| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.8 CrAccepted-AOC | ₹10.8 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹10.9 CrRejected-Finance | ₹10.9 Cr | L2 | Rejected-Finance Not Admitted |
| 3 | Not Admitted-Fee/PreQual/Technical 24 JEEVAN PLAZA VIRAM KHAND 5 GOMTI NAGAR LUCKNOW UTTAR PRADESH | LUCKNOW | LUCKNOW | UTTAR PRADESH | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹10.9 Cr
EMD Value
₹21.8 L
Closing Date
24 Dec 2024, 12:00 pmClosed
SE, jnp gzp circle, PWD, Jaunpur
SE, jnp gzp circle, PWD, Jaunpur
W/S Of Patti Dasgarpara Pilkichha road (ODR) (Including 5 Year Maintenance )
2024_CEUVZ_974590_1
74/Camp/SE Tender/jnp-gzp circle/24 date 10-10-2024
Open Tender
Civil Works
365 days
JAUNPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,590
₹21.8 L
Yes
SE, jnp gzp circle, PWD, Jaunpur
20 Feb 2025
16 Nov 2024
24 Dec 2024
16 Nov 2024
24 Dec 2024
16 Nov 2024
16 Nov 2024
Amount
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m . (Including all materials,labour T&P but excluding GST)
Construction of Embankment with Material Deposited from Roadway Cutting:- Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.(Including all materials,labour T&P but excluding GST)
Construction of Embankment with Material obtained from Right of way:- Construction of embankment with approved material obtained from Right of way with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Including all materials,labour T&P but excluding GST )
Stablized Sub-base(FDR Technology) Providing, laying, spreading and compacting of existing granular material adding cement using truck mounted / self propelled cement spreader shall have variable working width the microprocessor, controlled spray rate through augers and cellular wheels. The aggregate shall be in situ pulverized/stabilize using four wheeled drive recycler having working depth up to 50 cm with variable depth control system. Compacting with vibratory roller,pneumatic roller ,vibratory pad foot pad roller (20 tonne) to achieve design unconfined compressive strength. (Including all materials,labour T&P but excluding GST )
Providing, laying, spreading of graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC cement and 3.50% Emulsion in uniform single layer on sub base/ subgrade and compacting with the road roller to achieve the desire density. (Including all materials,labour T&P but excluding GST)
Providing and applying tack coat with bitumen using bitumrn pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (Including all materials,labour T&P but excluding GST)
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder(VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. (Including all materials,labour T&P but excluding GST )
Construction of un-reinforced, dowel jointed, plain cement concrete pavement (M-35) over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing. (Including all materials,labour T&P but excluding GST)
Construction of sub-grade and earthen shoulders with approved material obtained from right of way with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Including all materials,labour T&P but excluding GST)
Plain cement concrete M15 in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundationand compacted by vibration including curing for 14 days foundation.(Including all materials,labour T&P but excluding GST)
Plain/Reinforced Cement Concrete(M-20) complete as per Drawing and Technical Specificatons.(Including all materials,labour T&P but excluding GST)
Supplying, fitting and placing HYSD bar reinforcement in super structure complete as per drawing and technical specifications.(Including all materials,labour T&P but excluding GST)
PART B Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17-02-2024 Maintainance cost will adjusted as per final cost of construction and will be paid accordingly.
1st year- maintainance cost 0% on Bituminous, CC & drain work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
2nd year- maintainance cost 0.25% on Bituminous, CC & drain work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
3rd year- maintainance cost 0.50% on Bituminous, CC & drain work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
4th year- maintainance cost 0.75% on Bituminous, CC & drain work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
5th year- maintainance cost 1% on Bituminous, CC & drain work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
MAGNIFIQUE INFRASOLUTIONS PVT LTD (BID ID -4808327)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf