| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAdmitted-Finance | ₹1.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.0 Cr+₹9.4 L (4.83%)Admitted-Finance | ₹2.0 Cr+₹9.4 L (4.83%) | L2 | Admitted-Finance |
| 3 | L3₹2.5 Cr+₹51.9 L (26.7%)Admitted-Finance | ₹2.5 Cr+₹51.9 L (26.7%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Tender fee Not not paid in full |
| Sl No | Description | Qty | Unit | AJAY KAPOOR L1 | SNS TECHNOLOGIES L3 | M/s cee kay Traders L2 |
|---|---|---|---|---|---|---|
| 1.00 | Supply & Fixing of Gapless Surge arrestor 11 KV LA Set 9 KV, 10 KA with Polymer housing, Stn Type (3 Nos/Set) | 818 | Set | 7,000 ₹57,26,000 | 9,400 ₹76,89,200 | 6,850 ₹56,03,300 Lowest |
| 2.00 | Supply, Installation, Testing & Commissioning of 11 KV Horn Gap Set 3-Phase 200A | 818 | No | 4,200 ₹34,35,600 | 7,700 ₹62,98,600 | 3,850 ₹31,49,300 Lowest |
| 3.00 | Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body, G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts, refilled with earth enhancement materials and earth Chamber made of brick masonry with RCC slab cover. (3 Earthing/Substation) | 2,454 | No | 4,200 ₹1,03,06,800 Lowest | 4,350 ₹1,06,74,900 | 4,750 ₹1,16,56,500 |
Tender Value
₹2.2 Cr
EMD Value
₹4.4 L
Closing Date
19 Mar 2021, 4:00 pmClosed
Executive Engineer Electric Division Jammu
Office of the Executive Engineer Electric Division II JPDCL Jammu
Improvement of 25KVA, 63KVA, 100KVA, 250KVA, 400KVA and 630KVA Distribution Substations at different locations under the Jurisdiction of Sub-Division-IV Bishnah of Electric Division-II Jammu
2021_PDD_117960_1
Enit 92 of 2020-21 dated 23-02-2021
Open Tender
Electrical and Maintenance Works
Turn-key
90 days
Subdivision Bishnah
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
Executive Engineer ED-II
₹4.4 L
28 Mar 2021
24 Feb 2021
20 Mar 2021
24 Feb 2021
19 Mar 2021
24 Feb 2021
24 Feb 2021 - 16 Mar 2021
Amount
Supply & Fixing of Gapless Surge arrestor 11 KV LA Set 9 KV, 10 KA with Polymer housing, Stn Type (3 Nos/Set)
Supply, Installation, Testing & Commissioning of 11 KV Horn Gap Set 3-Phase 200A
Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body, G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts, refilled with earth enhancement materials and earth Chamber made of brick masonry with RCC slab cover. (3 Earthing/Substation)
M/s cee kay Traders
SNS TECHNOLOGIES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.05 MB
Tendernotice_2.pdf
PDF • 1.02 MB
BOQ_226373.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .