| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC GOA | ₹1.1 Cr | L1 | Accepted-AOC Accepted Being L1 Bidder |
| 2 | L2₹1.2 Cr+₹7.3 L (6.76%)Rejected-Finance | ₹1.2 Cr+₹7.3 L (6.76%) | L2 | Rejected-Finance Rejected Being L2 Bidder |
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
18 Aug 2026, 11:00 amClosed
Executive Engineer DIV VIII ASW-I PWD Fatorda
Executive Engineer DIV VIII ASW-I PWD Fatorda
Upgradation of Freedom Fighters Memorial Park at Cuncolim in Cuncolim Constituency.
2026_PWD_30975_1
PWD/Div8/ASW/2001/17/26-27/L2
Open Tender
Civil Works - Buildings
Percentage
300 days
Fatorda
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
Yes
₹2.4 L
Yes
20 Aug 2026
11 Aug 2026
20 Aug 2026
11 Aug 2026
18 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of ground including removing vegetation in equalities not exceeding 15 cm deep and disposal of rubbish lead upto 50 m and lift upto 1.5 m.Ordinary soil | 41.82 | sq.m | 26 | ₹1,087.32 |
| 2 | Clearing grass and removal of rubbish upto a distance of 50 m outside the periphery of the area | 2.72 | 100 sq.m | 498 | ₹1,354.56 |
| 3 | Dismantling steelwork in built up sections in angles, tees, flats and channels including all gusset plates bolts, nuts, cutting dismembering and staking within 50 mts. Lead | 17.66 | qtl | 293 | ₹5,174.38 |
| 4 | Dismantling doors, windows and clearestory windows (steel or wood) shutters including chowkhats architrave holdfast etc. complete and staking within 50 mt. Lead Area beyond 3 sq.m. | 4 | each | 266 | ₹1,064 |
| 5 | Dismantling the tile work in floors and roofs laid in cement including stacking of materials within 50 meters lead for thickness of tiles 10mm to 25mm. | 522.39 | sq.m | 330 | ₹1,72,388.7 |
| 6 | Demolishing R.C.C. work including stacking of steel bars & disposal of unserviceable within 50 mts. lead. | 2.44 | cu.m | 1,618 | ₹3,947.92 |
| 7 | Demolishing cement concrete 1:3:6 or richer mix including disposal of material within 50 m lead. | 40.98 | cu.m | 1,122 | ₹45,979.56 |
| 8 | Removing white or colour wash by scrapping, sand papering and preparing surface smooth including necessary repairs to scratches etc. complete. | 778 | sq.m | 19 | ₹14,782 |
| 9 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m All kinds of soil. | 28.98 | cu.m | 291 | ₹8,433.18 |
| 10 | Earthwork in surface excavation not exceeding 30 cm depth(but exceeding 1.5 m width as well as 10 sq.m on plan) including disposal of excavated earth beyond work site for all leads lift disposed earth to be leveled and neatly dressed in: Ordinary soil | 271.86 | sq.m | 48 | ₹13,049.28 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
Tendernotice_2.pdf
PDF • 1.62 MB
BOQ_31373.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .