Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.7 CrAdmitted-Finance B 31 32 2ND FLOOR INDUSTRIAL ESTATE NEW POWER HOUSE ROAD JODHPUR 342003 RAJASTHAN | JODHPUR | RAJASTHAN | 342003 | ₹43.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹44.0 CrAdmitted-Finance | ₹44.0 Cr | L2 | Admitted-Finance |
| 3 | L3₹44.4 CrAdmitted-Finance | ₹44.4 Cr | L3 | Admitted-Finance |
| 4 | L4₹44.7 CrAdmitted-Finance | ₹44.7 Cr | L4 | Admitted-Finance |
| 5 | L5₹46.2 CrAdmitted-Finance | ₹46.2 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Unipro Techno Infrastructure Pvt Ltd L7 | OFFSHORE INFRASTRUCTURES LTD L2 | DARA ENGINEERING AND INFRASTRUCTURES PVT LTD L5 | VISHNU PRAKASH R PUNGLIA LTD L1 | BIHANI CONSTRUCTIONS PRIVATE LIMITED L3 | M/s DEVENDRA CONSTRUCTION CO. L4 | M/S gulab chand kumawat L8 | lahotybuildcon L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00INTAKE PUMPING STATION | |||||||||||
| 2.00 | Civil work required for installation of 1 no. of VT/Submersible Pump sets at existing intake well | 1 | Lot | 20,000 ₹20,000 | 63,211 ₹63,211 | 5,25,000 ₹5.3 L | 50,000 ₹50,000 | 3,00,000 ₹3 L | 15,00,000 ₹15 L | 3,50,000 ₹3.5 L | 44,00,000 ₹44 L |
| 3.00Providing, installation, testing, trial run and commissioning of the following, as per site condition & specifications given | |||||||||||
| 4.00 | 1 nos. Vertical turbine pump/Centrifugal Submersible with column pipes and other accessories 8.40 LPS/ 35 m head/ 05 KW | 2 | Nos | 5,00,000 ₹10 L | 2,83,338 ₹5.7 L | 6,25,000 ₹12.5 L | 5,00,000 ₹10 L | 4,00,000 ₹8 L | 15,00,000 ₹30 L | 4,50,000 ₹9 L | 3,14,643 ₹6.3 L |
| 5.00 | Variable frequency drive for above mentioned motors including control panel, contactors, starters, multi function meter, power factor control unit etc. | 1 | Lot | 4,50,000 ₹4.5 L | 1,05,154 ₹1.1 L | 3,25,000 ₹3.3 L | 1,50,000 ₹1.5 L | 8,00,000 ₹8 L | 10,00,000 ₹10 L | 90,000 ₹90,000 | 1,35,000 ₹1.4 L |
| 6.00 | Providing, installation, testing and commissioning of soft starters, for each pump-set, complete in all respect as per the scope of work & specifications. | 1 | Lot | 95,000 ₹95,000 | 1,05,154 ₹1.1 L | 3,25,000 ₹3.3 L | 1,50,000 ₹1.5 L | 2,50,000 ₹2.5 L | 10,00,000 ₹10 L | 1,50,000 ₹1.5 L | 72,000 ₹72,000 |
| 7.00 | Providing, installation, testing and commissioning of LT MCC with panels housing motor starters relays, MCB/MCCBs, bus-bar for all pump sets including all internal cabling and cable/bus-bar from switchyard, up to panels, etc, complete in all respect as per the scope of work & specifications . 10 KW | 1 | Lot | 3,50,000 ₹3.5 L | 3,35,295 ₹3.4 L | 2,95,000 ₹3.0 L | 1,00,000 ₹1 L | 3,00,000 ₹3 L | 10,00,000 ₹10 L | 1,25,000 ₹1.3 L | 3,06,000 ₹3.1 L |
| 8.00 | Providing, installation, testing and commissioning of capacitor control panels, housing power factor control system panel/capacitors (APFC Panel), other accessaries including all internal cabling and cable/bus-bar from switchyard, up to panels, etc, complete in all respect as per the scope of work & specifications. for 10 KW Panel | 1 | Lot | 1,90,000 ₹1.9 L | 1,61,531 ₹1.6 L | 8,25,000 ₹8.3 L | 75,000 ₹75,000 | 6,50,000 ₹6.5 L | 10,00,000 ₹10 L | 1,25,000 ₹1.3 L | 1,26,000 ₹1.3 L |
| 9.00 | Earthing system complete for LT equipments | 1 | Lot | 15,000 ₹15,000 | 1,01,406 ₹1.0 L | 1,25,000 ₹1.3 L | 15,000 ₹15,000 | 2,00,000 ₹2 L | 1,00,000 ₹1 L | 25,000 ₹25,000 | 35,000 ₹35,000 |
| 10.00MS Delivery Pipes piping (manifold) with all fittings such as flanges; bends; tees; and other specials; nut & bolts; gasket etc., for both pump | |||||||||||
Tender Value
₹47.7 Cr
EMD Value
₹95.3 L
Closing Date
3 Jun 2021, 6:00 pmClosed
ACE PHED Region-Kota Dadabari Kota
ACE PHED Region-Kota
Work of Augmentation cum Reorganization of Shaygarh Water Supply Project, Distt Baran, as per JJM guidelines including 10-year Operation and maintenance
2021_PHCJA_219045_1
NIT No 03/2021-22
Open Tender
Civil Works - Water Works
730 days
Baran
as per TD
2 documents required · 2 mandatory
₹20,000
Yes
EE PHED Project Baran
₹95.3 L
Yes
CE(SP)PHED Rajasthan
28 Jul 2021
9 Apr 2021
4 Jun 2021
9 Apr 2021
3 Jun 2021
9 Apr 2021
22 Apr 2021
Amount
INTAKE PUMPING STATION
Civil work required for installation of 1 no. of VT/Submersible Pump sets at existing intake well
Providing, installation, testing, trial run and commissioning of the following, as per site condition & specifications given
1 nos. Vertical turbine pump/Centrifugal Submersible with column pipes and other accessories 8.40 LPS/ 35 m head/ 05 KW
Variable frequency drive for above mentioned motors including control panel, contactors, starters, multi function meter, power factor control unit etc.
Providing, installation, testing and commissioning of soft starters, for each pump-set, complete in all respect as per the scope of work & specifications.
Providing, installation, testing and commissioning of LT MCC with panels housing motor starters relays, MCB/MCCBs, bus-bar for all pump sets including all internal cabling and cable/bus-bar from switchyard, up to panels, etc, complete in all respect as per the scope of work & specifications . 10 KW
Providing, installation, testing and commissioning of capacitor control panels, housing power factor control system panel/capacitors (APFC Panel), other accessaries including all internal cabling and cable/bus-bar from switchyard, up to panels, etc, complete in all respect as per the scope of work & specifications. for 10 KW Panel
Earthing system complete for LT equipments
MS Delivery Pipes piping (manifold) with all fittings such as flanges; bends; tees; and other specials; nut & bolts; gasket etc., for both pump
MS Pipe size 100mm
Electrically operated Sluice Valves on individual & common discharge piping; 100mm PN-1.6
Bellows type dismantling joints on individual & common discharge piping ; 100mm PN-1.6
EM flow meter, 100mm size
Electrically operated Butterfly Valves on individual piping of each pump ; 100mm, PN-1.6
Dual Plate type Check valve on individual piping of each pump ; 100mm, PN-1.6
Kinetic Air Valves of 80 mm diameter with isolating Sluice Valve , PN-1.6
Glycerine filled pressure gauge with all fittings
Other items & accessories not specified above but required to complete the work on turn key basis
WATER TREATMENT PLANT
Design, construction, execution, testing, commissioning & trial run of 1 MLD ( input capacity with maximum 3% losses) in 22 Hrs . Treatment Plant including all relevant civil, electrical and mechanical works, Stores, office along with ancillary civil works as per specifications and control system.
Inlet and Distribution System : Inlet chamber, Measuring channel, flash mixers, main channel to filter complex, by pass, walkways, stairs, railings
Equipment
Civil Works
Clariflocculators : Pipes between flash mixers and clariflocculators, clariflocculators, walkways, stairs, railings, clarified water channel to the main channel
Equipment
Civil Works
Filters and Filter House : Filters, all distribution channel, pipe gallery with clear water channel and sump, control gallery, observation platforms, walkways, stairs, railings, back wash water tank, clear water measuring channel, post chlorination tank & clear water channel up to CWR's.
Equipment
Civil Works
Administrative & Control Building : Administrative Control Building, backwash pumps, blowers, motor control centre, laboratory equipment, water cooler, furniture etc.
Equipment
Civil Works
Chemical House : Chemical house, alum & lime dosing equipment, piping to the injection point and injection devices
Equipment
Civil Works
Chlorine Building, Chlorination & Chlorine Storage : Chlorine storage area, chlorine building, chlorine tonners, chlorination equipments, injection devices.
Equipment
Civil Works
Recycling system : Recycle tank with all equipments, motor etc.
Equipment
Civil Works
Outdoor Piping
Equipment
Civil Works
Laboratory Equipments
Laboratory equipments as per clause 2.1.5 of Vol-II of Tender Document.
Furniture as per clause 2.1.6 of Vol-II of Tender Document
Ancillary Civil Works as per scope of work
Portable pH meter, Chlorine Sensor and turbidity meters, portable flow meter, one each in addition to laboratory equipments
Providing and installation of LT control panels, exhaust fans, cables, cable ducting, earthing, Lighting fixtures, lighting panels, sockets, receptacles, fans, etc. for all pumps of WTP complete in all respect in the outdoor areas of different Treatment plant units, the administration and control building, and other utility areas.
Other items & accessories not specified above but required to complete the work on turn key basis
CLEAR WATER RESERVOIR
Construction of RCC circular clear water reservoirs pf required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top roof slab/dome, 20 mm thick cement plaster with water proofing compound in CM 1:3 proportion and food grade epoxy paint to inner face of the container and dome/slab, DI double Flange Inlet/ Out Let/ Overflow/ Wash out pipes, Duck foot Bends, Puddle Collars, resileant seated sluice valves, Dismantling joint etc.,including refilling and disposing of surplus stuff, all labour and material charges , providing and fixing accessories such as M.S/Aluminium ladder/RCC stairs inside and outside, manhole frame and cover, puddle collar , ventilators, satisfactory hydraulic test and water tightness test as per IS code and providing three coats of cement paint to all exposed surface of structure including dome etc. complete in all respect as per design data criteria, obligatory requirements and detailed specifications, scope of work and GA drawing. The job include painting the name of scheme and other details on the reservoir and any other work related to structure as per the direction to Engineer-in-Charge technical specification and scope of work.The rate indicated below are excluding the cost of pipe, specials and valve required for inlet, outlet, washout, overflow arrangement :
At IPS Koyla, 250 KL
Other items & accessories not specified above but required to complete the work on turn key basis
CLEAR WATER PUMP HOUSE AT WTP
Extension of pump house at Shaygarh WTP Head work for Installation of 2W+2S Pumps : Civil work required for construction of pump foundation including required dismantling work. For replacement of 2W+2S pumps, 100 Sqm area
Providing, installation, testing, trial run and commissioning of the following, as per specifications
Centrifugal horizontal split casing pumps & motor all other accessories of following duty conditions
Majrawata Route (New additional pump) route 2.92 LPS / 45 m head/3.75 KW (1W+1S)
Koyla Route (Pump Replacement) route 5.68 LPS / 50 m head/05 KW (1W+1S)
MS suction pipes with all fittings such as flanges; bends; tees; and other specials; nut & bolts; gasket etc.-5mm thk
250 mm dia
125 mm dia
80 mm dia
MS discharge pipes with all fittings such as flanges; bends; tees; and other specials; nut & bolts; gasket etc.-5mm thk
125 mm dia
80 mm dia
MS common Delivery Pipes (manifold) with all fittings such as flanges; bends; tees; and other specials; nut & bolts; gasket etc. -5mm thk
80 mm dia
125 mm dia
Electrically operated Sluice Valves of on suction & common header piping of following sizes
Suction Header -80 mm
Suction Header -125 mm
Suction Header -150 mm
Bellows type dismantling joints on suction & common header piping of following sizes
Suction Header -80 mm
Suction Header -125 mm
Suction Header -150 mm
Electrically operated Sluice Valves of on individual & common delivery piping of following sizes
80 mm dia
125 mm dia
Bellows type dismantling joints of following sizes on individual & common delivery piping of following sizes
80 mm dia
125 mm dia
Electrically operated Butterfly Valves on individual & common delivery piping of following sizes
80 mm dia
125 mm dia
Dual Plate type Check valve of following sizes on individual & common delivery piping of following sizes
80 mm dia
125 mm dia
Kinetic Air Valves of 100 mm diameter with isolating Sluice Valve of 100 mm size
Glycerine filled pressure gauges
Providing, installation, testing, trial run and commissioning of the following, as per the specifications
Providing, installation, testing and commissioning of soft starters, for each pump-set, complete in all respect as per the scope of work & specifications.
Providing, installation, testing and commissioning of LT MCC with panels housing motor starters relays, MCB/MCCBs, bus-bar for all pump sets including all internal cabling and cable/bus-bar from switchyard, up to panels, etc, complete in all respect as per the scope of work & specifications .
Providing, installation, testing and commissioning of capacitor control panels, housing power factor control system panel/capacitors (APFC Panel), other accessaries including all internal cabling and cable/bus-bar from switchyard, up to panels, etc, complete in all respect as per the scope of work & specifications.
Earthing system complete for LT equipments
For LT Panet & motors for New Pump
Providing, installation, testing, trial run and commissioning of the following, as per specifications
Full Bore Electro magnetic Flow meter with suitable size by pass arrangement and associated pipes and specials etc, as per scope of work for following headworks
80 mm dia
125 mm dia
Manually operated Sluice Valves for flow meter arrangement :
80 mm dia
Bellows type dismantling joints on flow meter arrangement :
80 mm dia
Construction of Flow meter chamber
Other items & accessories not specified above but required to complete the work on turn key basis
CLEAR WATER PUMP HOUSE AT Koyla (Augmentation)
At Koyla IPS Head work for Installation of 4W+4S Pumps : Civil work required for construction of pump foundation including required dismantling work. For 02 new additional pumps, 100 Sqm
Providing, installation, testing, trial run and commissioning of the following, as per specifications
Centrifugal horizontal split casing pumps & motor all other accessories of following duty conditions
Bhatwara route (19.74 LPS, 115m, 37 KW)
Koyla & Rebarpura route (15.59 LPS, 45m, 15 KW)
MS suction pipes with all fittings such as flanges; bends; tees; and other specials; nut & bolts; gasket etc.-5mm thk, as per design/hydraulics
300mm Dia
250mm Dia
200mm Dia
150mm Dia
125mm Dia
100mm Dia
MS discharge pipes with all fittings such as flanges; bends; tees; and other specials; nut & bolts; gasket etc.-5mm thk, as per design/hydraulics
200mm Dia
100mm Dia
125mm Dia
80mm Dia
MS common Delivery Pipes (manifold) with all fittings such as flanges; bends; tees; and other specials; nut & bolts; gasket etc. -5mm thk
200mm Dia
100mm Dia
125mm Dia
80mm Dia
Electrically operated Sluice Valves of on suction & common header piping of following sizes
300mm Dia
250mm Dia
200mm Dia
150mm Dia
125mm Dia
100mm Dia
Bellows type dismantling joints on suction & common header piping of following sizes
300mm Dia
250mm Dia
200mm Dia
150mm Dia
125mm Dia
100mm Dia
Electrically operated Sluice Valves of on individual & common delivery piping of following sizes
200mm Dia
100nn Dia
125mm Dia
Bellows type dismantling joints of following sizes on individual & common delivery piping of following sizes
200mm Dia
100nn Dia
125mm Dia
Electrically operated Butterfly Valves on individual & common delivery piping of following sizes
200mm Dia
100nn Dia
125mm Dia
Dual Plate type Check valve of following sizes on individual & common delivery piping of following sizes
200mm Dia
100nn Dia
125mm Dia
Kinetic Air Valves of 100 mm diameter with isolating Sluice Valve of 100 mm size
Glycerine filled pressure gauges
Providing, installation, testing, trial run and commissioning of the following, as per the specifications
Providing, installation, testing and commissioning of soft starters, for each pump-set, complete in all respect as per the scope of work & specifications.
Providing, installation, testing and commissioning of LT MCC with panels housing motor starters relays, MCB/MCCBs, bus-bar for all pump sets including all internal cabling and cable/bus-bar from switchyard, up to panels, etc, complete in all respect as per the scope of work & specifications .
Providing, installation, testing and commissioning of capacitor control panels, housing power factor control system panel/capacitors (APFC Panel), other accessaries including all internal cabling and cable/bus-bar from switchyard, up to panels, etc, complete in all respect as per the scope of work & specifications.
Earthing system complete for LT equipments
For LT Panet & motors for New Pump
Providing, installation, testing, trial run and commissioning of the following, as per specifications
Full Bore Electro magnetic Flow meter with suitable size by pass arrangement and associated pipes and specials etc, as per scope of work for following headworks
200mm Dia
100nn Dia
125mm Dia
Manually operated Sluice Valves for flow meter arrangement :
200mm Dia
100nn Dia
125mm Dia
Bellows type dismantling joints on flow meter arrangement :
200mm Dia
100nn Dia
125mm Dia
Construction of Flow meter chamber
Extension of Chlorination system, Construction of shed and providing Post chlorination System comprising of Supply & installation of chlorine tonners (2 nos. @ 900 kg) with vaccum chlorinator 2 Nos. (1working+1 standby) comprising of chlorine solution-feeding unit, control panel, pipings, sensor for detecting leakages, booster pump, sprinkler system, injector module to suit the capacity of the chlorinator sprinkler system etc. complete in all respect as per the specification.
Other items & accessories not specified above but required to complete the work on turn key basis
CLEAR WATER RISING MAIN
Supply, Laying; jointing; sectional testing; and commissioning of DI (K-7) pipeline including the earthwork, bedding, sand bedding, construction of anchors; thrust blocks; cross walls; traverse block; pipe support structures; road crossing works; river crossing works; providing pitching & NP 3 pipes for scour valves; construction of ancillary structures; providing & installation of specials; clearing the site; disinfection etc. complete in all respect as per the specification. Work also included required earth work in all type of strata (trench excavation & refilling etc) dismantling of CC/ Bitumen/ Kharanja/ CC Block Roads etc and repairing the same as per scope & specification of work (Vol-II)
DI K-7 Pipe Line
100mm Dia
150mm Dia
200 mm Dia
Supply, Laying; jointing; sectional testing; and commissioning of MS pipeline including the earthwork, bedding, sand bedding, construction of anchors; thrust blocks; cross walls; traverse block; pipe support structures; road crossing works; river crossing works; providing pitching & NP 3 pipes for scour valves; construction of ancillary structures; providing & installation of specials; clearing the site; disinfection etc. complete in all respect as per the specification
100mm Dia
150mm Dia
200mm Dia
Supply & installation of Sluice Valves for scouring size
100mm Dia
Supply & installation of Air Valves size
Construction of air valve Pillars
Construction of scour valve chambers
Construction of Water Meter chambers
Construction of sluice valve chamber at Junction points
Construction of sectionalizing valve chamber as per design & drawings
Provision for CI Specials/ fittings in Sluice Valve Chambers/ offtake chambers, water meter chamber & section valve chamber
CI Fittings
Sluice Valves for Junction Chambers & Water Meter Chamber
100mm Dia
150mm Dia
200mm Dia
250mm Dia
Bellows Type Dismantling joint for Chambers & Sectionilizing valve
100mm Dia
150mm Dia
200mm Dia
250mm Dia
GSM Based Flow Meters
80mm Dia
Butterfly Valves as Sectionilizg Valves
100mm Dia
150mm Dia
Other items & accessories not specified above but required to complete the work on turn key basis
CLUSTER DISTRIBUTION PIPE LINE
Supply, Laying; jointing; sectional testing; and commissioning of DI (K-7) pipeline including the earthwork, bedding, sand bedding, construction of anchors; thrust blocks; cross walls; traverse block; pipe support structures; road crossing works; river crossing works; providing pitching & NP 3 pipes for scour valves; construction of ancillary structures; providing & installation of specials; clearing the site; disinfection etc. complete in all respect as per the specification. Work also included required earth work in all type of strata (trench excavation & refilling etc) dismantling of CC/ Bitumen/ Kharanja/ CC Block Roads etc and repairing the same as per scope & specification of work (Vol-II)
DI K-7 Pipe Line
250mm Dia
Supply, Laying; jointing; sectional testing; and commissioning of HDPE PE80/PN-6 including the earthwork, bedding, sand bedding, construction of anchors; thrust blocks; cross walls; traverse block; pipe support structures; road crossing works; river crossing works; providing pitching & NP 3 pipes for scour valves; construction of ancillary structures; providing & installation of specials; clearing the site; disinfection etc. complete in all respect as per the specification. Work also included required earth work in all type of strata (trench excavation & refilling etc) dismantling of CC/ Bitumen/ Kharanja/ CC Block Roada etc and repairing the same as per scope & specification of work (VOl-II)
HDPE PN-6 (Dia in mm)
Supply, Laying; jointing; sectional testing; and commissioning of MS pipeline including the earthwork, bedding, sand bedding, construction of anchors; thrust blocks; cross walls; traverse block; pipe support structures; road crossing works; river crossing works; providing pitching & NP 3 pipes for scour valves; construction of ancillary structures; providing & installation of specials; clearing the site; disinfection etc. complete in all respect as per the specification
80mm Dia
100mm Dia
150mm Dia
200mm Dia
Supply & installation of Air Valves size
Construction of air valve Pillars
Construction of sluice valve chamber at Junction points & Sectional Valve
Provision for CI Specials/ fittings in Sluice Valve Chambers at Junction Points, village transfer chambers etc.
CI Specials for Chambers
Sluice Valves
80mm Dia
100mm Dia
125mm Dia
150mm Dia
200mm Dia
Bellows Type Dismantling joint
80mm Dia
100mm Dia
125mm Dia
150mm Dia
200mm Dia
Other items & accessories not specified above but required to complete the work on turn key basis
VILLAGE DISTRIBUTION PIPE LINE
Supply, Laying; jointing; sectional testing; and commissioning of HDPE PE80/PN-6 including the earthwork, bedding, sand bedding, construction of anchors; thrust blocks; cross walls; traverse block; pipe support structures; road crossing works; river crossing works; providing pitching & NP 3 pipes for scour valves; construction of ancillary structures; providing & installation of specials; clearing the site; disinfection etc. complete in all respect as per the specification. Work also included required earth work in all type of strata (trench excavation & refilling etc) dismantling of CC/ Bitumen/ Kharanja/ CC Block Roads etc and repairing the same as per scope & specification of work (Vol-II)
HDPE PN-6 (Dia in mm)
Supply, Laying; jointing; sectional testing; and commissioning of MS pipeline including the earthwork, bedding, sand bedding, construction of anchors; thrust blocks; cross walls; traverse block; pipe support structures; road crossing works; river crossing works; providing pitching & NP 3 pipes for scour valves; construction of ancillary structures; providing & installation of specials; clearing the site; disinfection etc. complete in all respect as per the specification
80mm Dia
100mm Dia
150mm Dia
Provision for sluice valves, dismantling joints, spectials & fittings in village distribution system and piped scheme (complete)
80mm Dia
100mm Dia
150mm Dia
200mm Dia
Other items & accessories not specified above but required to complete the work on turn key basis
FUNCTIONAL HOUSE HOLD TAP CONNECTION
Providing service connections as per technical specifications & standards drawing as per relevant IS code (amended up to date) from all kind of water mains up to consumer meter/ premises (complete job). This job included digging out standard size of pits and trench for laying service line in all kind of soil including demolishing of cement concrete, WBM, Black top etc of all thickness. Cutting of CC road/ jhiri by using concrete cutter machine, depositing & refilling of jhiri with watering & ramming/ compacting in layers and disposal of surplus excavated soil as directed within a lead of 50 mtr, providing & fixing of all fittings dully approved in accordance with ISO/DTR 9080 as per specification for potable water including approved make of MS clamp with saddle piece gunmetal ferrule (ISI marked) gunmetal NRV (ISI marked), valve (IS 778) and specials with MDPE Pipe PE-80 PN-16 as per ISO 4427, with flushing, cleaning, disinfecting & testing of pipe line complete required for making of service connection complete in all respect including labour charges. The service line should be laid at least 45cm below ground level, except in case of concrete/ bituminous road where minimum depth shall be 20cm. For detail specification of MDPE pipes, please refer Technical specification. General specification of MDPE pipes shall be as under: • Raw material shall be virgin PE-80 blue compound and comply with the requirement of ISO/ Directive of Testing Material: 9080 with minimum required strength of 8 kg/sq.cm. • The raw material shall be food grade quality • Pressure rating shall be 16 Bar • The pipe shall bear ISO marking
Average length up to 05 meter, 20mm dia MDPE Pipe
Extra length of 20mm MDPE pipe including excavation, providing, laying & jointing for length of service line above 05 meter
Other items & accessories not specified above but required to complete the work on turn key basis
ELEVATED SERVICE RESERVOIRS
Construction of RCC INTZE type Over Head Service Resevoir of following capacity and staging consisting of excavation in all type of strata , RCC work, cement plaster with water proofing compound to the inner face of the container including refilling disposing off the surplus stuff , plinth protection , all labour and material charge including providing and fixing of accessories such as ladder , manhole frame and covers , water level indicator ( float type ) ventilator with SS screen , lightening arrestor , float valves , puddle collar , DI double Flange Inlet/ Out Let/ Overflow/ Wash out pipes, Duck foot Bends, Puddle Collars, resileant seated sluice valves, Dismantling joint etc., G.I. pipe railing around walk way and top dome , providing RCC staircase from 4.5 mtr height of ground level to top level , chambers for all valves , providing and applying three coats of cement paint to the external surface of container , food grade epoxy paint to internal surface and giving satisfactory hydraulic test and water tightnees test as per I.S. code , etc. complete in all respect ae per design data , criteria , obligatory requirements and detailed specifications , scope of work and GA drawing. The job includes painting the name of the scheme and other details on the reservoir , providing aluminium portable ladder suitable to reach at height of 4.5 Mtr and any other work related to structure as per the directions of Engineer -in-charge , Technical Specification and Scope of work.
Other items & accessories not specified above but required to complete the work on turn key basis
Ancillary Civil Works
To Plan, Design, Construct and finish the following as per specifications as per detail given in Annexures.
Construction of Boundary wall, at 8 No ESR sites (30x30M) Plot alrea
Installation of MS Gates at Head Works & ESR sites : 1 at Each ESR site (8No, as per drawing)
RCC approach road in campuses
Other items & accessories not specified above but required to complete the work on turn key basis
11/0.44 KV POWER SYSTEM
66.10.2 Supply, Installation, Testing and commissioning of copper wound ISI marked Transformer 11/0.433 KV, Three Phase, 50 Hz, DYN 11, ONAN type , Standard accessories like, conservator, Silicagel breather,radiator,fins,HT<cableendboxesorBusDuctflange, Lifting lugs, Bi-directional Plain/ Flanged Rollers,Earthing terminal,Air relaese plug.Off load tap changer (+5% to -10% in steps of 2.5%), winding / Top oil temperature rise of 45°C/40°C, ISI marked drain valves, Dial type temperature gauge, first fill oil, Epoxy based paint etc having max. total losses as per energy efficiency level-2atbasicInsulationlevelconformingtoIS2026(Part-Ito Part - II), latest ammended and IS 1180 Part-I : 2014 BEE starlevel -IasperGovt.ofIndia,MinistryofpowernotificationDated16th
At Intake ~ 160 KVA
At Shaygarh WTP ~ 400 KVA
At Koyla IPS ~ 200 KVA
Supplying of following size of XLPE insulated and PVC outer sheathed aluminium conductor armoured UG cable of 1.1 KV grade confirming to IS:7098 (Part-I) 1988 with upto date amendments complete as required. 3.5 x 185 Sq.mm
Earthing with G.I. earth pipe 4.5 metre long, 40 mm dia including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc. with charcoal/ coke and salt as required.
Supplying and laying 25 mm X 5 mm G.I strip at 0.50 metre below ground as strip earth electrode, including connection/ terminating with G.I. nut, bolt, spring, washer etc. as required. (Jointing shall be done by overlapping and with 2 sets of G.I. nut bolt & spring washer spaced at 50mm)
Providing and fixing 25 mm X 5 mm copper strip in 40 mm dia G.I. pipe FRLSom earth electrode including connection with brass nut, bolt, spring, washer excavation and re-filling etc. as required.
Necessary modifications in existing GSS (breakers, DOF/Isolators/CT/PT etc)
Other items & accessories not specified above but required to complete the work on turn key basis
PLC-SCADA SYSTEM
Providing, installation, testing, trial run and commissioning of the PLC/ SCADA System , as per the scope of work & specifications given, to the complete satisfaction of Engineer in Charge:
Providing furniture and other required accessories at Master Control Centre at WTP Head Works as per scope of work,
Construction of the building suitable to accommodate the Master Control Centre equipment Minimum 30 Sqm at WTP head Work.
Other items & accessories not specified above but required to complete the work on turn key basis
MISCELLANIOUS ITEMS
Provision for Megha Highway Crossing by trenchless technology including cost deposited to conceren department
Provision for Major Canal Crossing by trenchless technology including charges to be deposited to concern authorities
Supply of Mechanical & Electrical & instrumentation spare parts
Supply of pipe line spare parts
Supply of tools & tackles
PRICE BREAK UP SCHEDULE: B
For 10 Year O & M
Cost for Basic Service Charges, including all chemicals required, to treat water at WTP/IPS, Administration and Management, Running of Office, Staff Quarters, Work Shops, Garage, Comprehensive Operation, Maintenance and Repairs including Preventive Maintenance, Cost of Lubricants, Consumables, Spare, tools, tackles as per Scope of Work & terms & conditions of contract. After execution of the project and issuance of completion certificate as per relevant clause in Vol-1, Defect Liability Period shall be of 12 months. During Defect liability period O&M shall be done by contractor for which no payment shall be made separately. O&M period shall commence after expiry of 1 year defect liability period.
For Year 1 of O&M
For Year 2 of O&M
For Year 3 of O&M
For Year 4 of O&M
For Year 5 of O&M
For Year 6 of O&M
For Year 7 of O&M
For Year 8 of O&M
For Year 9 of O&M
For Year 10 of O&M
OFFSHORE INFRASTRUCTURES LTD
BIHANI CONSTRUCTIONS PRIVATE LIMITED
M/s DEVENDRA CONSTRUCTION CO.
DARA ENGINEERING AND INFRASTRUCTURES PVT LTD
lahotybuildcon
Unipro Techno Infrastructure Pvt Ltd
M/S gulab chand kumawat
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.90 MB
TD3.pdf
Tender Documents • 20.75 MB
BOQ_390273.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid