Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical ok |
| 2 | Accepted-Technical | Accepted-Technical ok |
| 3 | Accepted-Technical 310 311 PULIYA PASCHIM VIHAR 28 29 CHOWK FARIDABAD HARYANA 121001 | FARIDABAD | HARYANA | 121001 | Accepted-Technical ok |
| 4 | Accepted-Technical | Accepted-Technical ok |
| 5 | Accepted-Technical | Accepted-Technical ok |
Tender Value
₹40.8 L
EMD Value
₹81,520
Closing Date
7 Aug 2026, 5:00 pmClosed
Satish Kumar Vij
IDC Department SVSU
Parking Canopies
2026_HRY_537609_1
2026CE578291 159A 4BB8 A84B 4862842EEE4D1845SVS
Open Tender
Civil Works
Works
60 days
DUDHOLA
Parking Canopies
2 documents required · 2 mandatory
₹2,500
₹81,520
Yes
17 Aug 2026
30 Jul 2026
10 Aug 2026
30 Jul 2026
7 Aug 2026
30 Jul 2026
30 Jul 2026 - 1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [13.32]Providing and fixing bolts including nuts and washers complete. [Through Rate] | 1,934.8 | Kg. | 80 | ₹1,54,784 |
| 2 | [13.34]Supply and Fixing of Tensile Sheet Shed 650GSM sheet with M.S Iron pipe Frame Pole 125mm Heavy Truss M.S Pipe 60mm Heavy, Membrane M.S Pipe 50mm Heavy, Complete With cost of Painting and Labour for Fixing Paint Complete in all respects [Through Rate] | 762.52 | Sqm | 4,638 | ₹35,36,567.76 |
| 3 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] | 80.64 | cum | 78 | ₹6,289.92 |
| 4 | [4.32]Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. [Through Rate] | 51.98 | cum | 46 | ₹2,391.08 |
| 5 | [6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 23.63 | cum | 3,975 | ₹93,929.25 |
| 6 | [6.1.4]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 4. 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) [Through Rate] | 5.04 | cum | 2,911 | ₹14,671.44 |
| 7 | [6.29.1]Centering and shuttering including strutting, propping etc. and removal of form work for : 1. Foundations, footings, bases for columns [Through Rate] | 149.8 | Sqm | 155 | ₹23,219 |
| 8 | [6.36.1]Steel reinforcement for R.C.C. work ready to use `cut and bend` rebars of approved make from factory/workshop to construction site including placing in position and binding all complete above plinth level. 1. Thermo-Mechanically Treated bars of grade Fe-500D or more. [Through Rate] | 3,757.64 | Kg. | 65 | ₹2,44,246.6 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_616765.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .