beam, Roof slab, Precast slab for Guard room and control room using broken hard granite coarse aggregate (well graded) of nominal maximum size of 20mm downgraded to I.S specified grading and mixing the ingredients in approved mixer including placing in layers and vibrating, curing, finishing the surface with all leads and lifts, labour etc., complete but excluding cost of steel reinforcement as per the direction of the Engineer and complying with standard specifications. | 1 | m3 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
Specification06WCII.pdf
Tender Documents • 5.66 MB
BOQ_804138.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].