| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 CrAdmitted-Finance NOT FOUND | ₹9.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹10.0 Cr+₹90.3 L (9.94%)Admitted-Finance 00 BARGO BARGO SENDULI BENDULI GORAKHPUR UTTAR PRADESH 273016 | GORAKHPUR | UTTAR PRADESH | 273016 | ₹10.0 Cr+₹90.3 L (9.94%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Vikash Enterprises L1 | MARUTI ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | DISMANTLING TILE WORK IN FLOORS AND ROOFS laid in cement mortar including stacking material within 100m lead for thickness of tile up to 25mm etc. complete as directed by Engineer-in-Charge. | 1,968 | SqM | 50 ₹98,400 Lowest | 50 ₹98,400 Lowest |
| 2.00 | DISMANTLING TILE WORK IN FLOORS AND ROOFS laid in cement mortar including stacking material within 100m lead for thickness of tiles above 25mm and up to 40mm. | 3,478 | SqM | 60 ₹2,08,680 Lowest | 70 ₹2,43,460 |
| 3.00 | DISMANTLING PLAIN CEMENT CONCRETE manually / by mechanical means carefully without damaging adjacent structures including disposal of debris within 200m lead as per direction of Engineer-in-Charge.. | 59 | CuM | 880 ₹51,920 | 600 ₹35,400 Lowest |
| 4.00 | DISMANTLING BRICK WORK in cement mortar carefully without damaging adjacent structures including stacking of materials and disposal of unserviceable materials within 100m lead as per direction of Engineer-in-Charge. | 11 | CuM | 720 ₹7,920 | 600 ₹6,600 Lowest |
| 5.00 | DISMANTLING OF RCC WORKS carefully manually without damaging adjacent structures excluding cutting of reinforcement including stacking of steel reinforcement bars and disposal of unserviceable materials within 200m lead as per direction of Engineer-in-Charge. | 1 | CuM | 1,200 ₹1,200 Lowest | 2,000 ₹2,000 |
| 6.00 | DISMANTLING OLD PLASTER OR SKIRTING carefully, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 100m lead. | 1,733 | SqM | 50 ₹86,650 Lowest | 50 ₹86,650 Lowest |
| 7.00 | DISMANTLING OLD CEILING PLASTER and cleaning the surface for plaster including scaffolding disposal of rubbish to the dumping ground within 200 m lead etc. complete as directed by the Engineer-in-Charge. | 1,034 | SqM | 95 ₹98,230 Lowest | 100 ₹1,03,400 |
| 8.00 | DISMANTLING BRICK BAT COBA CEMENT BASED WATER PROOFING over roof and chajjas carefully with out damaging adjacent structures including lowering and stacking of materials and disposal of unserviceable materials within 200m lead as per direction of Engineer-in-Charge. | 395 | CuM | 770 ₹3,04,150 Lowest | 2,000 ₹7,90,000 |
| 9.00 | DISMANTLING DOORS, WINDOWS AND CLEAR STOREY OPENINGS (steel / wood) shutter including chowkhats, architraves, holdfasts etc. complete and stacking within 100m lead (full windows) of area 3.00 Sq.M and below. | 262 | Each | 200 ₹52,400 Lowest | 250 ₹65,500 |
| 10.00 | DISMANTLING DOORS, WINDOWS AND CLEAR STOREY OPENINGS (steel /wood) shutter including chowkhats, architraves, holdfasts etc. complete and stacking within 100 m lead (full windows) Of area beyond 3.00 Sq.M etc. complete as directed by the Engineer-in-Charge. | 350 | Nos | 210 ₹73,500 Lowest | 350 ₹1,22,500 |
Tender Value
₹9.6 Cr
EMD Value
₹21.3 L
Closing Date
14 Jul 2026, 3:00 pmClosed
Chief Engineer, CSD
CSD, BARC
Renovation of internal Civil, Electrical and Mechanical works including waterproofing of main building at DAE Convention Centre, Anushaktinagar, Mumbai-400094
2026_BARC_912555_1
BARC/CSD/ET/6/2026-2027 DATE 09/06/2026
Open Tender
Civil Works
Item Rate
365 days
DAE Conventional Centre, Anushaktinagar, Mumbai
Please refer Tender documents
8 documents required · 8 mandatory
₹0
₹21.3 L
Anusaktinagar, BARC, Trombay, Mumbai
13 Aug 2026
12 Jun 2026
17 Jul 2026
12 Jun 2026
14 Jul 2026
30 Jun 2026
12 Jun 2026 - 22 Jun 2026
22 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | DISMANTLING TILE WORK IN FLOORS AND ROOFS laid in cement mortar including stacking material within 100m lead for thickness of tile up to 25mm etc. complete as directed by Engineer-in-Charge. | 1,968 | SqM | - | - |
| 2 | DISMANTLING TILE WORK IN FLOORS AND ROOFS laid in cement mortar including stacking material within 100m lead for thickness of tiles above 25mm and up to 40mm. | 3,478 | SqM | - | - |
| 3 | DISMANTLING PLAIN CEMENT CONCRETE manually / by mechanical means carefully without damaging adjacent structures including disposal of debris within 200m lead as per direction of Engineer-in-Charge.. | 59 | CuM | - | - |
| 4 | DISMANTLING BRICK WORK in cement mortar carefully without damaging adjacent structures including stacking of materials and disposal of unserviceable materials within 100m lead as per direction of Engineer-in-Charge. | 11 | CuM | - | - |
| 5 | DISMANTLING OF RCC WORKS carefully manually without damaging adjacent structures excluding cutting of reinforcement including stacking of steel reinforcement bars and disposal of unserviceable materials within 200m lead as per direction of Engineer-in-Charge. | 1 | CuM | - | - |
| 6 | DISMANTLING OLD PLASTER OR SKIRTING carefully, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 100m lead. | 1,733 | SqM | - | - |
| 7 | DISMANTLING OLD CEILING PLASTER and cleaning the surface for plaster including scaffolding disposal of rubbish to the dumping ground within 200 m lead etc. complete as directed by the Engineer-in-Charge. | 1,034 | SqM | - | - |
| 8 | DISMANTLING BRICK BAT COBA CEMENT BASED WATER PROOFING over roof and chajjas carefully with out damaging adjacent structures including lowering and stacking of materials and disposal of unserviceable materials within 200m lead as per direction of Engineer-in-Charge. | 395 | CuM | - | - |
| 9 | DISMANTLING DOORS, WINDOWS AND CLEAR STOREY OPENINGS (steel / wood) shutter including chowkhats, architraves, holdfasts etc. complete and stacking within 100m lead (full windows) of area 3.00 Sq.M and below. | 262 | Each | - | - |
| 10 | DISMANTLING DOORS, WINDOWS AND CLEAR STOREY OPENINGS (steel /wood) shutter including chowkhats, architraves, holdfasts etc. complete and stacking within 100 m lead (full windows) Of area beyond 3.00 Sq.M etc. complete as directed by the Engineer-in-Charge. | 350 | Nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.11 MB
Tendernotice_2.pdf
PDF • 2.19 MB
ScheduleAET6.pdf
Tender Documents • 0.67 MB
LetterofTransmittalET6.pdf
Tender Documents • 0.18 MB
MechTechSpecsmainbuildingInternalDAECC.pdf
Additional Documents • 0.47 MB
BOQ_959037.xls
BOQ • 0.48 MB
DAECCMainBuildingDrawing1.pdf
Additional Documents • 4.74 MB
DAECCMainBuildingDrawing2.pdf
Additional Documents • 3.03 MB
FormAtoHTechbidET6.xls
Tender Documents • 0.10 MB
ProformaofScheduleET6.pdf
Tender Documents • 0.66 MB
FinalElectricalSpecificationsDAECCInternalR1.pdf
Additional Documents • 2.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .