Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-AOC BIRPARA JAN AUSHADI KENDRA SUBHASH PALLY | L1 | Accepted-AOC L1-Accepted | |
| 2 | L2₹10.2 L+₹28,802.94 (2.91%)Rejected-Finance COOCHBEHAR HAZRAPARA | JALPAIGURI | WEST BENGAL | 735122 | L2 | Rejected-Finance Higher than L1 | |
| 3 | L3₹10.3 L+₹40,587.62 (4.10%)Rejected-Finance COOCH BEHAR | COOCH BEHAR | COOCH BEHAR | WEST BENGAL | 736101 | L3 | Rejected-Finance Higher than L1 |
Tender Value
Refer Docs
EMD Value
₹20,600
Closing Date
22 Mar 2025, 4:30 pmClosed
EXECUTIVE ENGINEER, MALDA MECHANICAL DIVISION,PHED
Office of the Executive Engineer, Malda Mechanical Division, PHE Dte. Doulatpur PHE complex, P.O. Maliha, Dist. Malda, PIN 732102
Operation and guarding of 30 KVA, 35 KVA, 3 Phase sound proof Diesel Driven Generator set at RAIGANJ DIVISION PHE OFFICE CAMPUS located at raiganj in the district of Uttar Dinajpur under Malda Mechanical Division, PHE Dte.
2025_PHED_822181_1
WBPHED/EE/MLMD/NIeT_40 of 2024-2025
Open Tender
Electrical Work/ Equipment
Item Rate
306 days
Doulatpur PHE complex, P.O. Maliha, Dist. Malda
Please refer Tender documents.
4 documents required · 4 mandatory
₹20,600
Yes
26 Mar 2025
6 Mar 2025
24 Mar 2025
6 Mar 2025
22 Mar 2025
6 Mar 2025
Amount
Operation of 30 KVA & 35 KVA Diesel Generator Set by engaging skilled personnel having sufficient experience , as and when required as per direction including guarding of the Generator set round the clock. (This cost is excluding the cost of fuel & lubricant required.)
ESIC Contribution for Employers for Sl No. 1 @3.25%
EPF Contribution for Employers for Sl No. 1 @13% (For Establishment having 20 employees or more)
Supervision charges for electrical installation by licensed electrician as per IE Rules, 1956 read with latest amendments bearing valid workmanship permit and mechanic for diesel generator set with overhead expenditures as per specification and direction of E.I.C.
Consumption of diesel for silent type air cooled rebust canepy type 30 KVA & 35 KVA capacity DG set @ 5.5 Ltr./Hr. including all carriage & storage for average 1.5 hours run/day of each DG set as per direction. (Consumption of diesel oil has been taken as per actual measurement of logbook which value should not cross the scheduled quantity). 306 days X 1.5 X 2 Hours run/day.
Consumption of Mobil oil including all carriage & storage for the 30 KVA & 35 KVA DG set for 306 days X1.5 X 2 Hours run/day. (Consumption of diesel oil has been taken as per actual measurement of logbook which value should not cross the scheduled quantity).
Add Cess @ 1%
GEETA CONSTRUCTION (BID ID -6253616)
DIAMOND ELECTRICAL WORKS (BID ID -6253629)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .