Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 LAdmitted-Finance | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | S.Vasudevan Contractor L1 |
|---|---|---|---|---|
| 1.00 | Loading, Transporting and unloading of poles and associated materials from substore/vellore to Kilpallipet section work spot upto 8 kms | 15 | Per Pole | 825 ₹12,375 Lowest |
| 2.00 | Excavation and erection and fixing of line metarials of 8.0m pole | 13 | Per Pole | 1,400 ₹18,200 Lowest |
| 3.00 | Excavation and erection and fixing of line materials of 9.0m pole | 3 | Per Pole | 1,750 ₹5,250 Lowest |
| 4.00 | Excavation, erection of stay set complete for HT/LT pole | 12 | each | 1,000 ₹12,000 Lowest |
| 5.00 | Stringing of 7/2.50 AAAC size of conductor (circuit length as mentioned in sanction copy) | 2.57 | Per Km | 2,300 ₹5,913.3 Lowest |
| 6.00 | Stringing of 7/3.35 AAAC size of conductor (circuit length as mentioned in sanction copy) | 0.83 | Per Km | 2,800 ₹2,332.4 Lowest |
| 7.00 | Fixing of v x arm and HT TI Fitting | 2 | each | 450 ₹900 Lowest |
| 8.00 | Fixing of Tapping x arm Guarding x arm with line materials | 2 | each | 380 ₹760 Lowest |
| 9.00 | Fixing of single phase X Arm | 1 | each | 80 ₹80 Lowest |
| 10.00 | Fixing of 3 Phase cross arm with line materials | 13 | each | 240 ₹3,120 Lowest |
Tender Value
Refer Docs
Closing Date
24 Aug 2026, 2:00 pmClosed
EE Vellore
gandhi nagar katpadi
Works Contract for Extension of supply works in HTLT feeders for erection poles ,transporting of poles, paving HTLT Line in various work orders in respect of Assistant Engineer O M Kilpallipet section in AEE O m Sathumadurai Sub Division of Vello
2026_EB_693257_1
EEVLR025
Limited
Electrical Works
Works
180 days
Kilpallipet
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
2 Sept 2026
11 Aug 2026
25 Aug 2026
11 Aug 2026
24 Aug 2026
11 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Loading, Transporting and unloading of poles and associated materials from substore/vellore to Kilpallipet section work spot upto 8 kms | 15 | Per Pole | - | - |
| 2 | Excavation and erection and fixing of line metarials of 8.0m pole | 13 | Per Pole | - | - |
| 3 | Excavation and erection and fixing of line materials of 9.0m pole | 3 | Per Pole | - | - |
| 4 | Excavation, erection of stay set complete for HT/LT pole | 12 | each | - | - |
| 5 | Stringing of 7/2.50 AAAC size of conductor (circuit length as mentioned in sanction copy) | 2.57 | Per Km | - | - |
| 6 | Stringing of 7/3.35 AAAC size of conductor (circuit length as mentioned in sanction copy) | 0.83 | Per Km | - | - |
| 7 | Fixing of v x arm and HT TI Fitting | 2 | each | - | - |
| 8 | Fixing of Tapping x arm Guarding x arm with line materials | 2 | each | - | - |
| 9 | Fixing of single phase X Arm | 1 | each | - | - |
| 10 | Fixing of 3 Phase cross arm with line materials | 13 | each | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_833535.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .