Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹81.0 LAccepted-AOC NO 430B ARAKKONAM TIRUTHANI ROAD ARAKKONAM RANIPET DISTRICT | ARAKKONAM | RANIPET | TAMIL NADU | L-1 | Accepted-AOC L-1 MP and Co
Lowest Rate | |
| 2 | L-2₹82.7 L+₹1.8 L (2.20%)Rejected-AOC NO 32 BAJANAI KOIL STREET PUDUPADI POST KILAMBADI VILLAGE ARCOT | ARCOT | RANIPET | TAMIL NADU | L-2 | Rejected-AOC L-2 RK CONSTRUCTIONS
Highest Rate | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S RK CONSTRUCTIONS L2 | MPANDCO L1 |
|---|---|---|---|---|---|
| 1.00ARAKKONAM BLOCK | |||||
| 2.00Strengthening of road from Konalam to Ramapuram road ( Via Kanchampattu) Km 0/0-1/150 R 90 (Using Plastic Waste) | |||||
| 3.00 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 1,656 | Sqm | 8 ₹13,248 | 6.3 ₹10,433 Lowest |
| 4.00 | Picking 5 Cm to 10 cm of existing wornout BT / WBM Surface sectioning in all labour charges etc complete (1/3) | 1,447.92 | Sqm | 25 ₹36,198 | 23.3 ₹33,737 Lowest |
| 5.00 | Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A. | 616.24 | Cum | 150 ₹92,436 | 140.4 ₹86,520 Lowest |
| 6.00 | Collection and supply of Carted Earth from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 410.84 | Cum | 150 ₹61,626 | 140.26 ₹57,624 Lowest |
| 7.00 | Providing & Laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC | 646.6 | Cum | 2,942.69 ₹19,02,743 Lowest | 2,942.69 ₹19,02,743 Lowest |
| 8.00 | Applying Prime coat over WMM surface using 7 kgs of bitumen emulsion (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance | 4,310.75 | Sqm | 84.84 ₹3,65,724 Lowest | 84.84 ₹3,65,724 Lowest |
| 9.00 | Applying tack coat over WMM surface using 2.50 kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions | 4,343.75 | Sqm | 25 ₹1,08,594 | 19.63 ₹85,268 Lowest |
| 10.00 | BM 50mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, | 215.53 | Cum | 10,000 ₹21,55,300 | 9,478.2 ₹20,42,836 Lowest |
Tender Value
₹81.0 L
EMD Value
₹86,000
Closing Date
3 Sept 2025, 3:00 pmClosed
Joint Director / Project Director
DRDA, RANIPET
Strengthening of road from Konalam to Ramapuram road ( Via Kanchampattu) Km 0/0-1/150 R 90 (Using Plastic Waste) in Arakkonam Block Ranipet District
2025_RDTN_594752_1
A3/3086/2025
Open Tender
Civil Works - Roads
Item Rate
DRDA
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹86,000
Yes
DRDA, RANIPET
14 Oct 2025
19 Aug 2025
3 Sept 2025
19 Aug 2025
3 Sept 2025
19 Aug 2025
28 Aug 2025
Amount
ARAKKONAM BLOCK
Strengthening of road from Konalam to Ramapuram road ( Via Kanchampattu) Km 0/0-1/150 R 90 (Using Plastic Waste)
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Picking 5 Cm to 10 cm of existing wornout BT / WBM Surface sectioning in all labour charges etc complete (1/3)
Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A.
Collection and supply of Carted Earth from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Providing & Laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC
Applying Prime coat over WMM surface using 7 kgs of bitumen emulsion (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance
Applying tack coat over WMM surface using 2.50 kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions
BM 50mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site,
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site,
PRetro-Reflectorised Traffic Signs (with out definition board) Type - IV Providing and erecting of Retro - Reflector›sed Cautionary, Maridatory and Informatory signs {without definition board} made out of High Intensity Prismatic Grade Sh
60 cm equilateral triangle
Provision for Hectometer stone
Provision for Kilometer stone
Sub Estimate for 3.0m Span RCC Slab Culvert ch at 120m
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Plain Cement Concrete 1:2:4 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc Complete,
RCC 1:1.5:3 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc,
Supply and fabrication of steel for RCC items including cost and conveyance of binding wire, etc., complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface
Below Sill level
Above sill level
Supply and fixin tar pad in deck slab including all cost and conveyance and etc complete
Providing weep holes in Brick masonry Stone masonry Reinforced concrete structure including all cost and conveyance and etc complete
Refilling behind the abutment and wing wall area including all cost and conveyance and etc complete
Sub Estimate for Existing 1.5m span Culvert Parapet wall ch at 1050m
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
M/S RK CONSTRUCTIONS (BID ID -1447565)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .