| 1 | L1₹1.6 CrAdmitted-Finance KARAVALLI NADUCOMBAI PO NAMAKKAL 637404 | NAMAKKAL | TAMIL NADU | 637404 | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.7 Cr+₹9.6 L (6.06%)Admitted-Finance | ₹1.7 Cr+₹9.6 L (6.06%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SRM Constructions L1 | SR INFRAA L2 |
|---|---|---|---|---|---|
| 1.00Upgradation to the road from Navakkadu Meenatchiamman Kovil to melmenur Km 2/300 – 3/300 (R271) | |||||
| 2.00 | Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers. Km 0/0-0/400 | 1,440 | Sqm | 3.74 ₹5,385.6 Lowest | 10.74 ₹15,465.6 |
| 3.00Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) Km 0/0-0/400 | |||||
| 4.00 | KM2/300-3/0 | 323.35 | Cum | 2,184.07 ₹7,06,219.03 Lowest | 4,500 ₹14,55,075 |
| 5.00 | Km3/0-3/300 | 73.64 | Cum | 2,201.33 ₹1,62,105.94 Lowest | 3,500 ₹2,57,740 |
| 6.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Km 0/0-0/400 | |||||
| 7.00 | KM2/300-3/0 | 388.01 | Cum | 2,478.96 ₹9,61,861.27 Lowest | 2,478.96 ₹9,61,861.27 Lowest |
| 8.00 | Km3/0-3/300 | 88.37 | Cum | 2,478.96 ₹2,19,065.7 Lowest | 2,478.96 ₹2,19,065.7 Lowest |
| 9.00 | Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 3,225 | Cum | 74.64 ₹2,40,714 Lowest | 74.64 ₹2,40,714 Lowest |
| 10.00 | Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. Km 0/0-0/400 | 3,225 | Cum | 14.42 ₹46,504.5 Lowest | 14.42 ₹46,504.5 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
19 Feb 2021, 3:00 pmClosed
Project Director
DRDA Namakkal
1 Road works at Kolli hills block in Namakkal district under SCPAR package-10
2021_RDTN_193871_10
1432/2019
Open Tender
Civil Works - Roads
Works
180 days
Kollihills
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.6 L
Yes
DRDA Namakkal
25 Feb 2021
5 Feb 2021
19 Feb 2021
5 Feb 2021
19 Feb 2021
10 Feb 2021
10 Feb 2021
Amount
Upgradation to the road from Navakkadu Meenatchiamman Kovil to melmenur Km 2/300 – 3/300 (R271)
Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers. Km 0/0-0/400
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) Km 0/0-0/400
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Km 0/0-0/400
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. Km 0/0-0/400
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete
Collection and Supply of cartted earth from approved quarry an average lead 1KM including cost and conveyance of all materials to site and labour charge sand staking then to departmental gauge to premeasurements to depatmental officer and stacking chaeges at site
Earth work excavation and depositing on bank with intial lead and lift in hard stiff clay, stiff black cotton, hard red earth, shales, moorums and ordinary gravelly soil etc. as per SS 20 A
Construction of Embakment/Subgrade the excavted earth with Consalidation with power roller rolling including all charges etc.complete
3.00 M Span Ch2480
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting butinclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation as 39
Providing laying Concerete for Plain/reinforced concerete in open foundation complete as per drawings and technical Foundation concerete 1:4:8
Stone masonry in cement Mortar in foundation of headed walls Complete as per drawing and MORd techinical specification Clause 1109 in Cement mortar
Supplying erecting and Steel Centering for followed plain surfaces with standard specifications
Providing and Laying cement concerete in super structure as per drawing and MORD technical Specification clause 800 1205 & 1205
Providing Plain reinforced cencerte in Super Structure complete as per drawings and mord techinical Specifications clause 800 Design Mix M25 etc complete
Supply fitting and Playing HYSD bar reinfocement (Fe 415)in super structure Complete as per drawings and techincal Specifications as per Schedule 1002,1010 and 1202 for MORD Design MIX
Plastering with Cement (1:4) 12mm thick on Masonary work in Sub-Structure as per MORD techinical Specification Clause 613.4 &1204
1.50M Span 2 Culverts ch 2410 TO 2885
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting butinclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation as 39
Providing laying Concerete for Plain/reinforced concerete in open foundation complete as per drawings and technical Foundation concerete 1:4:8
Stone masonry in cement Mortar in foundation of headed walls Complete as per drawing and MORd techinical specification Clause 1109 in Cement mortar
Supplying erecting and Steel Centering for followed plain surfaces with standard specifications
Providing and Laying cement concerete in super structure as per drawing and MORD technical Specification clause 800 1205 & 1205
Providing Plain reinforced cencerte in Super Structure complete as per drawings and mord techinical Specifications clause 800 Design Mix M25 etc complete
Supply fitting and Playing HYSD bar reinfocement (Fe 415)in super structure Complete as per drawings and techincal Specifications as per Schedule 1002,1010 and 1202 for MORD Design MIX
Plastering with Cement (1:4) 12mm thick on Masonary work in Sub-Structure as per MORD techinical Specification Clause 613.4 &1204
1.5 M Span Ch3020
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting butinclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation as 39
Providing laying Concerete for Plain/reinforced concerete in open foundation complete as per drawings and technical Foundation concerete 1:4:8
Stone masonry in cement Mortar in foundation of headed walls Complete as per drawing and MORd techinical specification Clause 1109 in Cement mortar
Supplying erecting and Steel Centering for followed plain surfaces with standard specifications
Providing and Laying cement concerete in super structure as per drawing and MORD technical Specification clause 800 1205 & 1205
Providing Plain reinforced cencerte in Super Structure complete as per drawings and mord techinical Specifications clause 800 Design Mix M25 etc complete
Supply fitting and Playing HYSD bar reinfocement (Fe 415)in super structure Complete as per drawings and techincal Specifications as per Schedule 1002,1010 and 1202 for MORD Design MIX
Plastering with Cement (1:4) 12mm thick on Masonary work in Sub-Structure as per MORD techinical Specification Clause 613.4 &1204
Hardbed Ch at ch 3/160 -3/300 140m
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting butinclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation as 39
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) Km 0/0-0/400
Cement Concrete 1:4:8 mix Using Hand Broken Granite 40 mm stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick. Compacting etc., complete complying within standard specification
Cement Concrete 1:3:6 Using 40 mm gauge Hand Broken Granite stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick. Compacting etc., complete complying within standard specification
Supply and erecting centering Shuttering including neccesary Supports for plane surface in foundation and basement and in all floors for RCC Column footing Column Plinth beam, beams, roof slabs,stair case steps bcd block etc complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Km 0/0-0/750
Construction of un-reinforce dowel jointed at expension and construction joint only,Plain cement Concerete pavement,Thickness as per design.over a prepared sub base with 43 grade cement or any other as per clause 1501.2.0 M30 (grade) etc Complete
Retaining wall
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting butinclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation as 39
Cement Concrete 1:4:8 mix Using Hand Broken Granite 40 mm stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick. Compacting etc., complete complying within standard specification
Ch2370-2400mR/S
Ch 2410-2450m R/s
Dry Stone Masonary Using New Rough Stones Including COST and Conveyence of all materials to site and labour charge etc
Ch2370-2400mR/S
Ch 2410-2450m R/s
Random Rubble Masonary in Cement Mortar 1:5 using new rough and bond Stones including cost and conveyance of all materials,labour charge sand Simultanoues Pointing the jointsin same et c complete
Plastering in Cement morter 1:4 12mm thick in all floors with standatrad Specification
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SR INFRAA
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .