| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 CrAccepted-AOC 20 SC BOSE COLONY GALL NO 2 DEFENCE LAB ROAD RATNADA JODHPUR 342001 | JODHPUR | JODHPUR | RAJASTHAN | 342001 | ₹7.9 Cr | L1 | Accepted-AOC BEING L1 |
| 2 | L2₹8.7 Cr+₹84.6 L (10.7%)Rejected-Finance MATERE HOUSE SEC NO 14 PRADHIKARAN PUNE MAHARASHTRA INDIA 412105 | PUNE | MAHARASHTRA | 412105 | ₹8.7 Cr+₹84.6 L (10.7%) | L2 | Rejected-Finance NOT BEING L1 |
| 3 | L3₹9.1 Cr+₹1.2 Cr (15.5%)Rejected-Finance 1ST 2ND FLOOR PLOT NO 13 C 13 3 RAMA ROAD SIDE INDUSTRIAL AREA NAJAFGARH ROAD DELHI 110015 INDIA | WEST | DELHI | 110015 | ₹9.1 Cr+₹1.2 Cr (15.5%) | L3 | Rejected-Finance NOT BEING L1 |
| 4 | L4₹10.0 Cr+₹2.1 Cr (26.5%)Rejected-Finance HOUSE NO 769 SOUTH CIVIL LINES MUZAFFARNAGAR UP 241001 | HARDOI | UTTAR PRADESH | 241001 | ₹10.0 Cr+₹2.1 Cr (26.5%) | L4 | Rejected-Finance NOT BEING L1 |
| 5 | Rejected-Technical PLOT NO 13 THIRD FLOOR BANSAL PLAZA SECTOR 6 COMMERCIAL COMPLEX DWARKA NEW DELHI 110075 | NEW DELHI | SOUTH WEST DELHI | DELHI | 110075 | - | - | Rejected-Technical Not Recommended As per Para 8 b vi of Appx A to NIT at Ser Page No 9 the UE bidder who secured two work in MES should ge themselves registered in appropriate designated class with any registering authority else the firm will not be eligible. |
Tender Value
₹11 Cr
EMD Value
₹8.8 L
Closing Date
9 Feb 2025, 6:00 pmClosed
Chief Engineer
Headquarters Chief Engineer Bareilly Zone Bareilly
PROVISION OF SMART PREPAID METERS IN MARRIED QUARTERS UNDER GE NORTH MEERUT CANTT AND CIV QTRS AT RTS AND DEPOT SAHARANPUR AND GE MES ROORKEE
2025_MES_691641_1
CEBZ/MRT/T-29 of 2023-24
Open Tender
Electrical and Maintenance Works
Item Rate
480 days
Meerut
AS PER NIT
8 documents required · 8 mandatory
₹3,000
GE North Meerut
₹8.8 L
Yes
29 May 2025
3 Jan 2025
17 Feb 2025
3 Jan 2025
9 Feb 2025
25 Jan 2025
Amount
Phase-I: Taking down carefully, after noting meter reading, by disconnecting and unscrewing from boards /outlets boxes, electric meters of any size, rating, of any locations and depositing and handover to E & M stores as per bldg inventory and making good the disturbed surfaces after installation of new meters complete all as directed.
Design, installation, testing and commissioning, integrate and maintain the Advanced Metering infrastructure (AMI) comprising of folowing:- (a) Supply, installation, testing and commissioning of Smart Meters of different makes (not more than 33 % of a particular make to ensure interchangeability at a later date as per BIS 16444 with communication technology including GPRS/RF/Hybrid (RF+GPRS)/ Any other advanced technology as per CEA/ TRAI regulations alongwith polycarbonate meter box. (i) Single phase - 5441 Nos. (ii) Three phase - 72 Nos (b) Supply/ Planning/ Setup/ Tuning of RF Communication infrastructure inclidng Network Management (NMS) & Head End System (HES) for the project area AMI software and associated equipments should be capable of handling at least 14683 Numbers of Meters of different makes as per BIS 16444 . (c) Supply and set up of Meter Data Management (MDM) system. Contd..
(d) Integration of different devices of different makes/ equipment/ software covered in scope of this project with each other as per functional requirements, including water charges, furnitrue and license fees. (e) Integration/ Interfaces of the AMI system with application system like metering/ billing/ collection. Interface has to be provided in the proposed solution to upload and process meter data from these systems. (f) Hosting the system to Government community could server for hosting and management of supplied software application with standby server. (g) Planning, deployment & tuning of communication system incliding cellular network (if required) to meet the performance requirements. (h) Business intelligence, Analytics and Reporting. (j) Return of Dismantled materials to MES store. (k) Training and knowledge transfer. (l) All expenditure including periodic charges of telecom operator form installation till completion.
Note : (i) The defect liability period will be 2 years from the date of completion of Phase-I. (ii) Any variaiton in quantity of Smart Prepaid Meter (AMI) will be paid and deducted as per the supplementary rate for single and 3 phase smart meter beyond the qunatity mentioned here-in-before as per rates given below:- (a) Single Phase meter - Rs 6838/- per meter. (b) Three phase meter - Rs 8135/- per meter. (iii) The rent and water supply bill and any other charges or levy will be included in software as directed by GE.
Supply, installation three broadband connections for Meerut, Roorkee and Saharanpur station with high speed internet connection for two years complete all as directed.(One connection in the name of Garrison Engineer (North) Meerut and two connection in the name of Garrison Engineer Roorkee).
Provision of wireless Report Printer with 12 pages per minute capacity, 600 x 600 dpi REt, 1200 dpi effective output quality (600 x 600 x 2 dpi with REt, with duty cycle 3,000 single-sided pages per month for report printing complete as required, Make: HP LaserJet 1020 or equivalent in Canon, Epson and Samsung printer all as specified.
Provision of computer PC desktop with processor i-7- 12700 , 12th Generation, DDR5 8-GB RAM, hard disk 512 SSD + 1TB HDD, 4-USB Port including 24" monitor of same make, keyboard, mouse, Make-HP/DELL/IBM/ with licensed Operating system (Windows 10), along with UPS backup of minimum 01 hour but capacity not less than 01 KVA capacity".
Supply and install hi wall five star rated split units indoor/outdoor complete with cordless remote control unit and with in built Heating and Cooling arrangement and Digital Inverter capacity 1.5 TR complete all as directed.
Supply and fix Voltage stabilizer for automatic operation, single phase naturally air cooled indoor type & designed for input variation between 170 V to 250 V with output voltage stabilized at 230 V with accuracy of ± 2.5% and of capacity 4 KVA.
MISC ITEMS
Material & labour for sub main wiring with 1100 volt grade two single core PVC insulated and unsheathed cable with stranded copper conductor (FRLSH) of following sizes drawn into and including electrical grade PVC conduit not less than 25 mm dia with all accessories fixed concealed including chase cutting in brick/ stone masonry for fixing conduit and making good the disturb surfaces of wall as per existing including multi - stranded copper conductor as earth wire in green colour complete all as specified and directed for the following:- contd..../-
(a) 2 run of 6.0 Sqmm cable and 1 run of 6.0 sqmm cable connected to common earth dolly Note :- Two runs of 6.0 sqmm (FRLSH) and one run of 4.0 sqmm (FRLSH) copper conductor shall be measured as one unit length.)
(b) 4 run of 6.0 Sqmm cable and 2 run of 6.0 sqmm cable connected to common earth dolly Note :- Four runs of 6.0 sqmm (FRLSH) and two run of 4.0 sqmm (FRLSH) copper conductor shall be measured as one unit length.)
Phase-II: Provision for comprehensive operation including periodic charges of telecom operator, smart meter billing from completion of work till the completion of defect liability period of 2 years complete all as specified and directed.
Phase-III: Comprehensive operation and maintenance of system including Project implementation & management, all expenditure including periodic charges of telecom operator, smart meter billing and maintenance, after completion of defect liability period till completion for 08 years extendable to further 2 years after manual agreeemnt complete all as specified and directed.
Note for item No 14 & 15: Penalty Clause:- (a) Any defect/ malfunctioning in meter will have to be resolved within 24 hours failing which payment for that particular meter for concerned month shall not be made to the contractor. (b) In case issue is not resolved for 48 hours, penal recovery double rate quoted shall be made from contractor's due. (c) Contractor shall maintain a total reserve of 54 Nos. single phase and 01 No. three phase meter in MES store held with respective GE as decided by the CsWE.
Material and labour for integration of Additional single/ three phase Smart Electric Meters (as per IS-16444) in the AMI being provided in this contract complete all as specified and directed by Engr-in-Charge. Note: This item will be executed in all three phases as per site requirement. Payemnt to contractor for this item for number of meters mentioned in Sl item No. 2 will be considered in final bill of Phase-I. For integration of meters during Phase-II & III, amount will be booked in the respective jobs and payment will be released accordingly.
V M MATERE INFRASTRUCTURES INDIA PVT LTD (BID ID -3229347)
Vardhman Airport Solutions Private Limited (BID ID -3229688)
M/s Arihant Builders (BID ID -3229230)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_774285.xls
BOQ • 0.32 MB
160026459.pdf
Tender Documents • 0.34 MB
160026466.html
Tender Documents • 0.06 MB
tendermeerut.pdf
Tender Documents • 3.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .