Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹84.3 LAdmitted-Finance | ₹84.3 L | L1 | Admitted-Finance |
| 2 | L2₹84.8 L+₹47,074.50 (0.56%)Admitted-Finance | ₹84.8 L+₹47,074.50 (0.56%) | L2 | Admitted-Finance |
| 3 | L3₹85.7 L+₹1.4 L (1.63%)Admitted-Finance | ₹85.7 L+₹1.4 L (1.63%) | L3 | Admitted-Finance |
| 4 | L4₹87.8 L+₹3.5 L (4.12%)Admitted-Finance JAGATSINGHPUR ODISHA 754142 | JAGATSINGHAPUR | ODISHA | 754142 | ₹87.8 L+₹3.5 L (4.12%) | L4 | Admitted-Finance |
| 5 | L5₹88.2 L+₹3.9 L (4.68%)Admitted-Finance | ₹88.2 L+₹3.9 L (4.68%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | BIKRAM KESHARI ROUTARAY L4 | SUSANTA KUMAR SWAIN L11 | SM ENTERPRISES L5 | Ms Gangadhar Jena L17 | Skater Infratech India Pvt. Ltd. L7 | Harihar Nayak L15 | MAA DAKHINAKALI ENTERPRISERS L1 | Bidyadhar Swain L14 | Manoj Kumar Nayak L18 | NIRANJAN SAHOO L12 | M/S.RAMESH CHANDRA MOHANTY L13 | Aakar Engineers and Contractors L22 | Nilamani Swain L6 | Padmanav Lenka L3 | M/S JAYADEV BEHERA L19 | M/s RAVI REALCONS PRIVATE LIMITED L21 | Anuja Mohapatra L9 | M/S SAVITA SINGH L20 | LAXMI ENTERPRISES L2 | PRAHALLAD CHANDRA SWAIN L16 | M/S JAY JAGANNATH ENTERPRISES L8 | Bijaya Kumar Jena L10 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Dismantling & removing the old damaged following item of works as per the requirement at site including scaffolding, disposing the same at specified place with in all leads and lifts including supplying of all labours, T&P etc all complete as per the direction of Engineer-in-charge. (Excludicng cost of GST) | |||||||||||||||||||||||||
| 1.10 | RCC | 5 | Each cum | 600 ₹3,000 | 840 ₹4,200 | 150 ₹750 | 800 ₹4,000 | 500 ₹2,500 | 5 ₹25 Lowest | 700 ₹3,500 | 800 ₹4,000 | 1,500 ₹7,500 | 800 ₹4,000 | 1,000 ₹5,000 | 1,600 ₹8,000 | 700 ₹3,500 | 500 ₹2,500 | 1,350 ₹6,750 | 1,800 ₹9,000 | 1,400 ₹7,000 | 2,500 ₹12,500 | 3,000 ₹15,000 | 148 ₹740 | 1,110 ₹5,550 | 650 ₹3,250 |
| 1.20 | Brick work | 5 | Each cum | 200 ₹1,000 | 540 ₹2,700 | 150 ₹750 | 500 ₹2,500 | 100 ₹500 | 5 ₹25 Lowest | 300 ₹1,500 | 400 ₹2,000 | 800 ₹4,000 | 400 ₹2,000 | 200 ₹1,000 | 850 ₹4,250 | 300 ₹1,500 | 500 ₹2,500 | 1,260 ₹6,300 | 1,200 ₹6,000 | 800 ₹4,000 | 2,000 ₹10,000 | 450 ₹2,250 | 88 ₹440 | 1,036 ₹5,180 | 450 ₹2,250 |
| 2.00 | Earth work in excavation in all kinds of soil with initial lead & lift with dressing, leveling & compacting the foundation bed, breaking the clods to maximum 5cm to 7cm, disposing the material at a designated place and keeping the required quantities for back filling with cost of labour, T&P, tollage,transportation, loading at one end & unloading at other end, all taxes, excluding GST all complete as per the direction of Engineer-in-charge. | 1,432.5 | Each cum | 130 ₹1,86,225 | 198 ₹2,83,635 | 50 ₹71,625 Lowest | 150 ₹2,14,875 | 80 ₹1,14,600 | 100 ₹1,43,250 | 135 ₹1,93,387.5 | 150 ₹2,14,875 | 150 ₹2,14,875 | 125 ₹1,79,062.5 | 250 ₹3,58,125 | 160 ₹2,29,200 | 120 ₹1,71,900 | 150 ₹2,14,875 | 198 ₹2,83,635 | 150 ₹2,14,875 | 74 ₹1,06,005 | 250 ₹3,58,125 | 100 ₹1,43,250 | 208 ₹2,97,960 | 162.8 ₹2,33,211 | 220 ₹3,15,150 |
| 3.00 | Saline Sand filling at required locations including watering & ramming in layer not exceeding 300mm. Including cost of all materials, labour,T&P, transportation charges, royalties, taxes, etc. all complete as per direction of Engineer-in-charge but excluding GST. NB: 10.00% voids will be deducted from actual measurment at site to achieve the payabe quantity. | 403.2 | Each cum | 200 ₹80,640 | 248 ₹99,993.6 | 180 ₹72,576 Lowest | 300 ₹1,20,960 | 240 ₹96,768 | 200 ₹80,640 | 240 ₹96,768 | 200 ₹80,640 | 300 ₹1,20,960 | 200 ₹80,640 | 440 ₹1,77,408 | 950 ₹3,83,040 | 200 ₹80,640 | 340 ₹1,37,088 | 405 ₹1,63,296 | 300 ₹1,20,960 | 730 ₹2,94,336 | 3,200 ₹12,90,240 | 500 ₹2,01,600 | 367 ₹1,47,974.4 | 333 ₹1,34,265.6 | 700 ₹2,82,240 |
| 4.00 | P.C.C(1:3:6) of using 20 mm. & down C.B.G chips of approved quality infoundation & plinth including mixing hoisting, laying to proper level &slope compacting, curing, watering charges etc. complete including cost& supply of all materials, labour, T&P, taxes, etc. complete but excluding cost of GST as directed by Engineer-in-charge | 160 | Each cum | 4,000 ₹6,40,000 | 4,200 ₹6,72,000 | 3,200 ₹5,12,000 | 3,500 ₹5,60,000 | 3,089 ₹4,94,240 | 3,900 ₹6,24,000 | 3,000 ₹4,80,000 | 3,800 ₹6,08,000 | 4,500 ₹7,20,000 | 3,800 ₹6,08,000 | 4,200 ₹6,72,000 | 5,800 ₹9,28,000 | 3,900 ₹6,24,000 | 4,000 ₹6,40,000 | 5,130 ₹8,20,800 | 6,000 ₹9,60,000 | 4,000 ₹6,40,000 | 3,000 ₹4,80,000 | 800 ₹1,28,000 Lowest | 4,690 ₹7,50,400 | 4,218 ₹6,74,880 | 5,100 ₹8,16,000 |
| 5.00 | Reinforced Cement concrete (1:1.5:3) using 12mm to 20mm size C.B.G. chipsforall floors, foundation & plinth etc. of approved quality mixing,hoisting,laying, compacting, curing with cost and supply ofallmaterials, labour,T&P, taxes, tollage, royalties, etc. all complete but excluding GST as directed by Engineer-in-charge. | 622.43 | Each cum | 5,200 ₹32,36,636 | 5,800 ₹36,10,094 | 6,000 ₹37,34,580 | 6,200 ₹38,59,066 | 5,589 ₹34,78,761.27 | 6,000 ₹37,34,580 | 5,000 ₹31,12,150 | 5,300 ₹32,98,879 | 7,500 ₹46,68,225 | 5,300 ₹32,98,879 | 5,800 ₹36,10,094 | 7,200 ₹44,81,496 | 5,200 ₹32,36,636 | 5,350 ₹33,30,000.5 | 6,300 ₹39,21,309 | 7,400 ₹46,05,982 | 5,200 ₹32,36,636 | 6,200 ₹38,59,066 | 4,100 ₹25,51,963 Lowest | 5,625 ₹35,01,168.75 | 5,180 ₹32,24,187.4 | 6,170 ₹38,40,393.1 |
| 6.00Providing rigid smooth leak proof centering & shuttering made of steel/ply, plank of approved quality for R.C.C. structures and deshuttering and removing the same after due period with supply of all materials, labour, T&P, taxes, royalties, tollage, etc. all complete but excluding GST as directed by Engineer-in-charge. | |||||||||||||||||||||||||
| 6.10 | R.C.C. foundation and footing bases of columns mass concrete & precast
slab etc. | 696.2 | Each sqm | 200 ₹1,39,240 | 290 ₹2,01,898 | 150 ₹1,04,430 | 105 ₹73,101 | 100 ₹69,620 | 100 ₹69,620 | 95 ₹66,139 | 400 ₹2,78,480 | 350 ₹2,43,670 | 350 ₹2,43,670 | 150 ₹1,04,430 | 400 ₹2,78,480 | 250 ₹1,74,050 | 150 ₹1,04,430 | 99 ₹68,923.8 | 300 ₹2,08,860 | 400 ₹2,78,480 | 1,500 ₹10,44,300 | 430 ₹2,99,366 | 92 ₹64,050.4 | 81.4 ₹56,670.68 Lowest | 306 ₹2,13,037.2 |
| 6.20 | RCC wall & fins | 3,660 | Each sqm | 250 ₹9,15,000 Lowest | 328 ₹12,00,480 | 375 ₹13,72,500 | 600 ₹21,96,000 | 420 ₹15,37,200 | 550 ₹20,13,000 | 385 ₹14,09,100 | 520 ₹19,03,200 | 350 ₹12,81,000 | 470 ₹17,20,200 | 400 ₹14,64,000 | 600 ₹21,96,000 | 350 ₹12,81,000 | 250 ₹9,15,000 Lowest | 720 ₹26,35,200 | 500 ₹18,30,000 | 450 ₹16,47,000 | 250 ₹9,15,000 Lowest | 420 ₹15,37,200 | 624 ₹22,83,840 | 592 ₹21,66,720 | 409 ₹14,96,940 |
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
25 Sept 2024, 6:00 pmClosed
G D SETHY, EE, R AND B, PPA
G D SETHY, EE, R AND B, PPA
Construction of RCC drain in front of MV-01 qtrs to B Type qtrs near NAC High school
2024_MoS_824608_1
CE/R and B/Accts-17/24/295
Open Tender
Civil Works
Works
180 days
Paradip
Refer Tender Document and e-TCN
5 documents required · 5 mandatory
₹5,000
Yes
As per Tender Document and e-TCN
₹2.5 L
Yes
11 Nov 2024
5 Sept 2024
27 Sept 2024
5 Sept 2024
25 Sept 2024
5 Sept 2024
Amount
Dismantling & removing the old damaged following item of works as per the requirement at site including scaffolding, disposing the same at specified place with in all leads and lifts including supplying of all labours, T&P etc all complete as per the direction of Engineer-in-charge. (Excludicng cost of GST)
Brick work
Earth work in excavation in all kinds of soil with initial lead & lift with dressing, leveling & compacting the foundation bed, breaking the clods to maximum 5cm to 7cm, disposing the material at a designated place and keeping the required quantities for back filling with cost of labour, T&P, tollage,transportation, loading at one end & unloading at other end, all taxes, excluding GST all complete as per the direction of Engineer-in-charge.
Saline Sand filling at required locations including watering & ramming in layer not exceeding 300mm. Including cost of all materials, labour,T&P, transportation charges, royalties, taxes, etc. all complete as per direction of Engineer-in-charge but excluding GST. NB: 10.00% voids will be deducted from actual measurment at site to achieve the payabe quantity.
P.C.C(1:3:6) of using 20 mm. & down C.B.G chips of approved quality infoundation & plinth including mixing hoisting, laying to proper level &slope compacting, curing, watering charges etc. complete including cost& supply of all materials, labour, T&P, taxes, etc. complete but excluding cost of GST as directed by Engineer-in-charge
Reinforced Cement concrete (1:1.5:3) using 12mm to 20mm size C.B.G. chipsforall floors, foundation & plinth etc. of approved quality mixing,hoisting,laying, compacting, curing with cost and supply ofallmaterials, labour,T&P, taxes, tollage, royalties, etc. all complete but excluding GST as directed by Engineer-in-charge.
Providing rigid smooth leak proof centering & shuttering made of steel/ply, plank of approved quality for R.C.C. structures and deshuttering and removing the same after due period with supply of all materials, labour, T&P, taxes, royalties, tollage, etc. all complete but excluding GST as directed by Engineer-in-charge.
R.C.C. foundation and footing bases of columns mass concrete & precast slab etc.
RCC wall & fins
Supply Tor/TMT steel manufacturedbySAIL/TISCON/VIGAC Steel of Fe-500 confirming to IS-1786 including cutting, straightening, bending,binding & placing the grills in position for RCC works binding the grillswith binding wire of 18 to 20 gauge including supply of steel, labour,materials, transportation charges, T&P, taxes, etc. all complete butexcluding GST as per the direction of Engineer-in-charge. (NB: Nopayment shall be made for extra weight than theoretical co-efficient).
Dewatering of water from water logged area by using 5 HP pumpset with diesel engine connecting with suction and delivery pipe with supply of operator , POL, transportation charges etc all complete as per the direction of engineer -in-charge
Supplying, fitting, fixing of 25mm Thick chequered Tile of approved quality & shade laying over a base course of cement mortar (1:3) required thick with cement slurry including close chipping to the existing floor or newly prepared base, cutting of tiles to size, filling the joints with the proper materials laid to proper slope and level cleaning the top surface with cost and supply of all materials, labour, T&P, taxes, curing, transportation charges, staging, etc. all complete as per direction of Engineer-in-charge (Excluding GST).
Brick work in Fly Ash Bricks of size 25cm x 12cm x 8cm having crushingstrength not less than 75 Kg/Cm² to 99Kg/Cm² with C.M (1:6) includingsplay/cutting, racking out the joints curing, hoisting, staging at anyheight with cost and supply of all materials, labour, T&P, taxes,royalties, transportation charges, curing, testing charges etc. allcomplete but excluding cost of GST as per direction of Engineer-incharge
12 MM thick Cement plaster with cement mortar (1:6) proportion,over brick work including racking out the joints, finished smooth to theexposed surface, ounding the corners wherever found necessaryincluding cost & supply of all materials, labour, T&P, staging,scaffolding, watering, curing, taxes, tollage, royalties, etc. complete but excluding cost of GST as per direction of Engineer-in-charge
LAXMI ENTERPRISES
Padmanav Lenka
BIKRAM KESHARI ROUTARAY
SM ENTERPRISES
Nilamani Swain
Skater Infratech India Pvt. Ltd.
M/S JAY JAGANNATH ENTERPRISES
Anuja Mohapatra
Bijaya Kumar Jena
SUSANTA KUMAR SWAIN
NIRANJAN SAHOO
M/S.RAMESH CHANDRA MOHANTY
Bidyadhar Swain
Harihar Nayak
PRAHALLAD CHANDRA SWAIN
Ms Gangadhar Jena
Manoj Kumar Nayak
M/S JAYADEV BEHERA
M/S SAVITA SINGH
M/s RAVI REALCONS PRIVATE LIMITED
Aakar Engineers and Contractors
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
BOQ_866551.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .