| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC 609 702 | NAGAPATTINAM | TAMIL NADU | 609702 | ₹1.2 Cr | L1 | Accepted-AOC Least Rate Quoted Bid Accepted |
| 2 | L2₹1.2 Cr+₹1.1 L (0.91%)Rejected-AOC | ₹1.2 Cr+₹1.1 L (0.91%) | L2 | Rejected-AOC High Rate Quoted The Bidder Rejected |
| 3 | Not Admitted-Fee/PreQual/Technical 4 6 1 KALABAIRAVANKADU AYAKKARANBULAM II VEDHARANYAM TALUK NAGAPATTINAM DISTRICT 614707 | AYAKKARANBULAM | NAGAPATTINAM | TAMIL NADU | 614707 | - | - | Not Admitted-Fee/PreQual/Technical EMD Not Matching |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
5 May 2023, 3:00 pmClosed
Additional Collectot Dev
DRDA, Collectorate Campus, Nagapattianm
Stregthenning of 3 Roads at Vedaranyam Block Package No 34 Under MGSMT
2023_RDTN_301461_1
MGSMT/Tender/2023/NGT/Pkg-34
Open Tender
Civil Works
Item Rate
90 days
Vedaranyam Block
As per the Technical Bid
8 documents required · 8 mandatory
₹0
₹1.2 L
DRDA, Collectorate Campus, Nagapattianm
18 Jul 2023
12 Apr 2023
5 May 2023
12 Apr 2023
5 May 2023
12 Apr 2023
12 Apr 2023 - 28 Apr 2023
27 Apr 2023
Amount
01. Stregthening of Vanduvancherry - Vellikidangu Pashathotta salai KM 0/0-1/0 at Vedaranyam Block
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Picking the existing damaged bt surface including all labour cost etc complete
Providing and laying 75mm compacted thick WBM Gr. II using 1 cum of 90mm to 22.4mm IRC metal and 0.24 cum of Gravel blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurring rolling and consolidation by power roller and finishing has per MORD 405 including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefore and all other incidental charges etc., complete for bottom layer.
Providing and laying 75mm compacted thick WBM Gr.III using 1 cum of 63mm to 11.20mm IRC metal and 0.24 cum of Gravel blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurring rolling and consolidation by power roller and finishing has per MORD 405 including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefore and all other incidental charges etc., complete for top layer.
Providing and laying Prime coat Using Emulsion at the Rate of 7.00 Kg of 10 Sq.Mtr over the WMM Surface Prepratory to another Bitumenous Construction Over it
Providing and laying tack coat over the WBM surface using 2.5 Kg of bituminous emulsion for 10 sqm. Including cost of bituminous emulsion including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MORD specification.
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and laying gravel to 100 mm thick Including cost & conveyance of gravel from approved sources to work site and stacking on road side to departmental metric gauge for pre measurements as directed including labour for spreading and compacting etc., complete as per MORD specifications No. 400 (Side berms)
Provision for painting the centre and edge line with Thermo elastic paint including all labour charges etc complete
Provision for HM Stones
Provision for KM Stones
Provision for Name board Charges
Provision for Photo Charges
Provision for Sign board Charges
1 st year Maintenance
II nd year Manitenence
III rd Year Maintenance
IV th Year Maintenance
Vth year Maintenance
02. Stregthening of Ayakkaranpulam - 3 Kaikatti Sanisandhai Salai KM 0/0-1/080 at Vedaranyam Block
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Picking the existing damaged bt surface including all labour cost etc complete
Providing and laying 75mm compacted thick WBM Gr. II using 1 cum of 90mm to 22.4mm IRC metal and 0.24 cum of Gravel blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurring rolling and consolidation by power roller and finishing has per MORD 405 including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefore and all other incidental charges etc., complete for bottom layer.
Providing and laying 75mm compacted thick WBM Gr.III using 1 cum of 63mm to 11.20mm IRC metal and 0.24 cum of Gravel blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurring rolling and consolidation by power roller and finishing has per MORD 405 including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefore and all other incidental charges etc., complete for top layer.
Providing and laying Prime coat Using Emulsion at the Rate of 7.00 Kg of 10 Sq.Mtr over the WMM Surface Prepratory to another Bitumenous Construction Over it
Providing and laying tack coat over the WBM surface using 2.50 Kg of bituminous emulsion for 10 sqm. Including cost of bituminous emulsion including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MORD specification.
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and laying gravel to 100 mm thick Including cost & conveyance of gravel from approved sources to work site and stacking on road side to departmental metric gauge for pre measurements as directed including labour for spreading and compacting etc., complete as per MORD specifications No. 400 (Side berms)
Provision for painting the centre and edge line with Thermo elastic paint including all labour charges etc complete
Provision for HM Stones
Provision for KM Stones
Provision for Name board Charges
Provision for Photo Charges
Provision for Sign board Charges
Provision for Speed Breaker
1 st year Maintenance
II nd year Manitenence
III rd Year Maintenance
IV th Year Maintenance
Vth year Maintenance
03. Stregthening of Kuravapulam Therkkukadu - Sella thevan kadu salai KM 0/0-1/050 at Vedaranyam Block
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Picking the existing damaged bt surface including all labour cost etc complete
Providing and laying 75mm compacted thick WBM Gr.III using 1 cum of 63mm to 11.20mm IRC metal and 0.24 cum of Gravel blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurring rolling and consolidation by power roller and finishing has per MORD 405 including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefore and all other incidental charges etc., complete for top layer.
Providing and laying Prime coat Using Emulsion at the Rate of 7.00 Kg of 10 Sq.Mtr over the WMM Surface Prepratory to another Bitumenous Construction Over it
Providing and laying tack coat over the WBM surface using 2.50 Kg of bituminous emulsion for 10 sqm. Including cost of bituminous emulsion including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MORD specification.
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and laying gravel to 100 mm thick Including cost & conveyance of gravel from approved sources to work site and stacking on road side to departmental metric gauge for pre measurements as directed including labour for spreading and compacting etc., complete as per MORD specifications No. 400 (Side berms)
Provision for painting the centre and edge line with Thermo elastic paint including all labour charges etc complete
Provision for HM Stones
Provision for KM Stones
Provision for Name board Charges
Provision for Photo Charges
Provision for Sign board Charges
Provision for Speed Breaker
1 st year Maintenance
II nd year Manitenence
III rd Year Maintenance
IV th Year Maintenance
Vth year Maintenance
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SHREE ANANDHA KAMATCHI CONTRACTORS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .