Loading…
Loading…
Tender Value
₹97,600
EMD Value
₹4,880
Closing Date
15 Sept 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BUDGAM
RDD COMPLEX BUDGAM
Development of road with 1 No of soakage pit from Main Road to House of Bilal Akbar Dar, Shabir Akbar Dar at S.K. Bagh
2026_RDPR_322876_97
NIT_61_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
30 days
BK PORA
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
EXECUTIVE ENGINEER REW BUDGAM
₹4,880
31 Aug 2026
31 Aug 2026
16 Sept 2026
31 Aug 2026
15 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0_) | S/s and laying of GSB/ Khak Bajri filling at site of required size incl compaction with PRR 8-10T, leads and lifts complete job | 18.2 | Cum | 937 | ₹17,053.4 |
| - | S/S/Laying of WBM Grade II with specified stone aggregate and binding material including , sorting, spreading to template and consolidate with P.R.R of 8- 10 tonne capacity etc. complete. | 6.5 | Cum | 1,900 | ₹12,350 |
| - | Supply/stacking & Laying of stone dust/Moorum as binding material Including consolidation . | 1 | Cum | 668.95 | ₹668.95 |
| - | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: in all kinds of soil | 8 | Cum | 479.3 | ₹3,834.4 |
| - | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material :in all Kinds of soil | 2.4 | Cum | 89.75 | ₹215.4 |
| - | Dry random rubble masonry with hard stone in foundation and plinth With bond stone | 6.6 | Cum | 5,536.55 | ₹36,541.23 |
| - | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level in 1:1.5:3 mix | 0.5 | Cum | 7,788.4 | ₹3,894.2 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platforms. | 0.5 | sqm | 718.2 | ₹359.1 |
| - | Reinforcement for RCC incl. Straightening, cutting, Bending, placing in position and binding complete | 37.56 | kg | 115.35 | ₹4,332.55 |
| - | Providing and fixing of PVC Prince pipe (Type "B") in proper gradient in excavated trenches including jointing and refilling the excavated material complete including cost of excavation and fittings: a) 110mm OD Pipe | 2 | rm | 365 | ₹730 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.34 MB
BOQ_1085036.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .