Loading…
Loading…
Tender Value
₹97.6 L
EMD Value
₹98,000
Closing Date
7 Jul 2026, 3:00 pm
BDO(BP)
BDO, Office, P.N.Palayam
Construction of Primary Health Centre Additional Building at Karumandurai H/o C.K.Hills Vadakkunadu Panchayat in P.N.Palayam Block at Salem District -15th CFC (Health) (2023-2024) -2025-2026.
2026_RDTN_680759_1
Roc.No.1885/2025/A3
Open Tender
Civil Works - Buildings
270 days
BDO, Office, P.N.Palayam
As per tender document
3 documents required · 3 mandatory
₹0
₹98,000
13 Jun 2026
13 Jun 2026
7 Jul 2026
13 Jun 2026
7 Jul 2026
13 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Construction of Primary Health Sub Centre Additional Building @ Karumandurai H/0 C.K.Hills Vadakkunadu Panchayat in P.N.Palayam block at Salem District | - | - | - | - | - |
| 2 | Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. | 324.48 | Cum | - | - | - |
| 3 | Supplying and filling in foundations and Basement with filling sand in layers not exceeding 15 cm. thick, well watered ,rammed and consolidated etc. complete complying with standard specifications. | 63.35 | Cum | - | - | - |
| 4 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | 43.9 | Cum | - | - | - |
| 5 | Refilling the approved good quality earth in plinths, area development etc. wherever specified in layers is not exceeding 200 mm thick, with available earth at site. | 205.03 | Cum | - | - | - |
| 6 | Supplying and filling of conveyed Earth by lorry in basement filling including stacking for premeasurement, conveyance loading, and unloading charges and all other incidential charges and including filling laying watering and consolidating etc., complete | 28.06 | Cum | - | - | - |
| 7 | Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid). | - | - | - | - | - |
| 8 | Upto basement | 317.99 | sqm | - | - | - |
| 9 | Ground floor | 450.45 | sqm | - | - | - |
| 10 | Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade for reinforced cement ratio with plasticizer using 20mm and down concrete structural elements under controlled water graded machine broken granite stone jelly excluding the cost of centering and shuttering and reinforcement but including curing, fixing, fan clamps etc., as per standard specification and as directed by the depart- mental officers comple.-1m3 | - | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
01.pdf
Tender Documents • 1.89 MB
BOQ_818039.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid