Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Rejected-Technical NO 1 120 FIRST STREET SANIPOONDI VILLAGE TIRUVANNAMALAI TALUK DISTRICT TAMIL NADU 606 755 | TIRUVANNAMALAI | TIRUVANNAMALAI | TAMIL NADU | 606755 | Rejected-Technical Technically Rejected |
| 3 | Rejected-Technical | Rejected-Technical Technically Rejected |
Tender Value
Refer Docs
EMD Value
₹79,900
Closing Date
28 Aug 2024, 11:00 amClosed
Superintending Archaeologist
O/o The Superintending Archaeologist, Archaeological Survey of India, Chennai Circle
EXECUTION OF WORK FOR ANNUAL MAINTENANCE OF RANJANGUDI FORT, RANJANGUDI 2024-25
2024_ASI_820165_1
SOUT/CHEN/PUDU/14 R/18691405
Open Tender
Civil Works - Buildings
Works
120 days
As Per Tender Document
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹79,900
Yes
19 Sept 2024
6 Aug 2024
29 Aug 2024
6 Aug 2024
28 Aug 2024
6 Aug 2024
Amount
Provision for Clearing vegetation growth and other overgrowth of vegetation and small trees of girth above 30cm from fort wall/premises up to 3.00mt ht. including rooting out and removal of rubbish up to a distance of 150m outside the periphery of the area cleared etc. complete and including applicable taxes if any complete and as directed by the department officials. (Quantity may be varied as per site conditions). (Place: Moat area / Rampart area / Central Fort area.)
Provision for carefully patch de-plastering the dead / decayed lime mortar over the mosque wall surface located at top of hill etc., complete including cost, conveyance of all materials, labour charges, transportation of debris complete item of work as directed etc. complete and including applicable taxes if any complete and as directed by the department officials. (Quantity may be varied as per site conditions).
Provision for Plastering over the mosque (located at hill top) wall surface neatly using well grinded Lime mortar 1:2 including all adhesive materials etc., to an average 20mm thickness etc. complete and including applicable taxes if any complete and as directed by the department officials. (Quantity may be varied as per site conditions).
Provision for white washing (two coats) the mosque (located at hill top) wall surface and arch surface (inner and outer) with good quality of lime etc. complete and including applicable taxes if any complete and as directed by the department officials. (Quantity may be varied as per site conditions).
Provision for strengthening/pointing the walls left and right side of lower moat area and rampart area of left and right of main entrance of fort located at foot of hill to get elevation with lime mortar 1:2 etc. complete and including applicable taxes if any complete and as directed by the department officials. (Quantity may be varied as per site conditions).
Provision for earthwork excavation in hard soil to a depth of 0.10 metre at ramparts for strengthening, necessary lead and lift for conveying the earth 50mtrs to fill up the low lying area for laying concrete / strengthening the existing surface etc. complete and including applicable taxes if any complete and as directed by the department officials. (Quantity may be varied as per site conditions).
Provision for Laying course of concrete in Lime Mortar 1:2, 10cm thick using 20mm brick jelly machine mixed (1:2:4 ratio) as strengthening the surface to avoid the vegetation growth between main fortification wall and side of the rampart wall , including conveyance of all materials, labour charges, mixing, placing, and spreading, ramming, consolidation and proper curing etc. complete and including applicable taxes if any complete and as directed by the department officials. (Quantity may be varied as per site conditions).
Provision for earthwork excavation for pathway in hard soil (to a depth of 0.10 metre) from main entrance area to main fort for laying foundation concrete including necessary lead and lift for conveying the earth 50mtrs to fill up the low lying area etc. complete and including applicable taxes if any complete and as directed by the department officials. (Quantity may be varied as per site conditions).
Provision for laying pathway leading to main fort by using rubble stones of size L=0.23 to 0.30 and B=0.23 to 0.30, 230 mm thick (Approx) in Lime Mortar 1:2 after dressing and cutting and fixed to required level and slope for easy daring of rainwater and necessary pointing with lime mortar 1:2 etc. complete and including all types of conveyances, applicable taxes if any complete and as directed by the department officials. (Quantity may be varied as per site conditions).
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .