Loading…
Loading…
Tender Value
₹1.6 L
EMD Value
₹3,100
Closing Date
24 Jul 2026, 6:00 pm
XEW REW UDHAMPUR
XEW REW UDHAMPUR
boq
2026_RDPR_315420_58
e-NIT No. 31 REW UDHAMPUR of 2026-27 Dated 10-07-2026
Open Tender
Civil Works
60 days
Udhampur
nit
2 documents required · 2 mandatory
₹600
XEW REW UDHAMPUR
₹3,100
11 Jul 2026
11 Jul 2026
25 Jul 2026
11 Jul 2026
24 Jul 2026
11 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-ChargeAll kinds of soil. | 0.38 | cum | 592.9 | ₹225.3 |
| 2 | Earth Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.All kinds of soil. | 7.69 | cum | 479.3 | ₹3,685.82 |
| 3 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 0.7 | cum | 4,826.5 | ₹3,378.55 |
| 4 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. | 1.86 | cum | 5,733.6 | ₹10,664.5 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level1:1½:3 | 1.34 | cum | 7,788.4 | ₹10,436.46 |
| 6 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in:1cement : 6 coarse sand mortar. | 5.25 | cum | 7,571.55 | ₹39,750.64 |
| 7 | Extra for Brick work with with superstructure bricks of class designation 75 in foundation | 1.09 | cum | 1,455.65 | ₹1,586.66 |
| 8 | Distempering with dry distemper of approved brand and manufacture (two or more coats) and of required shade on new work, over and including water thinnable priming coat to give an even shade | 25.44 | sqm | 127.95 | ₹3,255.05 |
| 9 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete . | 50.67 | kg | 123.2 | ₹6,242.54 |
| 10 | Providing and laying Ceramic glazed floor tiles 300x300 mm (thickness to be specified by the manufacturers) of 1st quality conforming to IS: 15622 of approved make, laid on 20 mm thick bed of cement mortar 1: 4 ( 1 cement : 4 coarse sand) including pointing the joints with white cement and matching pigment etc., complete.
11.50.1 In colour such as White, Ivory, Grey, Fume Red Brown | 1.86 | sqm | 1,107.65 | ₹2,060.23 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
BOQ_1023177.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid