Executive Engineer
Office of The Executive Engineer, ETD-II, Gorakhpur.
STRENGTHENING OF 132KV MAHADDIPUR BAY AT 220KB SUBSTATION BARAHUWA, GORAKHPUR UNDER ETD-II GORAKHPUR.
2026_UPTCL_1189606_1
12-ETD-II(G)/2026-27
Open Tender
Electrical Works
Item Rate
90 days
220KV SS Barahuwa
Please refer Tender Documents.
2 documents required · 2 mandatory
₹590
AC No.-10887544323, IFSC-SBIN0001494
₹2,000
24 Sept 2026
24 Sept 2026
13 Oct 2026
24 Sept 2026
13 Oct 2026
24 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Following work is to be carried out at 220 KV S/S Barahuwa | |||||
| 1.01 | Safe loading of 145 KV CT(3 Nos) from 132 KVS/S Mohaddipur with the help of crane at private vechile at road side from store. | 1 | Job | - | - |
| 1.02 | Safe Carriage of 145 KV CT(3 Nos) loaded on vechile from 132 KV S/S Mohaddipur to 220 KV S/S Barahuwa GKP | 1 | Job | - | - |
| 1.03 | Safe unloading of 145 KV CT(3 Nos) at 220 KV S/S Barahuwa GKP with the help of crane at private vechile at road side from store | 1 | Job | - | - |
| 1.04 | Opening of CT Cable Connection at Secondary side at 220KV S/S Barahuwa,Gkp. | 1 | Job | - | - |
| 1.05 | Dismantling of old 145KV CT from 132KV Mohaddipur Bay gradually from R,Y&B Phase at 220 KV S/S Barahuwa GKP with the help of derric pole, pulley and rope arrangement then shifting and dragging of used CT from woking site to store side area (distance aprrox 150 meter). All cost of men Power, T&P etc provided by contractor his own cost for completion of work. | 3 | Job | - | - |
| 1.06 | Complete erection and facrication of structure of 145KV CT at 132KV Mohaddipur T/F Bay gradually R,Y&B Phase at 220KV S/S Barahuwa with the help of derric pole, pulley and rope arrangement. All cost of men power, T&P etc provided by contractor his own cost for completion of work. | 3 | Job | - | - |
| 1.07 | Making Termination of 145KV CT Cable Connection at Secondary side. | 1 | Job | - | - |
| 1.08 | Earthing of Structure and equipments with earthing strip by welding machine and painting of earthing BUS Green colour paint including the cost of material (MS strip provided by the contractor) | 1 | Job | - | - |
| 1.09 | Safe Opening/cutting of existing Jack Bus during shutdown over 132 KV mohaddipur line Bay by dismantaling/lowering of tension fitting removal of Disc, opening and lowering of all associated clamps and fittting with shifting of old conductor and fitting to store by bundulling of conductor (01 Job means for single phase work). | 3 | Job | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
Technical12.pdf
Tender Documents • 1.24 MB
BOQ_2241382.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .