| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC ATAL CHOWK CHANWARIDAND MANENDRAGARH KOREA CHHATTISGARH | KOREA | CHHATTISGARH | 497442 | L1 | Accepted-AOC submitted loi | |
| 2 | L2₹3.6 L+₹40,301.72 (12.8%)Rejected-Finance BAZARPURA NOWROZABAD MADHYA PRADESH 484555 DIST UMARIA M P | NOWROZABAD | UMARIA | MADHYA PRADESH | 484555 | L2 | Rejected-Finance Not a Lowest Bidder | |
| 3 | L3₹4.0 L+₹80,310.80 (25.5%)Rejected-Finance | L3 | Rejected-Finance Not a Lowest Bidder |
Tender Value
₹4.9 L
EMD Value
₹6,200
Closing Date
8 Dec 2023, 5:00 pmClosed
Staff Officer EnM Johilla Area
Office of the AGM, Johilla Area EnM Department Noworozabad Distt Umaria MP 48455
Repairing/Rewinding of Two Nos. Power Transformers 2000KVA, 33KV/3.3KV, TFR-60 and 750KVA, 33KV/3.3KV, TFR-24 of NRZB and Pali Sub Area of Johilla Area.
2023_SECL_294804_1
SECL/JHL/SO(EnM)/23-24/232415 Dt 28.11.2023
Open Tender
Electrical and Maintenance Works
Item Rate
45 days
REGIONAL WORKSHOP JOHILLA AREA SECL
5 documents required · 5 mandatory
₹6,200
25 Jan 2024
29 Nov 2023
9 Dec 2023
29 Nov 2023
8 Dec 2023
29 Nov 2023
29 Nov 2023 - 5 Dec 2023
Amount
PART A : Details: Make- Crompton Greaves, 33KV/3.3KV, 2000KVA, 50C/S, Oil Cooled, Sr. No.-V7326/3, Local No.-TFR 60 of Noworzabad Sub Area.
Complete Repairing, rewinding, &Testing of Power Transformer by Replacement of all damaged Primary & Secondary winding and all Primary & secondary winding reinsulation of three Paper insulated as per original sample and size. Replacement of Gasket packing, insulating materials for overall insulation, dehumifying of core and coil assembly.Dismantaling, replacement of damaged parts i.e.Tab-changer insulators & Others and refitting including connection and filteration of Oil, cleaning and painting with single coat of primer and two Coats of approved make synthetic enamel paints.
a)Total Copper Winding Weight(Primary +secondary) = 945kg
b) Copper wire for Two Limbs of Primary core of transformer
c) Insulating Material and varnish for complete transofrmer
d) Labour Charges
e) Less Scrap Copper (60% of Sl. No. 1.3)
PART B: Details: Make- Archana Industries make, 33KV/3.3KV, 750KVA, 50C/S, Oil Cooled, Serial No. 249/01, Local No.-TFR 24 of Birsinghpur Old Mine Substation of Pali Sub Area.
Complete Repairing, rewinding, &Testing of Power Transformer by Replacement of all Primary & Secondary winding and all Primary & secondary winding reinsulation of three Paper insulated as per original sample and size. Replacement of Gasket packing, insulating materials for overall insulation, dehumifying of core and coil assembly.Dismantaling, replacement of damaged parts i.e.Tab-changer insulators & Others and refitting including connection and filteration of Oil, cleaning and painting with single coat of primer and two Coats of approved make synthetic enamel paints.
a)Total Copper Winding Weight(Primary +secondary) = 483kg
b) Copper wire for Primary core of transformer
c) Insulating Material and varnish for complete transofrmer
d) Labour Charges
e) Less Scrap Copper (60% of Sl. No. 2.3)
Total impact of GST for the purpose of CTC
SURESH ELECTRICALS
M/s. Sharma Engineering and Electrical Works
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_305343.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .