| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.3 L+₹12,232.60 (3.81%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MMM ENTERPRISES | MSC ENTERPRISES |
|---|---|---|---|---|---|
| 1.00 | Dismantling the existing damaged RCC for the required width & depth as per the instructions of engineer in charge and disposing the debris 1km away from the site including cost of all materials, labours, lead, lift, curing, etc. complete. | 0.6 | M3 | 317.4 ₹374.53 Lowest | 329.4 ₹388.69 |
| 2.00 | Dismantling the damaged Terrace tiles and disposed away from the site as directed by the engineer in charge including cost of labour, Lead lift, T&P, etc., complete. | 40.6 | M2 | 2,070.6 ₹2,443.31 Lowest | 2,151.8 ₹2,539.12 |
| 3.00 | Providing PCC 1:2:4 using OP cement with 40mm size machine crushed HBG metal including cost of all material labour, lead, lift, etc., complete. | 0.5 | M3 | 3,377 ₹3,984.86 Lowest | 3,505.5 ₹4,136.49 |
| 4.00 | Providing shuttering arrangements for placing concrete using steel members and wooden props including cost of all materials, labour, lead, lift etc., complete. | 91.6 | M2 | 49,372.4 ₹58,259.43 Lowest | 51,296 ₹60,529.28 |
| 5.00 | Providing PCC 1:3:6 using OP cement with 20mm size machine crushed HBG metal including cost of all material labour, lead, lift, etc., complete. | 3.6 | M3 | 24,631.2 ₹29,064.82 Lowest | 25,567.2 ₹30,169.3 |
| 6.00 | Providing RCC 1:11/2:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work. | 4.3 | M3 | 42,711.9 ₹50,400.04 Lowest | 44,337.3 ₹52,318.01 |
| 7.00 | Supplying & providing RTS/MS rod including cutting, bending, tying and fixing in position as per specification including binding wires, cost of all materials, labours, lead, lift, etc. complete. | 258 | Kg | 24,768 ₹29,226.24 Lowest | 25,800 ₹30,444 |
| 8.00 | Brick work in CM 1:5 using fly ash bricks (230 x 110 x 70mm) including cost of all materials, Labours, lead, curing, etc. complete | 1.6 | M3 | 10,865.6 ₹12,821.41 Lowest | 11,278.4 ₹13,308.51 |
| 9.00 | Providing Terrace tiles of single 230 x 230 x 20mm tiles using CM 1:3, mixed with crude oil 1% by weight of cement and pointing with same oiled mortar etc, including cost of all materials, lead, labours, lift curing etc., complete. | 40.6 | M2 | 60,250.4 ₹71,095.47 Lowest | 62,524 ₹73,778.32 |
| 10.00 | Plastering with CM 1:5, 12mm thick for brick wall surface including cost of all materials, labours, lead, lift, curing, etc., complete. | 27.6 | M2 | 8,169.6 ₹9,640.13 Lowest | 8,473.2 ₹9,998.38 |
Tender Value
Refer Docs
EMD Value
₹3,400
Closing Date
29 Aug 2025, 2:00 pmClosed
CE TTPS Thoothukudi
Office of the SE Civil TTPS Thoothukudi
Repair and Maintenance Works to the Terrace Tiles of GLR 1 Pump House and PCC Wall for the Chain Link Fencing around GLR 1 at Camp 2 Analmin Nagar
2025_EB_592034_1
CE SE C TTPS 211 2025 26
Open Tender
Civil Works - Others
Item Rate
60 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,400
Yes
11 Nov 2025
12 Aug 2025
30 Aug 2025
12 Aug 2025
29 Aug 2025
12 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .