Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.5 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹20.2 L+₹73,353.77 (3.77%)Rejected-AOC 94A APR COLONY BILHARI JABALPUR MP | JABALPUR | MADHYA PRADESH | 482020 | L2 | Rejected-AOC Being L2 | |
| 3 | L3₹23.6 L+₹4.1 L (21.2%)Rejected-AOC PLOT NO 14 SHIV COLONY KATI GHATI RAJGARH ROAD ALWER RAJ | ALWAR | ALWAR | RAJASTHAN | L3 | Rejected-AOC Being L3 | |
| 4 | L4₹27.5 L+₹8.0 L (41.1%)Rejected-AOC | L4 | Rejected-AOC Being L4 | |
| 5 | L5₹27.5 L+₹8.1 L (41.4%)Rejected-AOC | L5 | Rejected-AOC Being L5 |
Tender Value
Refer Docs
EMD Value
₹45,800
Closing Date
24 Oct 2020, 6:00 pmClosed
CWE AF JODHPUR
HQ CWE AF JODHPUR
OUTSOURCING OF RESOURCES FOR MANAGEMENT AND OPERATION OF EM INSTALLATION AND CONNECTED ITEMS AT AF STN JAIPUR
2020_MES_365745_2
85852/E8
Open Tender
Miscellaneous Works
Item Rate
330 days
Jaipur
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Yes
AGE (I) (AF) Jaipur
₹45,800
Yes
7 Nov 2020
25 Sept 2020
26 Oct 2020
25 Sept 2020
24 Oct 2020
10 Oct 2020
Amount
DOMESTIC AREA AT AF STN JAIPUR Provisioning of resources for Management of Main Receiving sub station comprising of HT 11KV incoming supply system and LT distribution system including attending routine complaint of electric supply complete all as specified in Notes at domestic area at AF Station Jaipur allied system and operation of the following as directed by Engr-in-Charge . The following staff shall be employed by the contractor for manning and operation of receiving substation. Electrician:- 01 No in a shift. (Timing - 0600 hrs to 1400 hrs i.e. 08 hours of each shift including Sundays / Holidays) Notes:-The rates quoted deemed to be included (a) providing fuse wire,lubrication material , bolts ,nuts washer rubber seal packing etc .Safety equipment stiched uniform blue in colour will be supplied to electrician by contractor to be followed while handling power supply. (b) The cost of surface clearing upto 5.00m from external perimeter of installation by cutting ,vegetarian ,grass ,beads ,trees upto 30cm grith sweeping and removing the same not exeeding 50m distance away from installation surrounding area and power house primes. All T&P for cutting grass and trees will be provided by the contractor. (c) Emergency light will be provided during night hours. (d) Details of installations:- (i) Transformer 11 KV –01Nos (ii) HT 11 KV OCB/ VCB Indoor type 400 Amps – 01 No (iii) Gang operating device for repair of blown of HT fuses – 01 Nos (iv) DG set 82.5 KVA - 01 No. (d) Contractor will provide all the necessary assistance towards completion of item No 1.00 which is deemed to be included in the rate quoted by the contractor. (e) All necessary complaints will be done by contractor and Maintenance of stores will be issued by department free for fixing under Sch'B'. (f) The contractor will be fully responsible to releive staff and alternate arrangement will be done with prior information to Engr In Charge. (g) IF person will be absent from duty double penalty will be recovered by contactor.And Same will be applicable for Sl item no 1, 2, 3 & 4.
Rate required to be quoted for execution of work as described in Srl No.1 here in before for the following.
(a) Electrician(Skilled) Wages Basic rate for Electrician.
(b) ESI as per existing rules for Electrician.
(c) EPF as per existing rules for Electrician.
(d) Contribution of Bonus as per existing rules for Electrician.
(e) Over head charges and profit on Srl No.(a) to (d) above.
(f) LWC as per existing rules.
(g) GST as per existing rules.
DOMESTIC AREA AT AF STN JAIPUR Provisioning of resources for Management of water supply installation comprising of Water pumps, chlorination plants,UG sump and distribution of water in domestic area complete all as specified in Notes at AF Station Jaipur The following staff shall be employed by the contractor for manning and operation of watersupply installations. FGM : 02 shifts (FGM- 01 No for each shift). (Timing - 1400 hrs to 2200 hrs i.e. 08 hours of each shift including Sundays / Holidays) Note :- (a) Safety precautions to be followed while handling chlorination plants/ dozing unit. (b) Detail of Installations. (i) Pump set 10 HP -02Nos. (ii) LT Panel for Pump Set - 02 Nos. (iii) Pump set 7.5 HP -02Nos. (iv) Chlorine dozing unit - 01 No. (v) DG set 50 KVA - 01 No. (vi) borewells - 04 Nos. (c) The Chlorination of Water by liquid chlorine/ bleaching powder daily, responsbility of staff employed by the contractor at Pump House (d) Necessary chlorine/ bleaching powder will take on suuply only items in this schedule (e) Contractor will provide all the assistance towards item No 02 which is deemed to be included in the rate quoted by the contractor. (f) All the safety precaution regarding handling of chlorination equipmat/ chlorine gas cylinder plant shall be ensured by contractor’s rep (approach staff) such as leakage of chlorine gas kit provided by contractor etc complete to the entire satisfaction of Engineer-in- Charge (g) All necessary complaints will be done by contractor and Maintenance of stores will be issued by department free for fixing under Sch'B'
Rate required to be quoted for execution of work as described in Srl No.2 here in before for the following.
(a) Electrician(Skilled) / FGM (Skilled) Wages Basic rate for Electrician.
(b) ESI as per existing rules for Electrician.
(c) EPF as per existing rules for Electrician.
(d) Contribution of Bonus as per existing rules for Electrician.
(e) Over head charges and profit on Srl No.(a) to (d) above.
(f) LWC as per existing rules.
(g) GST as per existing rules.
TECHNICAL AREA AT AF STN JAIPUR Provisioning of resources for Management of Main Receiving sub station comprising of HT 11KV incoming supply system and LT distribution system including attending routine complaint of electric supply complete all as specified in Notes at Technical area at AF Station Jaipur allied system and operation of the following as directed by Engr-in -Charge.The following staff shall be employed by the contractor for manning and operation of receiving substation Electrician :- 02 shift i.e. One electrician in each shift Shift timing is 1400 to 2200 hrs & 2200 to 0600 hrs i.e. 08 hours of each shift including Sundays / Holidays . Notes:-The rates quoted deemed to be included (a) Providing fuse wire,lubrication material , bolts ,nuts washer rubber seal packing etc .Safety equipment stiched uniform blue in colour will be supplied to electrician by contractor to be followed while handling power supply. (b) The cost of surface clearing upto 5.00m from external perimeter of installation by cutting shrubs ,vegetarian ,grass ,beads ,trees upto 30cm grith sweeping and removing the same not exeeding 50m distance away from installation surrounding area and power house primes .All T&P for cutting grass and trees will be provided by the contractor. (c) Emergency light will be provided during night hours. (d) Details of installations (i) Transformer 11 KV –01Nos (ii) HT 11 KV OCB/ VCB Indoor type 400 Amps – 01 No (iii) Gang operating device for repair of blown of HT fuses – 01 Nos (iv) Voltage stablizer 300 KVA - 02 No. (e) Contractor will provide all the necessary assistance towards completion of item No 1.00 which is deemed to be included in the rate quoted by the contractor. (f) Maintenance of stores will be issued by department free for fixing under Sch'B'.
Rate required to be quoted for execution of work as described in Srl No.3 here in before for the following.
(a) Electrician(Skilled) Wages Basic rate for Electrician.
(b) ESI as per existing rules for Electrician.
( c ) EPF as per existing rules for Electrician.
(d) Contribution of Bonus as per existing rules for Electrician.
(e) Over head charges and profit on Srl No.(a) to (d) above.
(f) LWC as per existing rules.
(g) GST as per existing rules.
TECHNICAL AREA AT AF STN JAIPUR Provisioning of resources for Management of water supply installation comprising of Water pumps, chlorination plants,UG sump and distribution of water in Technical area complete all as specified in Notes at AF Station Jaipur The following staff shall be employed by the contractor for manning and operation of water supply installations. FGM : 02 shifts (FGM- 01 No for each shift). Shift timing 0600hrs to 1400 hrs & 1400 hrs to 2200 hrs i.e. 08 hours of each shift including Sundays / Holidays. Note:- (a) Safety precautions to be followed while handling chlorination plants/ dozing unit. (b) Detail of Installations. (i) Pump set 7.5 HP -02Nos. (ii) LT Panel for Pump Set - 02 Nos. (iii) Pump set 15 HP -01 Nos. (iv) Chlorine dozing unit - 01 No. (v) RO plant 250 Ltrs/Hrs- 01 No. (c) The Chlorination of Water by liquid chlorine/ bleaching powder responsbility of staff employed by the contractor at Pump House (d) Contractor will provide all the assistance towards item No 02 which is deemed to be included in the rate quoted by the contractor. (e) Necessary Calcium Granules/ bleaching powder will take on supply only items in this schedule. (f) All the safety precaution regarding handling of chlorination equipmat/ chlorine gas cylinder plant shall be ensured by contractor’s rep (approach staff) such as leakage of chlorine gas kit provided by contractor etc complete to the entire satisfaction of Engineer-in- Charge.
Rate required to be quoted for execution of work as described in Srl No.4 here in before for the following.
(a) Electrician(Skilled) / FGM (Skilled) Wages Basic rate for Electrician.
(b) ESI as per existing rules for Electrician.
(c ) EPF as per existing rules for Electrician.
(d) Contribution of Bonus as per existing rules for Electrician.
(e) Over head charges and profit on Srl No.(a) to (d) above.
(f) LWC as per existing rules.
(g) GST as per existing rules.
Supply of Calcium Hypochlorite having chlorine content 65% to 70 % free flowing granular material and easily soluble in water. The material shouldnot contain more than 5% to 10 % moisture.Maximum of 10% mesh passing through - 100 BSS and stability loss should be within 10% etc complete all as specified and directed.
Supply only bleaching powder of grade conforming to IS-1065-1989 (2nd Revision) minimum markable chlorine 33.5% by mass packed in HDPE bag of 25 Kg capacity ISI marked complete all as specified. (a) The contractor shall produce manufacturer's " Certificate of Compliance" indicating date of manufacture in original alongwith every consignment of supply. (b) Test Certificate from Govt approved test laboratory shall accompany with every consignment of supply to ensure that the materials supplied are in with conformity with the relevant IS. Make:- Any approved make by E-in-C's branch. Note:- (Applicable for all items)
Servicing only of generators 50 & 82.5KVA capacity including replacement of oil, oil filter, diesel filter including cleaning of air filter and radiator cleaning with air pressure and alike as specified and directed. Note:- Replaced item will be measured & paid separately in supply only items.
Supply only the following items for above DG set complete all as specified. (a) Fuel filter primary For 50 KVA Gen Set
(b) Fuel filter Secondary For 50 KVA Gen Set
(c) Air cleaner element For 50 KVA Gen Set
(d) Lub oil filter For 50 KVA Gen Set
(e) Fuel filter primary For 82.5 KVA Gen Set
(f) Fuel filter Secondary For 82.5 KVA Gen Set
(g) Air cleaner element For For 82.5 KVA Gen Set
(h) Lub oil filter For 82.5 KVA Gen Set
(J) Coolant
(k) Cotton West
(l) Engine Oil
Servicing of 12 v self starter with solenoid for 50/82.5 KVA DG set with changing its bevel gear,bush,shaft,clutch,solenoide,coil for armature complete all as specified.
S&F in replacement of automatic battery charger 12 V, suitable for Diesel generator of capacity 82.5/50 KVA complete all as specified.
Supply and fix in repair of battery back up power pack input 110V ,AC and output 110V ,DC with float charged SMF LA Battery with indicator for ON,battery & fault cold start switch etc complete all as directed by Engineer- in -Charge.
Ravi Enterprises
M/s Yash Electrical and Maintenance
Skyline Encon
DIAMOND ELECTRICALS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .