| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | ₹4.2 L | L1 | Accepted-AOC LESS |
| 2 | L2₹4.2 L+₹1,728.81 (0.41%)Rejected-AOC | ₹4.2 L+₹1,728.81 (0.41%) | L2 | Rejected-AOC ABOVE |
| Sl No | Description | Qty | Unit | M. DHANDAPANI L1 | POOJA ENGINEERING L2 |
|---|---|---|---|---|---|
| 1.00 | 1. Engaging JCB for Cleaning and Levelling the Site including all other labour charges etc Complete as per direction of the departmental officers. | 3 | Hrs | 950 ₹2,850 | 945 ₹2,835 Lowest |
| 2.00 | 2. Dismantling the damaged Reinforced Cement Concret slab as per the instruction of Departmental officers. Including all initial lead and other labour charges | 2 | m3 | 3,614 ₹7,215.35 | 3,600 ₹7,187.4 Lowest |
| 3.00 | 3. Desilting in the existing drain as per the direction of departmental officers etc. completed. | 22 | m3 | 103 ₹2,265.49 Lowest | 150 ₹3,299.25 |
| 4.00 | 4. Dismantling the damaged Cement Concret work as per the instruction of Departmental officers. Including all initial lead and other labour charges | 19 | m3 | 534 ₹10,146 Lowest | 545 ₹10,355 |
| 5.00 | 5. Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge. | 63.99 | m3 | 220 ₹14,078.9 Lowest | 225 ₹14,398.88 |
| 6.00 | 6. Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 9.5 | m3 | 6,550 ₹62,192.25 | 6,545 ₹62,144.78 Lowest |
| 7.00 | 7. Supplying and erecting Shuttering including necessary supports for plane surfaces such as Drain walls etc, using mild steel sheets of size 90x60Cm and BG 10 stiffened with welded mild steel angles for boarding supported by Casuarinas props at suitable intervals etc., complete complying with standard specification and as directed. | 171 | m2 | 534 ₹91,314 Lowest | 535 ₹91,485 |
| 8.00 | 8. Cement concrete 1:3:6 (one cement, three sand and six aggregate ) using 20mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 28.5 | m3 | 6,853 ₹1,95,310.5 | 6,850 ₹1,95,225 Lowest |
| 9.00 | 9. Plastering with cement mortar 1:5 mix 12 mm thick ( one cement five sand) per direction of departmental officers etc. completed. | 43 | m2 | 312 ₹13,416 | 311 ₹13,373 Lowest |
| 10.00 | 10. Conveying the excavated earth from the site to the distance of 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers. | 107 | m3 | 168 ₹17,976 Lowest | 170 ₹18,190 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
19 Dec 2025, 3:00 pmClosed
Assistant Commissioner
Coimbatore Corporation, Central zone, Hosur road, Coimbatore.641018.
Construction of Storm Water Drain at Murugan Nagar Extension in ward no 32 Central zone
2025_MAWS_631246_28
E5/2025-26/CZ
Open Tender
Civil Works
Item Rate
Central zone
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹5,000
Yes
29 Jul 2026
13 Dec 2025
19 Dec 2025
13 Dec 2025
19 Dec 2025
13 Dec 2025
1. Engaging JCB for Cleaning and Levelling the Site including all other labour charges etc Complete as per direction of the departmental officers.
2. Dismantling the damaged Reinforced Cement Concret slab as per the instruction of Departmental officers. Including all initial lead and other labour charges
3. Desilting in the existing drain as per the direction of departmental officers etc. completed.
4. Dismantling the damaged Cement Concret work as per the instruction of Departmental officers. Including all initial lead and other labour charges
5. Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge.
6. Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete.
7. Supplying and erecting Shuttering including necessary supports for plane surfaces such as Drain walls etc, using mild steel sheets of size 90x60Cm and BG 10 stiffened with welded mild steel angles for boarding supported by Casuarinas props at suitable intervals etc., complete complying with standard specification and as directed.
8. Cement concrete 1:3:6 (one cement, three sand and six aggregate ) using 20mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete.
9. Plastering with cement mortar 1:5 mix 12 mm thick ( one cement five sand) per direction of departmental officers etc. completed.
10. Conveying the excavated earth from the site to the distance of 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers.
Add :- GST @ 18%
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_755759.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
Tendernotice_2.pdf
PDF • 0.25 MB
BOQ_755759.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .