Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-Bid declaration not uploaded |
Tender Value
₹12 L
Closing Date
31 Jul 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE RnB Division Handwara
EE RnB Division Handwara
Improvement/Restoration of Sagipora Kulangam road by way of P/L WBM G-II, 75mm thick wet mix incl. 25mm thick semidense with 6mm seal coat in patches/stretches (Machine mix liad by paver)
2021_PWDJK_131810_1
ENIT NO 21_Handwara of 2021-22
Open Tender
Civil Works - Roads
Item Wise
7 days
Kulangam to Sagipora
Please refer Tender documents.
4 documents required · 4 mandatory
₹600
Yes
EE RnB Division Handwara
Exempted
31 Jul 2021
26 Jul 2021
31 Jul 2021
26 Jul 2021
31 Jul 2021
26 Jul 2021
90 days
Amount
P/L spreading compacting graded stone agg. To wet macadam specification incl. preparing the material with water at OMC in mechnical mix plant laying in uniform layers with paver in base cource on well prepared surface and compacting with vibrator roller to achieve the required grade and camber incl. carriage of all involved material to site of work complete (crusher got grom broken quarry metal grading 45mm to 22.4mm =30% 22.40mm to 2.36mm 40% , 2.36mm to 75mm =30% micron (a) 75mm thick
Providing and applying tack coat hot straight run bitumen of V-G 10 grade including heating the bitumen , spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler , cleaning and preparing the existing road surface as per specification including carriage of materials loading, unloading including all taxes involved on account of labour and material including Bitumen . WBM Surface
Providing and laying 25mm thick, semi dense asphaltic base course using mineral aggregate satisfying the gradation set out in specifications with 5 percent binder content (By weight of total mix) with the aid of hot mix plant and paver finisher including rolling with road roller of 8-10 tonne capacity to achieve required compaction and density including cost & carriage material and labour loading, unloading and all taxes involved on account of labour and material including bitumen
Providing and laying seal coat of premixed fine aggregate (passing 2.36mm and retained on 180 micron sieve) with bitumen using 128kg of bitumen of V.G -10 grade bitumen per cum of fine aggregate and 0.60cum of fine aggregate per 100 sqm of road surface including rolling and finishing with road all complete including cost and carriage of materials and labour , loading unloading and all taxes involved on account of labour and material including bitumen.
GH AHMAD GANAI
stage.html
html • 0.02 MB
finance_261921.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .