Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹40,000
Closing Date
1 Oct 2026, 2:00 pm4d left
DG WS
CMO BUILDING, 5, S. N BANERJEE ROAD KOL-700 013
RESTORATION OF 240 KW, 11KV HT INDUCTION MOTOR BY REPLACING DEFECTIVE COILS AND DE/NDE BEARINGS AT ANANDAPUR BPS
2026_KMC_1040931_1
KMC/WS/ABPS/26-27/06
Open Tender
Miscellaneous Works
Percentage
45 days
ANANDAPUR BPS
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹40,000
12 Sept 2026
12 Sept 2026
5 Oct 2026
12 Sept 2026
1 Oct 2026
12 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1. TAKING OUT THE BEARINGS (HAVING MINIMUM ID-75MM TO 200MM) WITH PROPER CARE AND CAUTION BY PROVIDING ALL RELEVANT TOOLS & FIXTURES AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC , [ RATE ANALYSIS APPROVED BY DG(WS) ON 26/02/2019] | 374.1 | CM2 | 50 | ₹18,705 |
| 2 | 2. TAKING OUT THE ROTOR (HAVING BALL/ ROLLER BEARINGS ETC) FROM THE STATOR AFTER SEQUENTIAL DE ASSEMBLING OF THE HT MOTOR PART BY PART & AFTER NECESSARY MEASUREMENT AND DEMARCATION AND PLACING THE SAME ON THE PEDESTAL AT THE WORKING FLOOR BY USING THE DEPARTMENTAL OVERHEAD CRANES ETC. WITH CARE & CAUTION WITH THE COMPLIANCE OF THE RELEVANT SAFETY NORMS & COMPLETE AS PER DIRECTION OF EIC. [ RATE ANALYSIS APPROVED BY DG(WS) ON 26/02/2019] | 1,454.54 | OI | 2.1 | ₹3,054.53 |
| 3 | 3. REMOVAL OF HALF COUPLING USING THE HYDRAULIC PULLER & FIXTURES ETC. VERY CAUTIOUSLY FROM THE SHAFT AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. [ RATE ANALYSIS APPROVED BY DG(WS) ON 26/02/2019] | 1,454.54 | OI | 0.55 | ₹800 |
| 4 | 4. TAKING OUT ALL STATOR COILS AFTER TAKING NECESSARY PARAMETER FROM STATOR SLOTS VERY CAUTIOUSLY BY ARRANGING ALL THE MACHINERIES, SKILLED MANPOWER, TOOLS & TACKLES AS INVOLVED WITH PROPER CARE AND COMPLETE CAREFULLY AS PER DIRECTION OF EIC. [ RATE ANALYSIS APPROVED BY DG(WS) ON 26/02/2019] | 241.71 | MTR | 175 | ₹42,299.25 |
| 5 | 5. THOROUGH CLEANING THE 6KV RATED STATOR SLOTS FROM DUST DIRT LOOSE PARTICLES ETC AND DRYING THE STATOR SLOTS COMPLETE CAREFULLY AS PER DIRECTION OF EIC. (HOT-SPOT TEST TO BE CARRIED OUT FOR CHECKING OF HEALTHINESS OF STATOR CORE). [ RATE ANALYSIS APPROVED BY DG(WS) ON 26/02/2019 | 0.7 | SQM | 15,065 | ₹10,545.5 |
| 6 | 6. REPLACEMENT OF DAMAGED COIL AS IDENTIFIED BY EIC, BY NEW IDENTICAL COILS WITH PROPER CROSS-SECTION, INSULATION, WITH CARE & CAUTION AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. (THE RATE IS AFTER DEDUCTING THE SALVAGE VALUE OF OLD DAMAGED COPPER COILS). [ RATE ANALYSIS APPROVED BY DG(WS) ON 26/02/2019] | 281.61 | KG | 2,815 | ₹7,92,732.15 |
| 7 | 7. SUPPLY, FITTING & FIXING OF THE RTD SENSORS (PT100) ON EACH OF THE WINDINGS OF THREE PHASES IN ORDER TO MEASURE/MONITORING THE TEMPERATURE OF THE WINDINGS DURING THE MOTOR IS IN OPERATION. [ RATE ANALYSIS APPROVED BY DG(WS) ON 26/02/2019] | 9 | NO | 3,885 | ₹34,965 |
| 8 | 8. LAYING OF COILS USING WEDGES MADE OF FIBER GLASS/EPOXY LAMINATED OF SUITABLE THICKNESS FOLLOWING PROPER METHOD OF STRIPPING /FOLDING THE SLOT INSULATION, DRYING THE SLOT WEDGES ETC COMPLETE IN ALL RESPECT WITH SKILLED WORKMANSHIP MANNER, SECURING THE COILS LASHING WITH SUPPORTS CONNECTION ETC & COMPLETE IN ALL RESPECT WITH PROPER CARE & CAUTION AS PER DIRECTION OF EIC. [ RATE ANALYSIS APPROVED BY DG(WS) ON 26/02/2019] | 230.2 | MTR | 425 | ₹97,835 |
| 9 | 9. REPLACEMENT OF LOOSE WEDGES USING NEW WEDGES MADE OF GLASS/EPOXY LAMINATED OF SUITABLE THICKNESS FOLLOWING PROPER METHOD AND COMPLETE IN ALL RESPECT SKILLED WORKMANSHIP MANNER, WITH PROPER CARE & CAUTION AS PER DIRECTION OF EIC. [ RATE ANALYSIS APPROVED BY DG(WS) ON 26/02/2019] | 9,062.99 | INC | 30 | ₹2,71,889.7 |
| 10 | 10. EFFECTIVE SERIES CONNECTION BETWEEN COILS, SILVER BRAZING THE COILS ENDS TAPING THE JOINTS WITH CLASS-F INSULATING MATERIALS EFFECTIVE INTER-PHASE CONNECTOR AND SOLDERING WITH PROPER F-CLASS MATERIALS, CLEANING & CHECKING THE HT TERMINALS AND TAKING OUT THE WINDING LEADS TO THE TERMINALS ETC & COMPLETE IN ALL RESPECT WITH PROPER CARE & CAUTION AS PER DIRECTION OF EIC. [ RATE ANALYSIS APPROVED BY DG(WS) ON 26/02/2019] | 63 | NO | 340 | ₹21,420 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
techbid.pdf
Tender Documents • 0.46 MB
BOQ_2556261.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .