Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹2.9 L
EMD Value
₹14,545
Closing Date
10 Jan 2026, 6:55 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER REW BUDGAM
RDD Complex Budgam
DEVELOPMENT OF TULBAGH CRICKET GROUND B/W/O FENCING AT WATALPORA
2026_RDPR_299659_9
NIT_102_CDF_REW BUDGAM OF 2025-26
Open Tender
Civil Works
Percentage
30 days
PAKHERPORA
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer REW Budgam
₹14,545
2 Jan 2026
2 Jan 2026
10 Jan 2026
2 Jan 2026
10 Jan 2026
2 Jan 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: Rural Engineering wing Budgam
Name of work : Development of Tulibagh Cricket Ground B/W/O Fencing at Watalpora Scheme: CDF-Grants.
Contract No: of 2025-26 DATED: -12-2025 Adv cost =Rs 2.91 Lacs
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes in Rs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
0_) Earth workin execavation by manual means in trenches for foundations,drains,pipes,etc. not exceeding 15cm in width BI01010001010000000000000515BI0100001119 CUM _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Providing and laying stone soling hand packed in foundation complete with all costs and carriages of lead 10km avg' BI01010001010000000000000515BI0100001120 CUM _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR INR Nine Thousand Seven Hundred & Sixty Eight Only
0_) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3coarse sand : 6 graded stone aggregate 20 mm nominal size) BI01010001010000000000000515BI0100001121 CUM _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR INR One Lakh Seventeen Thousand Eight Hundred & Eighty Three Only
0_) Centering and shuttering incl. propping strutting and removal of the same upto plinth level FRONT AND BCK BI01010001010000000000000515BI0100001122 SQM _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR INR Eighty Five Thousand &Twenty Three Only
0_) 12 MM CEMENT PLASTER IN 1:4 MIX BI01010001010000000000000515BI0100001123 SQM _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR INR Forty Three Thousand One Hundred & Forty Six Only
0_) Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. BI01010001010000000000000515BI0100001124 KG _(* #,##0.99_);_(* \(#,##0.99\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR INR Twenty Two Thousand Seven Hundred & Twenty Two Only
0_) SAND 10 KM BI01010001010000000000000515BI0100001125 CUM _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR INR Two Thousand Seven Hundred & Eighty Five Only
0_) AGGREGRATE 15 KM BI01010001010000000000000515BI0100001126 CUM _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR INR Six Thousand Three Hundred & Seventy Three Only
0_) Provision for headload, signboard,photographs and other unforseen items. BI01010001010000000000000515BI0100001127 job Excess(+) Full Conversion INR INR One Thousand Seven Hundred & Sixty Two Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
Total in Figures INR Two Lakh Ninety Thousand Nine Hundred Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
BOQ_972174.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .